Текст инструкции для поиска

Страница 1

Installation and Service Manual en United Kingdom These instructions include the Benchmark Commissioning Checklist and should be left with the user for safe keeping. They must be read in conjunction with the Flue Installation Guide. Gas Fired Wall Mounted Condensing System Boiler EcoBlue System 12 - 15 - 18 - 24 - 28 - 32

Страница 1 PDF

Страница 2

2 EcoBlue System 7219708 - 03 (03/17) You have just purchased one of our appliances and we thank you for the trust you have placed in our products. Please note that the product will provide good service for a longer period of time if it is regularly checked and maintained. Our customer support network is at your disposal at all times. The Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference. Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit www.centralheating.co.uk for more information. Building Regulations and the Benchmark Commissioning Checklist Building Regulations (England & Wales) require notification of the installation of a heating appliance to the relevant Local Authority Building Control Department. This can be achieved via a Competent Persons Self Certification Scheme as an option to notifying the Local Authority directly. The Health & Safety Executive operates the ‘Gas Safe Register’, a self- certification scheme for gas heating appliances. This company is a member of the Benchmark initiative and fully supports the aims of the programme. Its aim is to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency. Building Regulations require that installations should comply with manufacturer's instructions. It is therefore important that the commissioning checklist is completed by the installer. The relevant section of Building Regulations only relates to dwellings. Therefore the checklist only applies if the appliance is being installed in a dwelling or some related structure. The flowchart opposite gives guidance for installers on the process necessary to ensure compliance with Building Regulations. Model Range Baxi EcoBlue 12 System ErP G.C.No 41-470-23 Baxi EcoBlue 15 System ErP G.C.No 41-470-24 Baxi EcoBlue 18 System ErP G.C.No 41-470-25 Baxi EcoBlue 24 System ErP G.C.No 41-470-26 Baxi EcoBlue 28 System ErP G.C.No 41-470-27 Baxi EcoBlue 32 System ErP G.C.No 41-470-28 Most illustrations in this document show the 12/15/18/24/28 models. Where the detail for 32 model differs it is described in the text and see also Section 14.1 ‘32 Model Supplement’. 0086 ISO 9001 FM 00866

Страница 2 PDF

Страница 3

7219708 - 03 (03/17) EcoBlue System 3 Installer Notification Guidelines Choose Building Regulations Notification Route Contact your relevant Local Authority Building Control (LABC) who will arrange an inspection or contact a government approved inspector LABC will record the data and will issue a certificate of compliance ‘Gas Safe Register’ will issue a Building Regulations Compliance Certificate to the property owner and inform the relevant LABC You must ensure that the certificate number issued by the ‘Gas Safe Register’ is written onto the Benchmark Checklist Scheme Members only Call ‘Gas Safe Register’ on: 0800 408 5577 or log onto: www.gassaferegister.co.uk within 10 days If you notify via the ‘Gas Safe Register’, the register will issue the Building Regulations certificate on members’ behalf Complete the Benchmark Checklist Install and Commission this appliance to manufacturer's instructions Competent Person's Self Certification Scheme Building Control Complete the Benchmark Checklist Install and Commission this appliance to manufacturer's instructions Installer Notification Guidelines

Страница 3 PDF

Страница 4

4 EcoBlue System 7219708 - 03 (03/17) Contents Contents 1 Introduction 1.1 General 1.2 Additional Documentation 1.3 Symbols Used 1.4 Abbreviations 1.5 Extent of Liabilities 1.5.1 Manufacturer’s Liability 1.5.2 Installer’s Responsibility 1.6 Homologations 1.6.1 CE Marking 1.6.2 Standards 2 Safety 2.1 General Safety Instructions 2.2 Recommendations 2.3 Specific Safety Instructions 2.3.1 Handling 3 Technical Specifications 3.1 Technical Data 3.2 Technical Parameters 3.3 Dimensions and Connections 3.4 Electrical Diagram 4 Description of the Product 4.1 General Description 4.2 Operating Principle 4.2.1 Central Heating Mode 4.2.2 Boiler Frost Protection Mode 4.2.3 Pump Protection 4.3 Main Components 4.4 Control Panel Description 4.5 Standard Delivery 4.6 Accessories & Options 4.6.1 Optional Extras 5 Before Installation 5.1 Installation Regulations 5.2 Installation Requirements 5.2.1 Gas Supply 5.2.2 Electrical Supply 5.2.3 Hard Water Areas 5.2.4 Bypass 5.2.5 System Control 5.2.6 Treatment of Water Circulating Systems 5.2.7 Expansion Vessel (CH only) 5.2.8 Safety Pressure Relief Valve 5.3 Choice of the Location 5.3.1 Location of the Appliance 5.3.2 Data Plate 5.3.3 Bath & Shower Rooms 5.3.4 Ventilation 5.3.5 Condensate Drain 5.3.6 Clearances 5.3.7 Flue/Chimney Location 5.3.8 Horizontal Flue/Chimney Systems 7 7 7 8 8 9 9 10 10 10 11 12 12 12 13 13 14 14 16 17 18 19 19 20 20 20 20 21 22 23 23 23 24 24 25 25 25 25 25 25 26 26 27 27 28 28 28 28 29 31 32 34

Страница 4 PDF

Страница 5

7219708 - 03 (03/17) EcoBlue System 5 Contents Contents 5.3.9 Flue/Chimney Lengths 5.3.10 Flue/Chimney Trim 5.3.11 Terminal Guard 5.3.12 Flue/Chimney Deflector 5.3.13 Flue/Chimney Accessories 5.4 Transport 5.5 Unpacking & Initial Preparation 5.5.1 Unpacking 5.5.2 Initial Preparation 5.5.3 Flushing 5.6 Connecting Diagrams 5.6.1 System Filling and Pressurising 6 Installation 6.1 General 6.2 Assembly 6.2.1 Fitting the Pressure Relief Discharge Pipe 6.2.2 Connecting the Condensate Drain 6.3 Preparation 6.3.1 Panel Removal 6.4 Air Supply / Flue Gas Connections 6.4.1 Connecting the Flue/Chimney 6.5 Electrical Connections 6.5.1 Electrical Connections of the Appliance 6.5.2 Connecting External Devices 6.6 Filling the Installation 6.7 External Controls 6.7.1 Installation of External Sensors 6.7.2 Optional Outdoor Sensor 7 Commissioning 7.1 General 7.2 Checklist before Commissioning 7.2.1 Preliminary Electrical Checks 7.2.2 Checks 7.3 Commissioning Procedure 7.3.1 De-Aeration Function 7.4 Gas Settings 7.4.1 Check Combustion - ‘Chimney Sweep’ Mode 7.5 Configuring the System 7.5.1 Check the Operational (Working Gas Inlet Pressure & Gas Rate) 7.6 Final Instructions 7.6.1 Handover 7.6.2 System Draining 8 Operation 8.1 General 8.2 To Start-Up 8.3 To Shutdown 8.4 Use of the Control Panel 8.5 Frost Protection 9 Settings 9.1 Parameters 35 35 35 35 35 35 36 36 36 37 37 37 38 38 38 38 39 39 39 40 40 42 42 42 42 43 43 43 44 44 44 44 44 45 45 45 45 47 47 47 47 48 49 49 49 49 50 50 51 51

Страница 5 PDF

Страница 6

6 EcoBlue System 7219708 - 03 (03/17) Contents 10 Maintenance 10.1 General 10.2 Standard Inspection & Maintenance Operation 10.3 Specific Maintenance Operations Changing Components 10.3.1 Spark Ignition & Flame Sensing Electrodes 10.3.2 Fan 10.3.3 Air / Gas Venturi 10.3.4 Burner 10.3.5 Insulation 10.3.6 Flue Sensor 10.3.7 Igniter 10.3.8 Heating Flow & Return Sensors 10.3.9 Safety Thermostat 10.3.10 Pump - Head Only 10.3.11 Pump - Complete 10.3.12 Automatic Air Vent 10.3.13 Safety Pressure Relief Valve 10.3.14 Heating Pressure Gauge 10.3.15 Hydraulic Pressure Sensor 10.3.16 Main P.C.B. 10.3.17 Boiler Control P.C.B. 10.3.18 Expansion Vessel 10.3.19 Gas Valve 10.3.20 Setting the Gas Valve (CO2 Check) 11 Troubleshooting 11.1 Error Codes 11.2 Fault Finding 12 Decommissioning Procedure 12.1 Decommissioning Procedure 13 Spare Parts 13.1 General 13.2 Spare Parts List 14 32 Model Supplement 15 Benchmark Commissioning Checklist 52 52 53 54 54 55 55 56 56 57 57 57 57 58 58 58 59 59 60 61 61 62 62 63 64 64 64 69 69 70 70 70 71 76

Страница 6 PDF

Страница 7

7219708 - 03 (03/17) EcoBlue System 7 Introduction 1 1 Introduction 1.1 General WARNING Installation, repair and maintenance must only be carried out only by a competent person. This document is intended for use by competent persons. All Gas Safe registered engineers carry an ID card with their licence number and a photograph. You can check your engineer is registered by telephoning 0800 408 5500 or online at www.gassaferegister.co.uk This appliance must be installed in accordance with the manufacturer’s instructions and the regulations in force. If the appliance is sold or transferred, or if the owner moves leaving the appliance behind you should ensure that the manual is kept with the appliance for consultation by the new owner and their installer. Read the instructions fully before installing or using the appliance. In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations (as may be amended from time to time). Definition of competence: A person who works for a Gas Safe registered company and holding current certificates in the relevant ACS modules, is deemed competent. In IE, this must be carried out by a competent person as stated in I.S. 813 “Domestic Gas Installations”. The addition of anything that may interfere with the normal operation of the appliance without express written permission from the manufacturer or his agent could invalidate the appliance warranty. In GB this could also infringe the Gas Safety (Installation and Use) Regulations. The appliance is designed as a boiler for use in residential domestic environments on a governed meter supply only. The selection of this boiler is entirely at the owner’s risk. If the appliance is used for purposes other than or in excess of these specifications, the manufacturer will not accept any liability for resulting loss, damage or injury. The manufacturer will not accept any liability whatsoever for loss, damage or injury arising as a result of failure to observe the instructions for use, maintenance and installation of the appliance. WARNING Check the information on the data plate is compatible with local supply conditions. 1.2 Additional Documentation These Installation & Service Instructions must be read in conjunction with the Flue Installation Guide supplied in the Literature Pack. Various timers, external controls, etc. are available as optional extras. Full details are contained in the relevant sales literature. Warning This boiler can be used by children aged 8 years and above and by persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge when they have been given supervision or instruction concerning the safe use of the device and understand the resulting risks. Children must not be allowed to play with the appliance. Cleaning and user maintenance must not be carried out by children without supervision.

Страница 7 PDF

Страница 8

8 EcoBlue System 7219708 - 03 (03/17) 1 Introduction 1.3 Symbols Used In these instructions, various levels are employed to draw the user's attention to particular information. In so doing, we wish to safeguard the user's safety, prevent hazards and guarantee correct operation of the appliance. Each level is accompanied by a warning triangle DHW: Domestic hot water CH: Central heating GB: Great Britain IE: Ireland BS: British standard HHIC: Heating and Hotwater Industry Council Pn: Nominal output Pnc: Condensing output Qn: Nominal heat input Hs: Gross calorific value DANGER Risk of a dangerous situation causing serious physical injury. WARNING Risk of a dangerous situation causing slight physical injury. CAUTION Risk of material damage. Signals important information . Signals a referral to other instructions or other pages in the instructions. 1.4 Abbreviations

Страница 8 PDF

Страница 9

7219708 - 03 (03/17) EcoBlue System 9 Introduction 1 1.5 Extent of Liabilities 1.5.1 Manufacturer's Liability Our products are manufactured in compliance with the requirements of the various european applicable Directives. They are therefore delivered with marking and all relevant documentation. In the interest of customers, we are continuously endeavouring to make improvements in product quality. All the specifications stated in this document are therefore subject to change without notice. The manufacturer will not accept any liability for loss, damage or injury arising as a result of:- Failure to abide by the instructions on using the appliance. Failure to regularly maintain the appliance, or faulty or inadequate maintenance of the appliance. Failure to abide by the instructions on installing the appliance. This company declares that no substances harmful to health are contained in the appliance or used during appliance manufacture. The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force, and only used in a suitably ventilated location. In GB, the installation must be carried out by a Gas Safe Registered Installer. It must be carried out in accordance with the current and relevant requirements of legislation and guidance including the:- • Gas Safety (Installation & Use) Regulations. • The appropriate Building Regulations either The Building Regulations, The Building Regulations (Scotland), Building Regulations (Northern Ireland). • The Water Fittings Regulations or Water Byelaws in Scotland. • The Current I.E.E. Wiring Regulations. Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice. In IE, the installation must be carried out by a competent person and installed in accordance with the current edition of I.S. 813 ‘Domestic Gas Installations’, the current Building Regulations and reference should be made to the current ETCI rules for electrical installation. Prior to commissioning all systems must be thoroughly flushed and treated with inhibitor (see section 5.2.6). Failure to do so will invalidate the appliance warranty. Incorrect installation could invalidate the warranty and may lead to prosecution.

Страница 9 PDF

Страница 10

10 EcoBlue System 7219708 - 03 (03/17) 1 Introduction 1.5.2 Installer's Responsibility The installer is responsible for the installation and initial start up of the appliance. The installer must adhere to the following instructions: Read and follow the instructions given in the manuals provided with the appliance. Carry out installation in compliance with the prevailing legislation and standards. Ensure the system is flushed and inhibitor added. Install the flue/chimney system correctly ensuring it is operational and complies with prevailing legislation and standards, regardless of location of the boiler’s installation. Only the installer should perform the initial start up and carry out any checks necessary. Explain the installation to the user. Complete the Benchmark Commissioning Checklist - this is a condition of the warranty ! Warn the user of the obligation to check the appliance and maintain it in good working order. Give all the instruction manuals to the user. 1.6 Homologations 1.6.1 CE Marking EC - Declaration of Conformity Baxi Heating UK Limited being the manufacturer / distributor within the European Economic Area of the following Baxi EcoBlue 12 - 15 - 18 - 24 - 28 - 32 System ErP declare that the above is in conformity with the provisions of the Council Directive 2009/142/EC 92/42/EEC 2004/108/EC 2006/95/EC 2009/125/EC 2010/30/EU and has been subject to the following conformity procedures laid down in Annex 2 - Article 3 of 2009/142/EC under the supervision of the British Standards Institution, a Notified Body authorized by the United Kingdom Competent Authority, and carrying the Notified Body Number 0086. Type test for purpose of Regulation 5 certified by: Notified Body 0085. Product/Production certified by: Notified Body 0086. For GB/IE only.

Страница 10 PDF

Страница 11

7219708 - 03 (03/17) EcoBlue System 11 Introduction 1 1.6.2 Standards Codes of Practice - refer to the most recent version In GB the following Codes of Practice apply: Standard Scope BS 6891 Gas Installation. BS 5546 Installation of hot water supplies for domestic purposes. BS EN 12828 Heating systems in buildings. BS EN 12831 Heating systems in buildings - Calculation of load. BS EN 14336 Installation & commissioning of water based heating systems. BS 6798 Installation of gas fired hot water boilers. BS 5440 Part 1 Flues. BS 5440 Part 2 Ventilation. BS 7074 Expansion vessels and ancillary equipment for sealed water systems. BS 7593 Treatment of water in domestic hot water central heating systems. BS 4814 Specification for Expansion Vessels using an internal diaphragm, for sealed hot water systems. IGE/UP/7/1998 Guide for gas installations in timber framed housing. In IE the following Codes of Practice apply: Standard Scope I.S. 813 Domestic Gas Installations. The following standards give valuable additional information; BS 5546 Installation of hot water supplies for domestic purposes. BS EN 12828 Heating systems in buildings. BS EN 12831 Heating systems in buildings - Calculation of load. BS EN 14336 Installation & commissioning of water based heating systems. BS 7074 Expansion vessels and ancillary equipment for sealed water systems. BS 7593 Treatment of water in domestic hot water central heating systems.

Страница 11 PDF

Страница 12

12 EcoBlue System 7219708 - 03 (03/17) 2 Safety 2 Safety 2.1 General Safety Instructions 2.2 Recommendations WARNING Installation, repair and maintenance must be carried out by a Gas Safe Registered Engineer (in accordance with prevailing local and national regulations). When working on the boiler, always disconnect the boiler from the mains and close the main gas inlet valve. After maintenance or repair work, check the installation to ensure that there are no leaks. CAUTION The boiler should be protected from frost. Only remove the casing for maintenance and repair operations. Replace the casing after maintenance and repair operations. DANGER If you smell gas: 1. Turn off the gas supply at the meter 2. Open windows and doors in the hazardous area 3. Do not operate light switches 4. Do not operate any electrical equipment 5. Do not use a telephone in the hazardous area 6. Extinguish any naked flame and do not smoke 7. Warn any other occupants and vacate the premises 8. Telephone the National Gas Emergency Service on:- 0800 111 999

Страница 12 PDF

Страница 13

7219708 - 03 (03/17) EcoBlue System 13 Safety 2 2.3 Specific Safety Instructions 2.3.1 Handling General • The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance. • Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands. Health & Safety is the responsibility of EVERYONE. • There is no ‘safe’ limit for one man - each person has different capabilities. The boiler should be handled and lifted by TWO PEOPLE. • Do not handle or lift unless you feel physically able. • Wear appropriate Personal Protection Equipment e.g. protective gloves, safety footwear etc. Preparation • Co-ordinate movements - know where, and when, you are both going. • Minimise the number of times needed to move the boiler - plan ahead. • Always ensure when handling or lifting the route is clear and unobstructed. If possible avoid steps, wet or slippery surfaces, unlit areas etc. and take special care on ladders/into lofts. Technique • When handling or lifting always use safe techniques - keep your back straight, bend your knees. Don’t twist - move your feet, avoid bending forwards and sideways and keep the load as close to your body as possible. • Where possible transport the boiler using a sack truck or other suitable trolley. • Always grip the boiler firmly, and before lifting feel where the weight is concentrated to establish the centre of gravity, repositioning yourself as necessary. See the ‘Installation’ section of these instructions for recommended lift points. Remember • The circumstances of each installation are different. Always assess the risks associated with handling and lifting according to the individual conditions. • If at any time when installing the boiler you feel that you may have injured yourself STOP !! DO NOT ‘work through’ the pain - you may cause further injury. IF IN ANY DOUBT DO NOT HANDLE OR LIFT THE BOILER - OBTAIN ADVICE OR ASSISTANCE BEFORE PROCEEDING !

Страница 13 PDF

Страница 14

14 EcoBlue System 7219708 - 03 (03/17) 3 Technical Specifications 3 Technical Specifications 3.1 Technical Data Flue Terminal Diameter 100mm Dimensions Projection 125mm Outercase Dimensions Casing Height - 700mm Overall Height Inc Flue Elbow - 860mm Casing Width - 390mm Casing Depth - 295mm Central Heating Primary Circuit Pressures bar Safety Discharge 3 Max Operating 2.5 Min Operating 0.5 Recommended Operating Range 1-2 Expansion Vessel - (For Central Heating only. Integral with appliance) bar Min Pre-charge Pressure 1.0 litre Max Capacity of CH System 100 Primary Water Content of Boiler (unpressurised) 2.5 Connections copper tails Gas Inlet - 22mm Heating Flow - 22mm Heating Return - 22mm Pressure Relief Discharge - 15mm Temperatures Boiler Flow Temp (adjustable) 25°C to 80°C max (± 5°C) Clearances Above Casing 175 mm Min Below Casing 150 mm* Min Front 450 mm Min (For Servicing) Front 5 mm Min (In Operation) L.H. Side 5 mm Min R.H. Side 5 mm Min *This is MINIMUM recommended dimension. Greater clearance will aid installation and maintenance. Heat Input Qn Hs (gross) Max Min 12 model kW 13.32 2.66 15 model kW 16.65 3.44 18 model kW 19.98 3.99 24 model kW 26.64 5.22 28 model kW 31.08 5.88 Heat Output Pn (Non-Condensing) Max Min 12 model kW 12.0 2.3 15 model kW 15.0 3.0 18 model kW 18.0 3.5 24 model kW 24.0 4.6 28 model kW 28.0 5.1 Electrical Supply 230V~ 50Hz (Appliance must be connected to an earthed supply) Electrical Protection IPX5D (without integral timer) IP20 (with integral timer) Internal Fuse Rating F2L Appliance Category CAT I 2H Heat Output Pnc (Condensing) Max Min 12 model kW 12.7 2.5 15 model kW 15.9 3.3 18 model kW 19.0 3.8 24 model kW 25.4 4.9 28 model kW 29.6 5.6 Condensate Drain To accept 21.5mm (3/4 in) plastic waste pipe External Fuse Rating 3A Power Consumption 12 model W 75 15 model W 80 18 model W 80 24 model W 85 28 model W 90 NOTE: All data in this section are nominal values and subject to normal production tolerances. Appliance Type C13 C33 C53 NOx Class 5 Weights (12/15/18/24 models) Packaged Boiler Carton 37.1kg Installation Lift Weight 32.5kg (28 model) Packaged Boiler Carton 39.1kg Installation Lift Weight 34.5kg Gas Nozzle Injector 12 model mm Ø 3.8 15 model mm Ø 4.2 18 model mm Ø 4.2 24 model mm Ø 5.0 28 model mm Ø 5.6 See Section 14.1 ‘32 Model Supplement’ for data specific to the 32 model

Страница 14 PDF

Страница 15

7219708 - 03 (03/17) EcoBlue System 15 Technical Specifications 3 0 200 400 600 800 1000 1200 0.5 1 1.5 2 2.5 3 3.5 4 Metre (wg) Flow Rate (l/h) Pump - Available Head 0 5 5.5 6 4.5 Pump Available Head See graph below Dynamic (nominal) Inlet Pressure (Natural Gas - G20) mbar 20 with a CV of 37.78 MJ/m3 Max Gas Rate (Natural Gas - G20) (After 10 mins) 12 model m3/h 1.27 15 model m3/h 1.58 18 model m3/h 1.90 24 model m3/h 2.54 28 model m3/h 2.96 NATURAL GAS ONLY ! SAP 2009 Annual Efficiency is 12 model - 89.2% 15,18,24,28,32 models - 89.1% This value is used in the UK Government’s Standard Assessment Procedure (SAP) for energy rating of dwellings. The test data from which it has been calculated has been certified by 0085. Product Characteristics Database (SEDBUK) NOTE: All data in this section are nominal values and subject to normal production tolerances. 3.1 Technical Data (cont) See Section 14.1 ‘32 Model Supplement’ for data specific to the 32 model

Страница 15 PDF

Страница 16

16 EcoBlue System 7219708 - 03 (03/17) 3 Technical Specifications 3.2 Technical Parameters Technical parameters for boiler space heaters Condensing boiler Low-temperature boiler(1) B1 boiler Cogeneration space heater Combination heater Useful heat output at rated heat output and high temperature regime Useful heat output at 30% of rated heat output and low temperature regime(1) Useful efficiency at rated heat output and high temperature regime(2) Useful efficiency at 30% of rated heat output and low temperature regime(1) Full load Part load Standby mode Standby heat loss Ignition burner power consumption Annual energy consumption Sound power level, indoors Emissions of nitrogen oxides (1) Low temperature means for condensing boilers 30°C, for low temperature boilers 37°C and for other heaters 50°C return temperature (at heater inlet). (2) High temperature regime means 60°C return temperature at heater inlet and 80°C feed temperature at heater outlet. See The back cover for contact details. Baxi EcoBlue System ErP Rated heat output Seasonal space heating energy efficiency Auxiliary electricity consumption Other items Prated kW P4 kW P1 kW Šs % Š4 % Š1 % elmax kW elmin kW PSB kW Pstby kW Pign kW QHE kWh GJ LWA dB NOX mg/kWh 12 15 18 24 32 28 Yes No No 12 15 18 24 28 32 12.0 15.0 18.0 24.0 28.0 32.0 Yes Yes Yes Yes Yes No No No No No No No No No No No No No No No No No No No No No No 4.0 5.0 6.0 8.0 9.4 10.7 93 93 93 93 93 93 88.1 88.0 88.0 87.9 87.9 87.9 98.2 98.1 98.1 98.0 98.0 98.0 0.035 0.040 0.040 0.045 0.050 0.050 0.014 0.014 0.014 0.014 0.014 0.014 0.003 0.003 0.003 0.003 0.003 0.003 0.035 0.035 0.035 0.035 0.040 0.045 - - - - - - 10323 12903 15484 20645 24086 27527 37 46 56 74 87 99 55 55 56 53 56 59 20 16 16 24 22 24

Страница 16 PDF

Страница 17

7219708 - 03 (03/17) EcoBlue System 17 Technical Specifications 3 3.3 Dimensions and Connections Dimensions A 700mm B 295mm C 390mm D 116mm Ø Min. E 160mm (207mm for 80/125mm flue systems) F 130mm G 106mm H 228mm J 162mm 360° Orientation Flue Ø 100mm D C B A E G F At least 1.5° H J Pressure Relief Valve (15mm) Condensate Drain 38.5mm 26.5 mm 130mm 130mm 65 mm 162.5 mm (PRV) Heating Return (22mm) Heating Flow (22mm) Gas Inlet (22mm) Tap Rail There must be no part of the air duct (white tube) visible outside the property. See Section 14.1 ‘32 Model Supplement’ for dimensions specific to the 32 model

Страница 17 PDF

Страница 18

18 EcoBlue System 7219708 - 03 (03/17) 3 Technical Specifications 3.4 Electrical Diagram Link b g/y y br Mains Input Cable N E L X20 X21 X30 X42 X41 X40 X60 X23 X22 X50 X10 X11 X12 X13 X14 X1 X2 Boiler Controls Heating Return Sensor Heating Flow Sensor Igniter Spark Ignition Electrode Flame Sensing Electrode Gas Valve Fan Safety Thermostat b br br b g/y b g/y bk g br b b b g/y g/y br b bk g r b b r br b b br g bk Hydraulic Pressure Switch Pump w r bk br bk p y bk r g M2 Low Voltage External Control Connection 1 2 3 4 5 1 2 6 7 8 9 10 M1 Mains Voltage Connection bk /R /P + + R 1 2 3 4 5 b br g/y Timer Connector Timer Bridge Flue Sensor b b g g br b g/y b br b br Key To Wiring Colours b - Blue bk - Black br - Brown w - White gr - Grey r - Red g - Green g/y - Green/Yellow y - Yellow p - Purple

Страница 18 PDF

Страница 19

7219708 - 03 (03/17) EcoBlue System 19 Description of the Product 4 4 Description of the Product 4.1 General Description 1. The Baxi EcoBlue System boilers are fully automatic gas fired wall mounted condensing boilers. They are room sealed and fan assisted, and will serve central heating and stored domestic hot water. 2. The boiler is set to give a maximum output of :- 12 model - 12 kW 12.7 kW Pnc (Condensing) 15 model - 15 kW 15.9 kW Pnc (Condensing) 18 model - 18 kW 19 kW Pnc (Condensing) 24 model - 24 kW 25.4 kW Pnc (Condensing) 28 model - 28 kW 29.6 kW Pnc (Condensing) 32 model - 32 kW 33.8 kW Pnc (Condensing) 3. The boiler is factory set for use on Natural Gas (G20). 4. The boiler is suitable for use only on fully pumped sealed heating systems. 5. The boiler data badge gives details of the model, serial number and Gas Council number and is situated on the boiler lower panel. It is visible when the control box is lowered (Fig. 2). 6. The boiler model, serial number and Gas Council number are also shown on the information label behind the boiler control flap (Fig. 1). This is for user reference. 7. The boiler is intended to be installed in residential/domestic environments on a governed meter supply only. 8. The boiler must be installed with one of the purpose designed flues such as one of the standard horizontal telescopic flue kits detailed in the Flue Installation Guide . All systems must be thoroughly cleansed, flushed and treated with inhibitor (see section 5.2.6). These Installation & Servicing Instructions MUST be read in conjunction with the Flue Installation Guide supplied in the Literature Pack. There are a number of dimensional differences between the 32 model and the lower output versions. These are detailed in Section 14. Also the position of the expansion vessel differs - it is at the left on 32, and the flue adaptor on the 32 is offset to the right when viewed from the front - other models have the adaptor to the left. Fig. 1 Fig. 2 Boiler Control Flap Information Label Data Badge Control Box removed for clarity

Страница 19 PDF

Страница 20

20 EcoBlue System 7219708 - 03 (03/17) 4 Description of the Product 4.2 Operating Principle 4.2.1 Central Heating Mode 1. With a demand for heating, the pump circulates water through the primary circuit. 2. Once the burner ignites the fan speed controls the gas rate to maintain the heating temperature measured by the temperature sensor. 3. When the flow temperature exceeds the setting temperature, a 3 minute delay occurs before the burner relights automatically (anti-cycling). The pump continues to run during this period. 4. When the demand is satisfied the burner is extinguished and the pump continues to run for a period of 3 minutes (pump overrun). 4.2.2 Boiler Frost Protection Mode 1. The frost protection mode is integral to the appliance and functions as long as there is power to the boiler, as indicated by the standby signal . 2. With the boiler in ‘On’ mode and when the boiler temperature falls below 5°C the boiler will fire until a temperature of 30°C is reached. 3. Further protection can be incorporated by using a system frost thermostat. 4.2.3 Pump Protection 1. This activates once a week if there has been no demand. The pump runs for 30 seconds to prevent sticking. Boiler Schematic Layout To operate the boiler must be set so that the symbol is displayed. Press the button to display the symbol. N.B. If only is displayed the boiler will not operate ! Key 1. Pump with Automatic Air Vent 2. CH System Pressure Gauge 3. Central Heating Filter 4. Non-return valve 5. Hydraulic Pressure Sensor 6. Boiler Drain Tap 7. Pressure Relief Valve 8. Condensate Trap 9. Gas Valve 10. Safety Thermostat (105°C) 11. Heating Flow Sensor 12. Flue Sensor 13. Boiler Adaptor 14. Primary Heat Exchanger 15. Spark Ignition Electrode 16. Burner 17. Flame Sensing Electrode 18. Air/Gas Collector 19. Heating Return Sensor 20. Fan 21. Air-Gas Venturi 22. Expansion Vessel Connections:- A – Condensate Drain B – Heating Flow C – Gas Inlet D – Heating Return 1 2 3 4 5 6 7 8 9 10 11 12 13 15 18 14 16 17 19 20 21 22 A B C D

Страница 20 PDF

Страница 21

EV1 EV1 EV2 EV2 P. OUT P. OUT 1 2 3 4 1 2 3 4 VENT VENT RQ RQ ADJ. ADJ. 7219708 - 03 (03/17) EcoBlue System 21 Description of the Product 4 4.3 Main Components 1. Expansion Vessel (Note: This component is at the left on 32 model) 2. Boiler Adaptor 3. Primary Heat Exchanger 4. Pump with Automatic Air Vent 5. Central Heating System Pressure Gauge 6. Fan Assembly with Venturi 7. Expansion Vessel Locating Stud 8. Flame Sensing Electrode 9. Air/Gas Collector 10. Spark Ignition Electrode 11. Combustion Box Cover & Burner 12. Control Box Display 13. Condensate Trap 14. Safety Pressure Relief Valve 15. Gas Valve 16. Boiler Controls 17. Boiler Control Box 18. Boiler Drain Tap 19. Heating Flow Sensor 20. Safety Thermostat 21. Igniter 3 7 14 4 6 9 10 11 12 17 1 2 18 15 19 20 21 8 16 13 5

Страница 21 PDF

Страница 22

22 EcoBlue System 7219708 - 03 (03/17) 4 Description of the Product 4.4 Control Panel Description /R /P + + R EcoBlue R R DHW and CH OFF (frost protection still enabled) Indicate errors that prevent burner from igniting Error - Not resettable by user Water pressure too low Indicates an error resettable by the user Indicates navigation in programming mode (parameter) Indicates navigation in programming mode Generic error Burner lit Inactive mode (if this only displayed boiler will not operate) Heating mode (symbol will flash with demand) Units for temperature Units for pressure Display Description Central Heating (CH) Temperature Adjustment Boiler Information View Standby - Reset - Esc R Standby - Reset - Esc Button Boiler Information View Button Increase CH Temperature Button Decrease CH Temperature Button Inactive Button Inactive Button On/Off Selector Button Key to Controls Display showing all available characters On/Off Selector Button When is displayed (Boiler On) the boiler will respond to timed Heating or Hot Water demand. N.B. If only is displayed the boiler will not operate ! THESE BUTTONS INACTIVE ! except when an outdoor sensor relay kit is connected Except when an outdoor sensor relay kit is connected

Страница 22 PDF

Страница 23

7219708 - 03 (03/17) EcoBlue System 23 Description of the Product 4 4.5 Standard Delivery 1. The pack contains: Boiler Wall mounting plate (pre-plumbing jig) including isolation valves Fittings pack Literature pack • Installation & Servicing Manual (including ‘benchmark’) • User Guide • Flue Accessories & Fitting Guide • Registration Card • Fernox Leaflet • Wall Template • Product Leaflet • Package Leaflet 4.6 Accessories & Options 4.6.1 Optional Extras 1. Various timers, external controls, etc. are available as optional extras. System Outdoor Sensor Relay Kit ---------------- 7214286 Two Channel Wired Programmer Kit ------------- 7212443 Mechanical Room Thermostat --------------------- 7209716 Flue Accessories (elbows, extensions, clamps etc.) (refer to the Flue Accessories & Fitting Guide supplied in the literature pack.) Remote relief valve kit ------------------------------- 5121379 Boiler discharge pump ------------------------------- 720648301 1M Drain Pipe ‘Trace Heating’ Element --------- 720644401 2M Drain Pipe ‘Trace Heating’ Element --------- 720664101 3M Drain Pipe ‘Trace Heating’ Element --------- 720664201 5M Drain Pipe ‘Trace Heating’ Element --------- 720664401* *Where the drain is between 3 & 5 metres a 5 metre kit can be used and “doubled back” upon itself. Any of the above MUST be fitted ONLY by a qualified competent person. Further detail can be found in the relevant sales literature and at www.baxi.co.uk

Страница 23 PDF

Страница 24

24 EcoBlue System 7219708 - 03 (03/17) 5 Before Installation 5 Before Installation 5.1 Installation Regulations Installation must be carried out in accordance with the prevailing regulations, the codes of practice and the recommendations in these instructions. Please refer to 1.5.1 and 1.6.2 Installation must also respect this instruction manual and any other applicable documentation supplied with the boiler. WARNING Installation, repair and maintenance must only be carried out only by a competent person. This document is intended for use by competent persons,

Страница 24 PDF

Страница 25

7219708 - 03 (03/17) EcoBlue System 25 Before Installation 5 5.2 Installation Requirements 5.2.1 Gas Supply 1. The gas installation should be in accordance with the relevant standards. In GB this is BS 6891 (NG). In IE this is the current edition of I.S. 813 “Domestic Gas Installations”. 2. The connection to the appliance is a 22mm copper tail located at the rear of the gas service cock (Fig. 3). 3. Ensure that the pipework from the meter to the appliance is of adequate size, and the demands of any other gas appliances in the property are taken into consideration. Do not use pipes of a smaller diameter than the boiler gas connection (22mm) UNLESS the stated gas rate can be achieved with pipe of lesser diameter and with all other gas appliances operating at maximum rate. 4. The gas service cock incorporates a pressure test point. The service cock must be on to check the pressure. 5.2.2 Electrical Supply 1. External wiring must be correctly earthed, polarised and in accordance with relevant regulations/rules. In GB this is the current I.E.E. Wiring Regulations. In IE reference should be made to the current edition of ETCI rules. 2. The mains supply is 230V ~ 50Hz fused at 3A. The method of connection to the electricity supply must facilitate complete electrical isolation of the appliance. A PERMANENT LIVE is required ! Connection may be via a fused double-pole isolator with a contact separation of at least 3mm in all poles and servicing the boiler and system controls only. 5.2.3 Hard Water Areas Only water that has NOT been artificially softened must be used when filling or re-pressurising the primary system. If the mains cold water to the property is fitted with an artificial softening/treatment device the source utilised to fill or re-pressurise the system must be upstream of such a device. 5.2.4 Bypass 1. The boiler is fitted with an automatic integral bypass. 5.2.5 System Control 1. Further external controls (e.g. room thermostat sensors) MUST be fitted to optimise the economical operation of the boiler in accordance with Part L of the Building Regulations. A range of optional controls is available. Full details are contained in the relevant Sales Literature. Gas Service Cock Fig. 3

Страница 25 PDF

Страница 26

26 EcoBlue System 7219708 - 03 (03/17) 5 Before Installation 5.2.6 Treatment of Water Circulating Systems 1. All recirculatory water systems will be subject to corrosion unless they are flushed and an appropriate water treatment is applied. To prevent this, follow the guidelines given in BS 7593 “Treatment of Water in Domestic Hot Water Central Heating Systems” and the treatment manufacturers instructions. 2. Treatment must involve the use of a proprietary cleanser, such as Sentinel X300 or X400, or Fernox F3 and an inhibitor such as Sentinel X100 or Fernox MB-1. 3. Full instructions are supplied with the products. For further information contact Sentinel (0800 389 4670) or Fernox (0870 870 0362). Failure to flush and add inhibitor to the system will invalidate the appliance warranty. 4. It is important to check the inhibitor concentration after installation, system modification and at every service in accordance with the inhibitor manufacturer’s instructions. (Test kits are available from inhibitor stockists.) 5. Complete the label supplied with the inhibitor and attach to the inside of the boiler case. Detail of system treatment should be added for future reference. 6. For information or advice regarding any of the above contact Baxi Customer Support 0344 871 1525. 5.2.7 Expansion Vessel (CH only) 1. The appliance expansion vessel is pre-charged to 1.0 bar. Therefore, the minimum cold fill pressure is 1.0 bar. The vessel is suitable for correct operation for system capacities up to 100 litres (155 litres for 32 model). For greater system capacities an additional expansion vessel must be fitted. For GB refer to BS 7074 Pt 1. For IE, the current edition of I.S. 813 “Domestic Gas Installations”. 2. Checking the charge pressure of the vessel - to check the charge accurately ensure the system is cold. It is also necessary to relieve the pressure by draining the boiler. Using a suitable gauge check the pressure at the valve on the underside of the vessel. Adjust the pressure as required and repressurise the system.

Страница 26 PDF

Страница 27

7219708 - 03 (03/17) EcoBlue System 27 Before Installation 5 5.2.8 Safety Pressure Relief Valve See B.S. 6798 for full details. 1. The pressure relief valve (Fig. 5) is set at 3 bar, therefore all pipework, fittings, etc. should be suitable for pressures in excess of 3 bar and temperature in excess of 100°C. 2. The pressure relief discharge pipe should be not less than 15mm diameter, run continuously downward, and discharge outside the building, preferably over a drain. It should be routed in such a manner that no hazard occurs to occupants or causes damage to wiring or electrical components. If it is anticipated that any part of the pipe may be subject to freezing it should be suitably insulated. The end of the pipe should terminate facing down and towards the wall (Fig. 4). 3. The discharge must not be above a window, entrance or other public access. Consideration must be given to the possibility that boiling water/steam could discharge from the pipe. The relief valve must never be used to drain the system 4. A remote relief valve kit is available to enable the boiler to be installed in cellars or similar locations below outside ground level. 5. A boiler discharge pump is available which will dispose of both condensate & high temperature water from the relief valve. It has a maximum head of 5 metres. Section 6.2.1 gives details of how to connect the pipe to the boiler. Pressure Relief Valve Discharge Pipe Control Box removed for clarity The end of the pipe should terminate facing down and towards the wall Fig. 4 Fig.5

Страница 27 PDF

Страница 28

28 EcoBlue System 7219708 - 03 (03/17) 5 Before Installation 5.3 Choice of the Location 5.3.1 Location of the Appliance 1. The boiler may be fitted to any suitable wall with the flue passing through an outside wall or roof and discharging to atmosphere in a position permitting satisfactory removal of combustion products and providing an adequate air supply. The boiler should be fitted within the building unless otherwise protected by a suitable enclosure i.e. garage or outhouse. (The boiler may be fitted inside a cupboard-see Section 5.3.4). 2. Where the boiler is sited in an unheated enclosure and during periods when the heating system is to be unused it is recommended that the permanent live is left on to give BOILER frost protection. NOTE: THIS WILL NOT PROTECT THE SYSTEM ! 3. If the boiler is fitted in a room containing a bath or shower reference must be made to the relevant requirements. In GB this is the current I.E.E. Wiring Regulations and Building Regulations. In IE reference should be made to the current edition of I.S. 813 “Domestic Gas Installations” and the current ETCI rules. 4. If the boiler is to be fitted into a building of timber frame construction then reference must be made to the current edition of Institute of Gas Engineers Publication IGE/UP/7 (Gas Installations in Timber Framed Housing). 5.3.2 Data Plate 1. The boiler data badge gives details of the model, serial number and Gas Council number and is situated on the boiler lower panel. It is visible when the control box is lowered (Fig. 6). 5.3.3 Bath & Shower Rooms As an integral timer is NOT FITTED the boiler has a protection rating of IPX5D and if installed in a room containing a bath or shower can be within Zone 2 (but not 0 or 1). Figs. A & B shows zone dimensions for a bathtub. For other examples refer to the Current I.E.E. Wiring Regulations). Reference must be made to the relevant requirements. In GB this is the current I.E.E. Wiring Regulations and Building Regulations. In IE reference should be made to the current edition of I.S. 813 “Domestic Gas Installations” and the current ETCI rules. 5.3.4 Ventilation 1. Where the appliance is installed in a cupboard or compartment, no air vents are required. BS 5440: Part 2 refers to room sealed appliances installed in compartments. The appliance will run sufficiently cool without ventilation. Zone 2 Zone 1 Zone 0 Zone 2 Zone 2 Window Recess Window Recess 0.6 m Ceiling Outside Zones Zone 2 Zone 1 Zone 0 2.25 m Window Recess Zone 2 0.6 m Fig. A Fig. B In GB Only In GB Only Fig. 6 Data Badge

Страница 28 PDF

Страница 29

7219708 - 03 (03/17) EcoBlue System 29 Before Installation 5 5.3.5 Condensate Drain FAILURE TO INSTALL THE CONDENSATE DISCHARGE PIPEWORK CORRECTLY WILL AFFECT THE RELIABLE OPERATION OF THE BOILER. CAREFUL CONSIDERATION MUST BE GIVEN TO THE POSSIBILITY OF THE PIPEWORK BEING SUBJECT TO FREEZING CONDITIONS AND APPROPRIATE MEASURES TAKEN TO PREVENT BLOCKAGE. CORRECT INSTALLATION IN ACCORDANCE WITH THIS SECTION WILL CONSIDERABLY MINIMISE THE LIKELIHOOD OF BLOCKAGE AND SUBSEQUENT BOILER LOCK-OUT. A CONDENSATE DISCHARGE PUMP AND PIPE ‘TRACE HEATING’ ARE AVAILABLE AS ACCESSORIES - see paragraphs 5.3.6.12 to 5.3.6.15 for further details. The condensate discharge pipe MUST NOT RISE at any point along its length. There MUST be a fall of AT LEAST 2.5° (50mm per metre) along the entire run EXCEPT when employing a suitable condensate pump in basement and cellar or similar applications. The boiler condensate trap incorporates a seal of 75mm, therefore it is unnecessary to install an air break and trap in the discharge pipework. 1. The condensate outlet will accept 21.5mm (3/4in) plastic overflow pipe. It is strongly recommended that this discharges internally into the household drainage system. Where this is not possible, discharge into an outside drain is permissible providing every possible precaution is taken to prevent freezing. 2. Ensure the discharge of condensate complies with any national or local regulations in force. BS 6798 & Part H1 of the Building Regulations give further detailed guidance. 3. The discharge pipe should be run in a proprietary drain pipe material e.g. PVC, PVC-U, ABS, PVC-C or PP. 4. Metal pipework is NOT suitable for use in condensate discharge systems. 5. The pipe should be a minimum of 21.5mm diameter and must be supported using suitably spaced clips of the correct design to prevent sagging. 6. It is advisable that the full length of condensate pipe is run internally and preferably be less than 3 metres. 7. Internal runs greater than 3 metres or runs in cold areas should use 32mm waste pipe. 8. External runs MUST be a MINIMUM of 32mm and fully insulated with material suitable for external use. Examples are shown of the following methods of termination:- i) to an internal soil & vent pipe ii) via an internal discharge branch (e.g. sink waste) downstream of the trap iii) to a drain or gully iv) to a purpose made soakaway v) pumped into an internal discharge branch (e.g. sink waste) downstream of the trap vi) pumped into an external soil & vent pipe vii) to a drain or gully with extended external run & trace heating It is strongly recommended to discharge internally into the household drainage system. If connecting to a rain water drain, that drain MUST discharge into a foul drain. 21.5mm 32mm Insulation 2.5° Minimum fall i) Termination to an internal soil and vent pipe 450mm min* 50mm per metre of pipe run *450mm is applicable to properties up to 3 storeys. For multi-storey building installations consult BS 6798. Boiler 2.5° Minimum fall ii) External termination via internal discharge branch e.g sink waste - downstream* Sink Pipe must terminate above water level but below surrounding surface. Cut end at 45° 50mm per metre of pipe run *It is NOT RECOMMENDED to connect upstream of the sink or other waste water receptacle ! Key to Pipework

Страница 29 PDF

Страница 30

30 EcoBlue System 7219708 - 03 (03/17) 5 Before Installation 9. If the boiler is fitted in an unheated location the entire condensate discharge pipe should be treated as an external run and sized and insulated accordingly. 10. In all cases discharge pipe must be installed to aid disposal of the condensate. To reduce the risk of condensate being trapped, as few bends and fittings as possible should be used and any burrs on cut pipe removed. 11. When discharging condensate into a soil stack or waste pipe the effects of existing plumbing must be considered. If soil pipes or waste pipes are subjected to internal pressure fluctuations when WC's are flushed or sinks emptied then back- pressure may force water out of the boiler trap and cause appliance lockout. 12. A boiler discharge pump is available which will dispose of both condensate & high temperature water from the relief valve. It has a maximum head of 5 metres. Follow the instructions supplied with the pump. 13. Condensate Drain Pipe ‘Trace Heating’ Elements are available in various lengths, 1, 2, 3 & 5 metres. Where the drain is between 3 & 5 metres a 5 metre kit can be used and “doubled back” upon itself. 14. It is possible to fit the element externally on the condensate drain or internally as detailed in the instructions provided. 15. The fitting of a ‘Trace Heating’ Element is NOT a substitute for correct installation of the condensate drain. ALL requirements in this section must still be adhered to. Boiler 2.5° Minimum fall iii) Termination to a drain or gully Boiler 500mm min 2.5° Minimum fall iv) Termination to a purpose made soakaway Holes in the soak-away must face away from the building 50mm per metre of pipe run 50mm per metre of pipe run Further specific requirements for soakaway design are referred to in BS 6798. Pipe must terminate above water level but below surrounding surface. Cut end at 45° Boiler v) pumped into an internal discharge branch (e.g. sink waste) downstream of the trap Pipe must terminate above water level but below surrounding surface. Cut end at 45° 2.5° Minimum fall 50mm per metre of pipe run Condensate Pump Sink Basement or similar (heated) Boiler vi) pumped into an external soil & vent pipe 2.5° Minimum fall 50mm per metre of pipe run Condensate Pump Unheated Location (e.g. Garage) Basement or similar (heated) Boiler 2.5° Minimum fall 50mm per metre of pipe run Pipe must terminate above water level but below surrounding surface. Cut end at 45° The ‘Trace Heating’ element must be installed in accordance with the instructions supplied. External runs & those in unheated locations still require insulation. vii) to a drain or gully with extended external run & trace heating

Страница 30 PDF

Страница 31

7219708 - 03 (03/17) EcoBlue System 31 Before Installation 5 5.3.6 Clearances 1. A flat vertical area is required for the installation of the boiler. 2. These dimensions include the necessary clearances around the boiler for case removal, spanner access and air movement. Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler. *This is MINIMUM recommended dimension. Greater clearance will aid installation and maintenance. 150mm* Min 700mm 390mm 175 mm Min (300mm Min if using 80/125mm flueing system) 5mm Min 5mm Min 450mm Min For Servicing Purposes & Operating the Controls In Operation 5mm Min At least 1.5° 295mm Fig.7 *This is MINIMUM recommended dimension. Greater clearance will aid installation and maintenance. See Section 14.1 ‘32 Model Supplement’ for dimensions specific to the 32 model

Страница 31 PDF

Страница 32

32 EcoBlue System 7219708 - 03 (03/17) 5 Before Installation 5.3.7 Flue/Chimney Location 1. The following guidelines indicate the general requirements for siting balanced flue terminals. For GB recommendations are given in BS 5440 Pt 1. For IE recommendations are given in the current edition of I.S. 813 “Domestic Gas Installations”. Due to the nature of the boiler a plume of water vapour will be discharged from the flue. This should be taken into account when siting the flue terminal. Terminal Position with Minimum Distance (Fig. 8) (mm) A1 Directly below an opening, air brick, opening windows, etc. 300 B1 Above an opening, air brick, opening window etc. 300 C1 Horizontally to an opening, air brick, opening window etc. 300 D2 Below gutters, soil pipes or drain pipes. 25 (75) E2 Below eaves. 25 (200) F2 Below balconies or car port roof. 25 (200) G2 From a vertical drain pipe or soil pipe. 25 (150) H2 From an internal or external corner. 25 (300) I Above ground, roof or balcony level. 300 J From a surface or boundary line facing a terminal. 600 K From a terminal facing a terminal (Horizontal flue). 1200 From a terminal facing a terminal (Vertical flue). 600 L From an opening in carport (e.g. door, window) into the dwelling. 1200 M Vertically from a terminal on the same wall. 1500 N Horizontally from a terminal on the same wall. 300 R From adjacent wall to flue (vertical only). 300 S From an adjacent opening window (vertical only). 1000 T Adjacent to windows or openings on pitched and flat roofs 600 U Below windows or openings on pitched roofs 2000 1 In addition, the terminal should be no nearer than 150 mm to an opening in the building fabric formed for the purpose of accommodating a built-in element such as a window frame. 2 Only ONE 25mm clearance is allowed per installation. If one of the dimensions D, E, F, G or H is 25mm then the remainder MUST be as shown in brackets, in accordance with B.S.5440-1. N I I G F M I A A F H J,K D E H Likely flue positions requiring a flue terminal guard C R A I J,K I L S B T U Fig. 8

Страница 32 PDF

Страница 33

7219708 - 03 (03/17) EcoBlue System 33 Before Installation 5 Under car ports we recommend the use of the plume displacement kit. The terminal position must ensure the safe and nuisance - free dispersal of combustion products. 2. If the terminal discharges onto a pathway or passageway, check that combustion products will not cause a nuisance and that the terminal will not obstruct the passageway. 3. If a terminal is less than 2 metres above a balcony, above ground or above a flat roof to which people have access, then a suitable terminal guard must be provided. *4. Reduction to the boundary is possible down to 25mm but the flue deflector must be used (see 5.3.12). The distance from a fanned draught appliance terminal installed parallel to a boundary may not be less than 300mm in accordance with the diagram opposite (Fig. 9). Fig. 9 300 min Terminal Assembly Top View Rear Flue Property Boundary Line Opening Window or Door 150mm MIN. If fitting a Plume Displacement Flue Kit, the air inlet must be a minimum of 150mm from any opening windows or doors (see Fig. 10). Plume Displacement Kit Air Inlet Fig. 10 * The Plume Displacement flue gas discharge terminal and air inlet must always terminate in the same pressure zone i.e. on the same facing wall.

Страница 33 PDF

Страница 34

34 EcoBlue System 7219708 - 03 (03/17) 5 Before Installation 5.3.8 Horizontal Flue/Chimney Systems 1. The standard telescopic flue is suitable only for horizontal termination applications. 2. All fittings should be fully engaged. The approximate engagement is 40mm. Apply the lubricant supplied to the seal on each fitting to aid assembly. 3. Maximum permissible equivalent flue lengths are:- (60/100) (80/125) Horizontal Concentric 10 metres 20 metres 4. Any additional “in line” bends in the flue system must be taken into consideration. Their equivalent lengths are:- Concentric Pipes: 135° bend 0.5 metres 93° bend 1.0 metres Flue length is measured from point (i) to (ii) as shown. The elbow supplied with the standard horizontal telescopic flue kit is not included in any equivalent length calculations. Read this section in conjunction with the Flue Installation Guide supplied with the boiler. WARNING SUPPORT - All flue systems MUST be securely supported at a MINIMUM of once every metre & every change of direction. It is recommended that every straight piece is supported irrespective of length. Additional supports are available as accessories. VOIDS - Consideration must be given to flue systems in voids and the provision of adequate access for subsequent periodic visual inspection. Horizontal Flues (ii) (i) Plume Displacement Kit 60 /100 dia 1M Extensions 45° & 93° elbows are also available - see the separate Flue Guide. NOTE: Horizontal flue pipes should always be installed with a fall of at least 1.5° from the terminal to allow condensate to run back to the boiler. (ii) (i) This bend is equivalent to 1 metre Total equivalent length = A+B+C+2 x 90° Bends B A C This bend is equivalent to 1 metre

Страница 34 PDF

Страница 35

7219708 - 03 (03/17) EcoBlue System 35 Before Installation 5 5.3.9 Flue/Chimney Lengths 1. The standard horizontal telescopic flue kit allows for lengths between 315mm and 500mm from elbow to terminal without the need for cutting (Fig. 11). Extensions of 250mm, 500mm & 1m are available. The maximum permissible equivalent flue length is: 10 metres (60/100 system - vertical & horizontal) 20 metres (80/125 system - vertical & horizontal) 15 metres (80/80 twin pipe) 8 metres (60/100 system - vertical connected to ridge terminal) 5.3.10 Flue/Chimney Trim 1. The flexible flue trims supplied can be fitted on the outer and inner faces of the wall of installation. 5.3.11 Terminal Guard 1. When codes of practice dictate the use of terminal guards (Fig. 12) ‘Multifit’ accessory part no. 720627901 can be used (NOTE: This is not compatible with Flue Deflector referred to below). 2. There must be a clearance of at least 50mm between any part of the terminal and the guard. 3. When ordering a terminal guard, quote the appliance name and model number. 4. The flue terminal guard should be positioned centrally over the terminal and fixed as illustrated. 5.3.12 Flue/Chimney Deflector 1. Push the flue deflector over the terminal end. It may point upwards as shown, or up to 45° either way from vertical. Secure the deflector to the terminal with screws provided (Fig. 13). 5.3.13 Flue/Chimney Accessories For full details of Flue Accessories (elbows, extensions, clamps etc.) refer to the Flue Accessories & Fitting Guide supplied in the literature pack. 315mm 500mm Flue Deflector Fig. 11 Fig. 12 Fig. 13 © Baxi Heating UK Ltd 2011 G U I D A N C E N OT E S Flue Accessories & Fitting Guide Ø 60/100 Flue Systems Ø 80/125 Flue Systems Ø 80/80 Twin Flue Systems Plume Displacement Kit (Ø 60/100 Flue Systems) READ THESE INSTRUCTIONS IN CONJUNCTION WITH THE BOILER INSTALLATION INSTRUCTIONS BEFORE FITTING THE FLUE Please leave these instructions with the Installation & Servicing Instructions. IMPORTANT NOTE: This document will assist in the correct installation of the various flue & chimney systems described within. However, it is the responsibility of the installer/Gas Safe registered commissioning engineer to ensure that the flue & chimney system is fitted safely and in compliance with the relevant standards and practices in force in the country of installation. 5.4 Transport 1. This product should be lifted and handled by two people. When lifting always keep your back straight and wear protective equipment where necessary. Carrying and lifting equipment should be used as required. e.g. when install in a loft. Ensure that no part of the white outer chimney duct is visible

Страница 35 PDF

Страница 36

36 EcoBlue System 7219708 - 03 (03/17) 5 Before Installation 5.5 Unpacking & Initial Preparation 5.5.1 Unpacking RISK ASSESSMENT - Before commencing the installation it is recommended that the ‘Five Steps to Risk Assessment’ document published by the HSE is consulted, and an assessment performed as described. GAS SUPPLY - The gas supply, gas type and pressure must be checked for suitability before connection. 1. See ‘Section 2.3.1 Handling’ before unpacking or lifting the boiler. 2. Follow the procedure on the carton to unpack the boiler or see Fig. 14a. 3. If pre-plumbing (Fig. 14) - the wall jig and fitting kit can be removed without removing the carton sleeve. Simply slide banding to the edge and open the perforated flap, lift out the jig, fitting kit and instructions. If the boiler is to be install at a later date, close the flap and reposition the banding straps, the boiler can now be store safely away. A small amount of water may drain from the boiler in the upright position. 5.5.2 Initial Preparation 1. After considering the location position the fixing template on the wall ensuring it is level both horizontally and vertically. 2. Mark the position of the fixing slots for the wall jig indicated on the template. 3. Mark the position of the centre of the flue hole (rear exit). For side flue exit, mark as shown (Fig. 15). 4. If required, mark the position of the gas and water pipes. Remove the template (Fig. 17). 5. Cut the hole for the flue (minimum diameter 116mm). 6. Drill the wall as previously marked to accept the wall plugs supplied. Secure the wall jig using the fixing screws. 7. Using a spirit level ensure that the wall jig is level before finally tightening the screws (Fig. 16). 8. Connect the gas and water pipes to the valves on the wall jig using the copper tails supplied. Ensure that the sealing washers are fitted between the connections. Fit a suitable filling loop as described in the instructions supplied with it. Pressure Relief Valve (15mm) Condensate Drain Part No. 7212143 DRAFT A 5 mm Minimum Side Clearance 5 mm Minimum Side Clearance 116mm Dia Minimum Aperture For Flue Tube Side Flue Centre Line Vertical Flue Centre Line 175 mm Minimum Clearance Profile of Outercase 228 mm 150 mm Minimum Clearance Boiler Wall Mounting Plate Fixing Slots 38.5mm 26.5 mm 65 mm 65 mm 65 mm 65 mm 65 mm Ø 8 mm 50 mm 162.5 mm (PRV) Hot Water Outlet (15mm) Combi Only Not System Cold Water Inlet (15mm) Heating Return (22mm) Heating Flow (22mm) Gas Inlet (22mm) Combi Only Not System Part No. 7212143 200 mm Recommended Wall Template 130mm (140mm on 32 model) For Side Flue Exit Fig. 15 Fig.16 Heating Flow 3/4” BSP Connections Fig. 17 Fig. 14a SNAP OFF LIFT HERE BOTH SIDES To remove only the Wall jig slide banding to the edge and open flaps. Slide the wall jig out of carton then close the flaps. Slide banding back on. Pre-plumbing Fig. 14

Страница 36 PDF

Страница 37

7219708 - 03 (03/17) EcoBlue System 37 Before Installation 5 5.6 Connecting Diagrams 5.6.1 System Filling and Pressurising 1. A filling point connection on the central heating return pipework must be provided to facilitate initial filling and pressurising and also any subsequent water loss replacement/refilling. 2. The filling method adopted must be in accordance with all relevant water supply regulations and use approved equipment. 3. Your attention is drawn to: for GB: Guidance G24.2 and recommendation R24.2 of the Water Regulations Guide. for IE: the current edition of I.S. 813 “Domestic Gas Installations”. 4. The sealed primary circuits may be filled or replenished by means of a temporary connection between the circuit and a supply pipe, provided a ‘Listed’ double check valve or some other no less effective backflow prevention device is permanently connected at the inlet to the circuit and the temporary connection is removed after use. Fig. 18 Stop Valve Double Check Valve Cold Mains Inlet CH Return Temporary Loop Stop Valve 5.5.3 Flushing 1. Flush thoroughly and treat the system according to guidance given in B.S. 7593.

Страница 37 PDF

Страница 38

38 EcoBlue System 7219708 - 03 (03/17) 6 Installation 6 Installation 6.1 General 1. Remove the sealing caps from the boiler connections under the bolier (including the condensate trap) before lifting into position. A small amount of water may drain from the boiler once the caps are removed. For ease of installation connect and tighten the copper tails to the valves on the wall jig BEFORE fitting the boiler ! 2. Lift the boiler as indicated by the shaded areas. The boiler should be lifted by TWO PEOPLE. Engage the mounting bracket at the top rear of the boiler into the retaining lugs on the wall jig using the aligning lugs for position (Fig.21) (see ‘Handling’ section 2.3.1). 3. Insert the sealing washers between the valves and pipes on the wall jig and the boiler connections. 4. Tighten all the connections. 6.2 Assembly 6.2.1 Fitting the Pressure Relief Discharge Pipe 1. Remove the discharge pipe from the kit. 2. Determine the routing of the discharge pipe in the vicinity of the boiler. Make up as much of the pipework as is practical, including the discharge pipe supplied. Note the intended position of the pipe is adjacent to the gas inlet pipe - see Section 3.2 Make all soldered joints before connecting to the pressure relief valve. Do not adjust the position of the valve. The discharge pipe must be installed before pressurising the system. 3. The pipework must be at least 15mm diameter and run continuously downwards to a discharge point outside the building. See section 5.2.9 for further details. 4. Utilising one of the sealing washers, connect the discharge pipe to the adaptor and tighten the nut hand tight, plus 1/4 turn to seal. 5. Complete the discharge pipework and route it to the outside discharge point. Fig. 21 Remove Sealing Caps from under the Boiler before lifting into position Sealing Washers (x 3) Engage the Boiler Mounting Bracket on the Boiler into the Retaining Lugs using the Aligning Lugs for position Fig. 22 Pressure Relief Valve Discharge Pipe Front Panel and Control Box removed for clarity Lift Here Both Sides Retaining Lugs When the Boiler Mounting Bracket on the Boiler is in position on the Retaining Lugs, the bottom polystyrene may be discarded allowing the boiler to swing into position Bottom Polystyrene Aligning Lugs

Страница 38 PDF

Страница 39

7219708 - 03 (03/17) EcoBlue System 39 Installation 6 6.2.2 Connecting the Condensate Drain 1. Remove the blanking cap, and using the elbow supplied, connect the condensate drain pipework to the boiler condensate trap outlet pipe. Ensure the discharge of condensate complies with any national or local regulations in force (see British Gas “Guidance Notes for the Installation of Domestic Gas Condensing Boilers” & HHIC recommendations). 2. The elbow will accept 21.5mm (3/4in) plastic overflow pipe which should generally discharge internally into the household drainage system. If this is not possible, discharge into an outside drain is acceptable. See section 5.3.5 for further details. 3. The boiler condensate trap should be primed by pouring approximately 300ml of water into the flue spigot. Do not allow any water to fall into the air inlet. 6.3 Preparation 6.3.1 Panel Removal 1. Remove the securing screws from the bottom of the case front panel. 2. Lift the panel slightly to disengage it from the locating lugs on top of the case and remove it. EV1 EV1 EV2 EV2 P. OUT P. OUT 1 2 3 4 1 2 3 4 VENT VENT RQ RQ ADJ. ADJ. Condensate Trap Connection (elbow supplied) Fig. 23 Case Front Panel Case Front Panel Securing Screws Prime Trap by pouring 300ml of water into flue spigot Locating Lug Front Panel and Control Box removed for clarity

Страница 39 PDF

Страница 40

40 EcoBlue System 7219708 - 03 (03/17) 6 Installation 6.4 Air Supply / Flue Gas Connections 6.4.1 Connecting the Flue/Chimney HORIZONTAL TELESCOPIC FLUE (concentric 60/100) 1. There are two telescopic sections, the terminal assembly and the connection assembly, a roll of sealing tape and two self tapping screws. A 93° elbow is also supplied. 2. The two sections can be adjusted to provide a length between 315mm and 500mm (Fig. 24) when measured from the flue elbow (there is 40mm engagement into the elbow). 3. Locate the flue elbow on the adaptor at the top of the boiler. Set the elbow to the required orientation (Fig. 25). The flue elbow is angled at 93 degrees to ensure a fall back to the boiler. 4. Measure the distance from the outside wall face to the elbow. This dimension will be known as ‘X’ (Fig. 25). 5. If the distance from the flue elbow to the outside face of the wall (‘X’ in Fig. 25) is less than 250mm the connection assembly can be discarded and the terminal assembly fitted directly into the elbow. 6. In instances where the dimension ‘X’ (Fig. 25) is between 250mm and 315mm it will be necessary to shorten the terminal assembly by careful cutting to accommodate walls of these thicknesses. 7. To dimension ‘X’ add 40mm. This dimension to be known as ‘Y’. 8. Adjust the two telescopic sections to dimension ‘Y’ and seal the joint with the tape provided (Fig. 27). Ensure that the labels marked ‘TOP’ on the terminal and connection assemblies are uppermost. 9. Using the clearance holes in the connection assembly secure it to the terminal assembly using the screws supplied with the telescopic flue (Fig. 28). Wall Thickness (X) Wall Thickness (X) Fig. 24 315mm 500mm Terminal Assembly Connection Assembly Fig. 25 Fig. 27 Dimension ‘Y’ Securing Screw Fig. 28 Sealing Tape ‘TOP’ Label ‘TOP’ Label ‘Peak’ to be uppermost

Страница 40 PDF

Страница 41

7219708 - 03 (03/17) EcoBlue System 41 Installation 6 10. Remove the flue elbow and insert the flue through the hole in the wall. Fit the flue trims if required, and refit the elbow to the boiler adaptor, ensuring that it is pushed fully in. Secure the elbow with the screws supplied in the boiler fitting kit (Fig. 29). 11. Draw the flue back through the wall and engage it in the elbow. It may be necessary to lubricate to ease assembly of the elbow and flue (Fig. 30). 12. Ensure that the terminal is positioned with the slots to the bottom (Fig. 31). Secure to the elbow with the screws supplied with the telescopic flue (Fig. 30). It is essential that the flue terminal is fitted as shown to ensure correct boiler operation and prevent water entering the flue. 13. Make good between the wall and air duct outside the building, appropriate to the wall construction and fire rating. 14. If necessary fit a terminal guard (see Section 5.3.11). There must be no part of the air duct (white tube) visible outside the property. Slots at bottom Fig. 30 Fig. 31 Adaptor Apply the lubricant supplied for ease of assembly (do not use any other type). Ensure elbow is fully engaged into boiler adaptor Fig. 29 Boiler Elbow Apply the lubricant supplied for ease of assembly (do not use any other type). Ensure Flue is fully engaged into Elbow

Страница 41 PDF

Страница 42

42 EcoBlue System 7219708 - 03 (03/17) 6 Installation 6.5 Electrical Connections 6.5.1 Electrical Connections of the appliance The boiler must be connected to the mains fused 3A 230V 50HZ supply & control system using cable of 3 core 0.75mm 3183Y multi strand flexible type (see IMPORTANT note opposite). 1. See Section 5.2.2. for details of the electrical supply. Undo the securing screws and lift the case front panel off. 2. Hinge the control box downwards. Disengage the securing tabs and open the terminal block cover. 3. If the mains cable fitted is not long enough slacken the gland nut in the right of the boiler lower panel and pass the new mains cable through it. Remove the grommet adjacent to the gland nut, pierce the diaphragm and insert the cable from the external control system. 4. Leave sufficient slack in the cables to allow the control box to be hinged fully open. Tighten the gland nut and refit the grommet and gland nut. 5. Connect the Earth, Permanent Live and Neutral wires to the terminal strip. Both the Permanent Live and Neutral connections are fused. 6. Refer to the instructions supplied with the external control(s). Any thermostat must be suitable for 230V switching. 7. Remove the link between connections 1 & 2. The 230V supply at connection 2 must be connected to the thermostat. The switched output from the thermostat must be connected to connection 1. (Figs. 35 & 36). 8. Replace the terminal block cover. The 230V switched signal for external controls (Frost Stat - Room Stat - Timer) must always be taken from terminal 2 at the boiler. Live, Neutral and Earth to power these controls must be taken from the Fused Spur. For the Frost Stat to operate the boiler MUST BE IN CENTRAL HEATING MODE i.e. symbol shown. 9. Engage the front panel onto the locating lugs on top of the case & secure with the securing screws at the bottom of the case. 6.5.2 Connecting External Devices 1. See Section 6.7.2 for details of fitting the optional outdoor sensor accessory. Always fit fast blow 2A fuse Fused supply 3A 230V ~ 50Hz Neutral (blue) Earth (green/yellow) Live (brown) 1 2 230V br b g/y b bk Fig. 35 Case Front Panel Case Front Panel Securing Screws Locating Lug Terminal M1 230V Terminal Block Fuses Terminal M1 230V 6.6 Filling the Installation 1. See Section 5.2.6 and 5.6.1 for details of flushing and filling the installation. IMPORTANT • Any wiring to the boiler, from either the mains or an external control, MUST be cable of the following specification:- 0.75mm 3183/4/5Y (depending on installation) multi strand flexible cable conforming to BS 50525-2-11. • Cable of the above specification is sufficiently flexible to withstand normal regular opening and closing of the facia/control box as expected during routine servicing and other maintenance work. • Use ONLY cable glands supplied with the boiler, or provided as spares by the manufacturer. • Under no circumstances must solid core cable be used as it is not intended for applications where movement may occur. The use of solid core cable could result in situations potentially hazardous to health. • These points must be considered when initially wiring the boiler to the installation, and if replacing any wiring during the service life of the boiler.

Страница 42 PDF

Страница 43

7219708 - 03 (03/17) EcoBlue System 43 Installation 6 N S W E X X North West 1/2 H 2.5m Min H 4 5 9 10 From Relay Box 1 2 3 4 5 6 7 8 9 10 Installation 6.7.1 Installation of External Sensors 1. Various Sensors are available. 6.7.2 Optional Outdoor Sensor 7214286 Full instructions are provided with the Outdoor Sensor Kit ! Positioning the Sensor 1. The sensor must be fixed to an external wall surface of the property it is serving. The wall must face north or west. DO NOT position it on a south facing wall in direct sunlight ! 2. The sensor should be approximately half the height of the living space of the property, and a minimum of 2.5m above ground level. 3. It must be positioned away from any sources of heat or cooling (e.g. flue terminal) to ensure accurate operation. Siting the sensor above doors and windows, adjacent to vents and close to eaves should be avoided. Connecting the Sensor 1. Ensure the electrical supply to the boiler is isolated. Undo the securing screws and lift the case front panel off. 2. Hinge the control box downwards. Disengage the securing tabs and open the terminal block cover. 3. Remove one of the grommets in the boiler lower panel, pierce the diaphragm and insert the wires from the outdoor sensor. 4. Leave sufficient slack in the wires to allow the control box to be hinged fully open. Refit the grommet. 5. Connect the wires from the outdoor sensor to positions 4 & 5 and wires from the relay box to 9 &10 on M2 as shown. Refit the cover. The relay box provided MUST be fitted to ensure correct operation of domestic hot water ! Setting the Sensor Curve 1. With the outdoor sensor fitted, the boiler central heating flow temperature is adjusted automatically to accommodate the change in heat required to optimise the efficient performance of the boiler whilst maintaining a comfortable room temperature. The central heating buttons on the boiler adjust a “simulated room temperature” used for this optimisation. 2. This functionality requires the setting of three parameters on the boiler, to suit the heating system and the optimisation can be adjusted by the user with the central heating control buttons on the boiler control panel. Full instructions are provided with the Outdoor Sensor Kit ! Continue with the installation and commissioning of the boiler as described in this manual. 6.7 External Controls 6.7 External Controls M2 Low Voltage Terminal Block

Страница 43 PDF

Страница 44

44 EcoBlue System 7219708 - 03 (03/17) 7 Commissioning 7 Commissioning 7.1 General 1. Reference should be made to BS:EN 12828, 12831 & 14336 when commissioning the boiler. Ensure that the condensate drain trap has been primed - see Section 6.2.2. paragraph 3. 2. At the time of commissioning, complete all relevant sections of the Benchmark Checklist at the rear of this publication. 3. Ensure that the filling loop is connected and open, then open the heating flow and return valves on the boiler. Ensure that the cap on the automatic air vent on the pump body is opened (Fig. 37). 4. The system must be flushed in accordance with BS 7593 (see Section 5.2.6) and the flushing agent manufacturers instructions. 5. Pressurise the system to 1.5 bar (Fig. 38) then close and disconnect the filling loop. 6. Test for gas tightness, turn the gas supply on and purge according to in GB BS 6891 and in IE I.S. 813 "Domestic Gas Installations". Automatic Air Vent Cap Fig. 37 Pump bar 0 1 2 3 4 Control Box removed for clarity Fig. 38 Heating Pressure Gauge 7.2 Checklist before Commissioning 7.2.1 Preliminary Electrical Checks 1. Prior to commissioning the boiler preliminary electrical system checks should be carried out. 2. These should be performed using a suitable meter, and include checks for Earth Continuity, Resistance to Earth, Short Circuit and Polarity. 7.2.2 Checks 1. Checked: That the boiler has been installed in accordance with these instructions. The integrity of the flue system and the flue seals. The integrity of the boiler combustion circuit and the relevant seals. /R /P + + R EcoBlue Digital pressure reading which can be accessed by via the button and scrolling to setting ‘5’. Note there may be a slight difference between the digital & gauge reading depending on boiler operating mode.

Страница 44 PDF

Страница 45

7219708 - 03 (03/17) EcoBlue System 45 Commissioning 7 7.3 Commissioning Procedure 7.3.1 De-Aeration Function The display backlight remains lit approx. 10 minutes. If the backlight goes out during commissioning it does not mean that the process has been completed. This procedure MUST be carried out ! 1. Ensure the gas is turned Off! Turn the power to the boiler ON. The software version will be displayed, followed by , then •• flashing briefly before displaying the ‘Standby’ symbol . 2. Press & together and hold for at least 6 seconds until is briefly displayed followed by . 3. The De-Aeration Function is now activated. The boiler pump will run for approx. 10 minutes. During this time the pump will alternate on and off and the diverter valve will switch between heating & hot water to purge air from the system. 4. At the end of the process the boiler will return to the ‘Standby’ position. /R /P + + R EcoBlue Fig. 39 • If the De-aeration is interrupted due to a fault the pump will cease to circulate but the function timer (approx.10 minutes) will continue to run. For this reason it is recommended to monitor the boiler display during De-aeration. If the fault cannot be rectified quickly the function must be restarted to ensure complete De-aeration. • In the event of a loss of power the De-aeration function needs to be restarted once the power is re-established. • In the event of low water pressure the fault code E118 will be displayed, along with the flashing and symbols. This error can be rectified by repressurising the system to at least 1.0 bar. The pump will restart automatically once the water pressure is successfully re-established and will reappear in the display. • The De-aeration function can be repeated as necessary until all air is expelled from the system. 7.4 Gas Settings 7.4.1 Checking Combustion - ‘Chimney Sweep’ Mode The case front panel must be fitted when checking combustion. Ensure the system is cold & the gas supply turned on & purged. The person carrying out a combustion measurement should have been assessed as competent in the use of a flue gas analyser and the interpretation of the results. See Section 10.1.3. Important: Allow the combustion to stabilise before inserting the Combustion Analyser Probe into the Test Point. This will prevent saturation of the analyser. 1. Press & together and hold for at least 6 seconds. is displayed briefly followed by and the current setting point (eg. , or ) flashing alternately. Important: There may be a delay before the boiler fires. 2. To adjust the boiler input setting, press or button and the current setting point will flash (eg. , or ). Press the or button again to alter the boiler input setting. = MAX. HEATING input, = MAX. DHW input, = MIN. input 4. The combustion (CO level & CO/CO2 ratio) must be measured and recorded at MAXIMUM DHW input & MINIMUM input. 5. Follow the flow chart on the next page to comply with the requirement to check combustion on commissioning. The system MUST be cold to ensure the boiler is operating under full demand. To obtain an accurate measurement on smaller capacity systems it may be necessary to open one or more hot taps and remove the diverter valve motor in order to maintain the boiler output. 6. Press & again for at least 6 seconds to exit. 7. Press the once to bring the boiler out of ‘Standby’ mode. 8. Use the button to toggle through the CH and DHW settings to activate the required modes. Plug Analyser Probe Flue Sampling Point R These buttons for De-Aeration /R /P + + R EcoBlue These buttons for ‘Chimney Sweep’ FUNCTION INTERRUPTION R R After refitting the sampling point plug ensure there is no leakage of products

Страница 45 PDF

Страница 46

46 EcoBlue System 7219708 - 03 (03/17) 7 Commissioning Set Boiler to Maximum Rate (see 7.4.1) Allow the combustion to stabilise. Do not insert probe to avoid ‘flooding’ the analyser. Perform Flue Integrity Combustion Check Insert the analyser probe into the air inlet test point, allowing the reading to stabilise. Is O2  20.6% and CO2 < 0.2% ? Verify Flue Integrity Indication that products of combustion & inlet air are mixing - further investigation is required. Check all flue components are correctly assembled, fixed & supported. Check the flue & terminal are unobstructed. Is O2  20.6% and CO2 < 0.2% ? TURN APPLIANCE OFF ! Call 0344 871 1545 for advice. The appliance MUST NOT be commissioned until all problems are identified and resolved. Check CO & Combustion Ratio at Maximum Rate Whilst the boiler is still operating at maximum insert the analyser probe into the flue gas test point, allowing the reading to stabilise. Is CO < 350ppm and CO/CO2 ratio < 0.004 ? Verify Integrity of Seals Check all burner seals, internal flue seals, door & case seals. Replace any seals that appear unsound. Is CO < 350ppm and CO/CO2 ratio < 0.004 ? TURN APPLIANCE OFF ! Call 0344 871 1545 for advice. The appliance MUST NOT be commissioned until all problems are identified and resolved. If commissioning cannot be fully completed the appliance must be disconnected from the gas supply in accordance with the GSIUR. Note: Check & record the CO & combustion ratio at both maximum & minimum rates before calling 0344 871 1545. Set Boiler to Minimum Rate (see 7.4.1) Allow the combustion to stabilise. Do not insert probe to avoid ‘flooding’ the analyser. Yes No No Yes No Yes Check CO & Combustion Ratio at Minimum Rate Whilst the boiler is operating at minimum insert the analyser probe into the flue gas test point, allowing the reading to stabilise. Yes No Is CO < 350ppm and CO/CO2 ratio < 0.004 ? No Yes BOILER OPERATING SATISFACTORILY. NO FURTHER ACTION REQUIRED Ensure test points are capped, the boiler case front panel is correctly fitted & secured and all other commissioning procedures completed. Complete the ‘Benchmark’ Checklist, recording the CO & combustion ratio readings as required. 7.4.1 Checking Combustion (cont) 9. Follow the flow chart opposite.

Страница 46 PDF

Страница 47

7219708 - 03 (03/17) EcoBlue System 47 Commissioning 7 7.5 Configuring the System 7.5.1 Check the Operational (Working Gas Inlet Pressure & Gas Rate) The system MUST be cold to ensure the boiler is operating under full demand. To obtain an accurate measurement it is recommended that the heating circuit and hot water cylinder are cold and full demand applied in order to maintain the boiler output. 1. Press & together and hold for at least 6 seconds. is displayed briefly followed by & flashing alternately. ‘3’ represents MAXIMUM HEATING input. 2. Press or to adjust the input. or represents MAXIMUM input. 3. With the boiler operating in the maximum rate condition check that the operational (working) gas pressure at the inlet gas pressure test point is in accordance with B.S. 6798 & B.S. 6891. This must be AT LEAST 17mb ! 4. Ensure that this inlet pressure can be obtained with all other gas appliances in the property working. The pressure should be measured at the test point on the gas cock (Fig. 41). Measure the Gas Rate 5. With any other appliances & pilot lights turned OFF the gas rate can be measured. It should be:- 12 model 1.27 m3/h 15 model 1.58 m3/h 18 model 1.9 m3/h 24 model 2.54 m3/h 28 model 2.96 m3/h 32 model 3.38 m3/h 6. Press & together and hold for at least 6 seconds to exit the function. Gas Cock Inlet Pressure Test Point Fig. 41 Control Box removed for clarity 7.6 Final Instructions 7.6.1 Handover 1. Carefully read and complete all sections of the Benchmark Commissioning Checklist at the rear of this publication that are relevant to the boiler and installation. These details will be required in the event of any warranty work. The warranty will be invalidated if the Benchmark section is incomplete. 2. The publication must be handed to the user for safe keeping and each subsequent regular service visit recorded. 3. Hand over the User’s Operating, Installation and Servicing Instructions, giving advice on the necessity of regular servicing. 4 . For IE, it is necessary to complete a “Declaration of Conformity” to indicate compliance with I.S. 813. An example of this is given in I.S. 813 “Domestic Gas Installations”. This is in addition to the Benchmark Commissioning Checklist. EV1 EV2 P. OUT 1 2 3 4 VENT RQ ADJ. Gas Cock Gas Valve Gas Meter 19-23 mbar 17-21 mbar 18-22 mbar Fig. 41a Working Gas Pressures If the pressure drops are greater than shown in Fig. 41a (above) a problem with the pipework or connections is indicated. Permissible pressure drop across system pipework < 1 mbar.

Страница 47 PDF

Страница 48

48 EcoBlue System 7219708 - 03 (03/17) 7 Commissioning 5. Set the boiler temperature to the requirements of the user. Instruct the user in the operation of the boiler and system. 6. Instruct the user in the operation of the boiler controls. 7. Demonstrate to the user the action required if a gas leak occurs or is suspected. Show them how to turn off the gas supply at the meter control, and advise them not to operate electric light or power switched, and to ventilate the property. 8. Show the user the location of the system control isolation switch, and demonstrate its operation. 9. Advise the user that they may observe a plume of vapour from the flue terminal, and that it is part of the normal operation of the boiler. 7.6.2 System Draining 1. If at any time after installation it is necessary to drain & refill the central heating system (e.g. when replacing a radiator) the De-Aeration Function should be activated. Re-pressurise the system to 1.5 bar 2. On refilling the system ensure that there is no heating or hot water demand, but that there is power to the boiler. It is also recommended that the gas supply is turned off to prevent inadvertent ignition of the burner. 3. Press & together and hold for at least 6 seconds. The ‘De-Aeration’ Function will be activated. 4. The boiler pump will run for up to 10 minutes during which time the diverter valve will switch between heating & hot water. This will purge air from the system. The display will show . 5. Once De-Aeration is complete recommission the appliance and check that the inhibitor concentration is sufficient. See Section 7.3.1 for more detail. Information Display The button can be pressed so that the display shows the following information:- ‘00’ alternates with Sub-Code (only when fault on boiler) or ‘000’ ‘01’ alternates with CH Flow Temperature ‘02’ alternates with Outside Temperature (where Sensor fitted) ‘03’ alternates with DHW Temperature ‘04’ alternates with DHW Temperature ‘05’ alternates with System Water Pressure ‘06’ alternates with CH Return Temperature ‘07’ alternates with Flue Temperature ‘08’ - not used ‘10’ alternates with Zone 1 CH Flow Temperature ‘11’ alternates with Zone 2 CH Flow Temperature ‘12’ alternates with Ion current ‘13’ alternates with Burner working hours ‘14’ alternates with Zone 1 CH mode ‘15’ alternates with Zone 2 CH mode ‘16’ alternates with DHW circuit operating mode ‘17’ alternates with Boiler operating mode ‘18’ alternates with Solar plant operating mode ‘19’ alternates with Manufacturer information ‘20’ alternates with Manufacturer information Depending upon boiler model and any system controls connected to the appliance, not all information codes will be displayed and some that are will not have a value. Press to return to the normal display. R

Страница 48 PDF

Страница 49

7219708 - 03 (03/17) EcoBlue System 49 Operation 8 8 Operation 8.1 General 1. It is the responsibility of the installer to instruct the user in the day to day operation of the boiler and controls and to hand over the completed Benchmark Checklist at the back of this manual. 2. Set the central heating and hot water temperatures to the requirements of the user. Instruct the user in the operation of the boiler and system. 3. The temperature on the boiler must be set to a higher temperature than the cylinder thermostat to achieve the required hot water demand. 4. Instruct the user in the operation of the boiler and system controls. 5. Demonstrate to the user the action required if a gas leak occurs or is suspected. Show them how to turn off the gas supply at the meter control, and advise them not to operate electric light or power switched, and to ventilate the property. 6. Show the user the location of the system control isolation switch, and demonstrate its operation. 7. Advise the user that they may observe a plume of vapour from the flue terminal, and that it is part of the normal operation of the boiler. 8. The method of repressurising the primary system should be demonstrated. 9. If at any time after installation it is necessary to drain & refill the central heating system (e.g. when replacing a radiator) the De-Aeration Function should be activated (see 7.6.2). 8.2 To Start-up Switch on the boiler at the fused spur unit and ensure that the time control is in the on position and any other controls (e.g. room thermostat) are calling for heat. Press the once to bring the boiler out of Standby mode. The boiler will begin its start sequence. 8.3 To Shutdown Isolate the mains power supply at the fused spur unit. Isolate the gas supply at the boiler valve. R

Страница 49 PDF

Страница 50

50 EcoBlue System 7219708 - 03 (03/17) 8 Operation 8.4 Use of the Control Panel Boiler Information View Standby - Reset - Esc Boiler On mode /R /P + + R EcoBlue R Mode 1. Press button until the required mode appears:- To increase or decrease the boiler temperature 1. Press to increase the Central Heating temperature. 2. Press to decrease the Central Heating temperature. An overheat thermostat (NTC) is positioned in the heat exchanger which shuts down the appliance if the boiler temperature exceeds 100°C. Press button to re-establish normal operating conditions. Central Heating Temperature Adjustment Display Screen R R 8.5 Frost Protection 1. The boiler incorporates an integral frost protection feature that will operate in both Central Heating and Domestic Hot Water modes, and also when in standby ( displayed) see section 4.2.3 Boiler Frost Protection Mode. R Standby - Reset - Esc Button Boiler Information View Button Increase CH Temperature Button Decrease CH Temperature Button Inactive Button Inactive Button On/Off Selector Button Key to Controls When is displayed (Boiler On) the boiler will respond to timed Heating or Hot Water demand. N.B. If only is displayed the boiler will not operate ! On/Off Selector Button THESE BUTTONS INACTIVE ! except when an outdoor sensor relay kit is connected Except when an outdoor sensor relay kit is connected

Страница 50 PDF

Страница 51

7219708 - 03 (03/17) EcoBlue System 51 Settings 9 9 Settings 9.1 Parameters The operating parameters of the boiler have been factory set to suit most systems.

Страница 51 PDF

Страница 52

52 EcoBlue System 7219708 - 03 (03/17) 10 Maintenance 10 Maintenance 10.1 General Flue Sampling Point Air Sampling Point WARNING When changing components ensure that both the gas and electrical supplies to the boiler are isolated before any work is started. When the component has been changed recommission the boiler as described in Section 7. Always examine any seals or gaskets, replacing where necessary. The Case Front Panel MUST seal effectively against the boiler side panels. 1. For reasons of safety and economy, it is recommended that the boiler is serviced annually. Servicing must be performed by a competent person in accordance with B.S. 7967-4. 2. After servicing, complete the relevant Service Interval Record section of the Benchmark Commissioning Checklist at the rear of this publication. During routine servicing, and after any maintenance or change of part of the combustion circuit, the following must be checked:- • The integrity of the complete flue system and the flue seals by checking air inlet sample to eliminate the possibility of recirculation. O2  20.6% & CO2 < 0.2% • The integrity of the boiler combustion circuit and relevant seals. • The operational gas inlet pressure and the gas rate as described in Section 7.5.1. • The combustion performance as described in ‘Check the Combustion Performance’ below. 3. Competence to carry out Checking Combustion Performance B.S. 6798 ‘Specification for Installation & Maintenance of Gas Fired Boilers not exceeding 70kWh’ advises that:- • The person carrying out a combustion measurement should have been assessed as competent in the use of a flue gas analyser and the interpretation of the results. • The flue gas analyser used should be one meeting the requirements of BS7927 or BS-EN50379-3 and be calibrated in accordance with the analyser manufacturers’ requirements. • Competence can be demonstrated by satisfactory completion of the CPA1 ACS assessment, which covers the use of electronic portable combustion gas analysers in accordance with BS 7967, Parts 1 to 4. 4. Check the Combustion Performance (CO/CO2 ratio) Set the boiler to operate at maximum rate as described in Section 7.4. 5. Remove the plug from the flue sampling point, insert the analyser probe and obtain the CO/CO2 ratio. This must be less than 0.004. If the combustion reading (CO/CO2 ratio) is greater than this, and the integrity of the complete flue system and combustion circuit seals has been verified, and the inlet gas pressure and gas rate are satisfactory either:- • Perform the ‘Standard Inspection and Maintenance’ (Section 10.2) & re-check. • Perform ‘Setting the Gas Valve’ (Section 10.3.20) & re-check. • Replace and set the gas valve (Sections 10.3.19 & 20) & re-check. After refitting the sampling point plug ensure there is no leakage of products

Страница 52 PDF

Страница 53

7219708 - 03 (03/17) EcoBlue System 53 Maintenance 10 10.2 Standard Inspection and Maintenance Operation When performing any inspection or maintenance personal protective equipment must be used where appropriate. 1. Ensure that the boiler is cool and that both the gas and electrical supplies to the boiler are isolated. 2. Remove the screws securing the case front panel. Lift the panel slightly to disengage it from the tabs on top of the case (Fig. 43). Hinge down the control box. 3. To aid access disconnect the igniter plug & disconnect the two pipes from the top of the condensate trap and the drain pipe from the trap outlet. Undo the screw & washer securing the trap to the boiler lower panel. 4. Disengage the lip on the trap from the slotted bracket and remove the trap. Take care not to spill any residual condensate on the controls and P.C.B. Thoroughly rinse the trap and examine the gasket on the trap base, replacing if necessary. 5. Remove the clip securing the gas feed pipe to the air/gas venturi. Disconnect the pipe. Do not break the joint between the pipe and gas valve unless necessary. 6. Note their position and disconnect the electrode leads and the fan electrical plugs (Fig. 46). 7. Undo the four 10mm nuts retaining the combustion box cover to the heat exchanger. 8. Carefully draw the fan, collector and cover assembly forward (Fig. 46). 9. Clean any debris from the heat exchanger and check that the gaps between the coils are clear. 10. Inspect the burner, electrodes position (Fig. 45) and insulation, cleaning or replacing if necessary. Clean any dirt or dust from the boiler. 11. Carefully examine all seals, insulation & gaskets, replacing as necessary. Look for any evidence of leaks or corrosion, and if found determine & rectify the cause. 12. Prime the trap and reconnect the pipes to the top. Reassemble in reverse order. Case Front Panel Securing Screws Condensate Trap Gasket Condensate Drain Pipe Connection Control Box removed for clarity Electrode Position 7.5*±1 4 ±0.5 10 ±1 Spark Ignition Electrode Flame Sensing Electrode *NOTE: On 12 & 15 models gap is 5mm ! Fig. 46 Fan, Collector and Cover Assembly Electrode Leads Gas Feed Pipe Securing Clip Air Box Fig. 45

Страница 53 PDF

Страница 54

54 EcoBlue System 7219708 - 03 (03/17) 10 Maintenance Expansion Vessel Charge - 1.0 bar 13. To check the charge accurately ensure the system is cold. It is also necessary to relieve the pressure by draining the boiler. Using a suitable gauge check the pressure at the valve on the underside of the vessel (12 - 15 - 18 - 24 - 28 models) or on the top left of the boiler (32 model). Adjust the pressure as required and repressurise the system. A right angled valve extension will aid checking and repressurising (12 - 15 - 18 - 24 - 28 models). 17. Check the operation of the Safety Pressure Relief Valve. Simulate ‘Flame Failure’ fault by isolating the supply at gas cock and operating the boiler. 133 should be displayed. 18. Reassemble the appliance in reverse order, ensuring the front case panel is securely fitted. Recommission the boiler. 19. Complete the relevant Service Interval Record section of the Benchmark Commissioning Checklist at the rear of this publication and then hand it back to the user. Control Box removed for clarity Fig. 47 Fig. 48 10.3 Specific Maintenance Operations Changing Components See Section 10.2 paragraph 2 for removal of case panel door etc. 10.3.1 Spark Ignition & Flame Sensing Electrodes 1. Note their position and disconnect the electrode leads 2. Remove the retaining screws securing each of the electrodes to the combustion box cover and remove the electrodes, noting their orientation. 3. Check the condition of the sealing gaskets and replace if necessary. Reassemble in reverse order (Fig. 49). 4. If satisfactory combustion readings are not obtained ensure the electrode position is correct and perform the combustion check again. WARNING When changing components ensure that both the gas and electrical supplies to the boiler are isolated before any work is started. When the component has been changed recommission the boiler as described in Section 7. Always examine any seals or gaskets, replacing where necessary. The Case Front Panel MUST seal effectively against the boiler side panels. Spark Ignition Electrode Flame Sensing Electrode Electrode Leads Vessel Valve (12 - 15 - 18 - 24 - 28 models) Vessel Valve (32 models) Fig. 49 Sealing Gasket Sealing Gasket

Страница 54 PDF

Страница 55

7219708 - 03 (03/17) EcoBlue System 55 Maintenance 10 10.3.2 Fan (Figs. 50 & 51) 1. Remove the clip securing the gas feed pipe to the air/gas venturi. Disconnect the pipe. 2. Undo the screws securing the air/gas collector to the extension piece and disconnect the fan electrical plugs (Fig. 50). 3. Remove the collector and fan assembly, being careful to retain the gasket. 4. Undo the securing screw and remove the airbox, disengaging it from the fan venturi. Undo the screws securing the fan to the collector. Retain the gasket. 5. Undo the screws securing the venturi to the fan (noting its position) and transfer to the new fan, replacing the seal if necessary. Examine the gasket(s) and replace if necessary. 10.3.3 Air/Gas Venturi (Figs. 50 & 51) 1. Undo the securing screw and remove the airbox, disengaging it from the fan venturi. Remove the clip securing the gas feed pipe to the venturi. 2. Undo the screws securing the collector to the extension piece and disconnect the fan electrical plugs. 3. Remove the collector and fan assembly, being careful to retain the gasket. 4. Undo the screws securing the venturi to the fan (noting its position) and fit the new venturi, replacing the seal if necessary. Examine the gasket and replace if necessary. 5. After changing the venturi check the combustion - see Section 7.4.1. Cover Fan Fig. 50 Gasket Gas Feed Pipe Clip Venturi Seal Fan Fig. 51 Air/Gas Collector Air/Gas Venturi Control Box removed for clarity Air Box

Страница 55 PDF

Страница 56

56 EcoBlue System 7219708 - 03 (03/17) 10 Maintenance 10.3.4 Burner 1. Undo the securing screw and remove the airbox, disengaging it from the fan venturi. Remove the clip securing the gas feed pipe to the air/gas venturi and disconnect the fan electrical plugs. 2. Undo the screws securing the air/gas collector to the extension piece. Note its orientation and remove the extension piece (where fitted) from the cover. 3. Undo the screws securing the burner. Withdraw the burner from the cover and replace with the new one. 4. Examine the gasket(s), replacing if necessary. Note that the gaskets are not the same ! 5. After changing the burner check the combustion. 10.3.5 Insulation (Fig. 53) 1. Undo the securing screw and remove the airbox, disengaging it from the fan venturi. Remove the clip securing the gas feed pipe to the air/gas venturi and disconnect the fan electrical plugs. 2. Remove the electrodes as described in section 13.1. 3. Undo the nuts holding the cover to the heat exchanger. Draw the air/gas collector, fan and cover assembly away. 4. Remove the cover insulation piece. 5. Fit the new insulation carefully over the burner and align it with the slots for the electrodes. 6. If the rear insulation requires replacement, remove it and all debris from the heat exchanger. Also it may be necessary to separately remove the spring clip from the pin in the centre of the heat exchanger and the ‘L’ shaped clips embedded in the insulation. 7. Do not remove the shrink-wrapped coating from the replacement rear insulation. Keep the insulation vertical and press firmly into position. 8. Examine the cover seal and replace if necessary. Reassemble in reverse order. Fig. 52 Heat Exchanger Rear Insulation Cover Insulation Seal Air/Gas Collector Electrode Leads Fig. 53 Control Box removed for clarity Cover Burner Burner Gasket Extension Piece (note orientation) Air/Gas Collector Gasket Spark Ignition Electrode Flame Sensing Electrode Air Box Air Box

Страница 56 PDF

Страница 57

7219708 - 03 (03/17) EcoBlue System 57 Maintenance 10 10.3.6 Flue Sensor 1. For ease of access remove the Expansion Vessel on 12 - 15 - 18 - 24 - 28 models as described in Section 10.3.18. 2. Ease the retaining tab on the sensor away and disconnect the electrical plug. 3. Turn the sensor 90° anticlockwise to remove - it is a bayonet connection. 4. Reassemble in reverse order. 10.3.7 Igniter (Fig. 54) 1. Note the position of the ignition & sensing leads and disconnect them. Also disconnect the igniter feed plug. 2. Undo the screw securing the igniter mounting bracket to the left hand side panel. Remove the igniter and bracket and transfer the bracket to the new igniter. 3. Reassemble in reverse order, reconnecting the plug and leads to the igniter. 10.3.8 Heating Flow & Return Sensors (Fig. 55) 1. There is one sensor on the flow (red wires) and one sensor on the return (blue wires). Note: For access to the return sensor first remove the fan and air/gas collector (see 10.3.2). 2. After noting the position prise the sensor clip off the pipe and disconnect the plug. 3. Connect the plug to the new sensor and ease the clip onto the pipe as close to the heat exchanger as possible. 10.3.9 Safety Thermostat (Fig. 55) 1. Pull the two spade connections off the safety thermostat. 2. Remove the screws securing the thermostat to the mounting plate on the flow pipe. 3. Reassemble in reverse order, ensuring that the connections are pushed fully on. Flue Sensor Electrical Plug Fig. 54 Heating Flow Sensor Fig. 55 DHW NTC Sensor Fig. 56 Control Box removed for clarity Safety Thermostat Igniter Mounting Bracket Spark Connection (‘A’) Earth Connection (‘B’)

Страница 57 PDF

Страница 58

58 EcoBlue System 7219708 - 03 (03/17) 10 Maintenance 10.3.10 Pump - Head Only (Fig. 57) 1. Drain the boiler primary circuit and disconnect the electrical plug from the pump motor. 2. Remove the socket head screws securing the pump head to the body and draw the head away. 3. Reassemble in reverse order. 10.3.11 Pump - Complete (Fig. 58) 1. Drain the boiler primary circuit and disconnect the electrical plug from the pump motor. 2. Undo the two screws securing the body to the pipe and manifold and draw the pump forwards. 3. Unscrew the automatic air vent from the pump body. 4. Examine the ‘O’ ring seals on the return pipe and manifold, replacing if necessary. 5, Fit the air vent to the pump body and reassemble in reverse order. 10.3.12 Automatic Air Vent (Fig. 58) 1. Drain the boiler primary circuit and disconnect the electrical plug from the pump motor. 2. Examine the ‘O’ ring seal, replacing if necessary and fit it to the new automatic air vent. 3. Reassemble in reverse order. Socket Headed Screw Pump Head Pump Body Automatic Air Vent Fig. 57 Fig. 58 Pump Flow Pipe Control Box removed for clarity

Страница 58 PDF

Страница 59

7219708 - 03 (03/17) EcoBlue System 59 Maintenance 10 10.3.13 Safety Pressure Relief Valve (Fig. 59) 1. Close the flow and return isolation taps and drain the primary circuit. 2. To aid access disconnect the igniter plug & disconnect the two pipes from the top of the condensate trap and the drain pipe from the trap outlet. Undo the screw & washer securing the trap to the boiler lower panel. 3. Disengage the lip on the trap from the slotted bracket and remove the trap, taking care not to spill any residual condensate. 4. Disconnect the discharge pipe from the pressure relief valve and remove the sealing grommet. 5. Pull off the clip retaining the valve and withdraw it from the outlet assembly. 6. Fit the new valve and ‘O’ ring seal and reconnect the discharge pipe. Ensure the grommet is in place to maintain the integrity of the case seal. Refit the condensate trap. 10.3.14 Heating Pressure Gauge (Figs. 60 & 61) 1. Close the flow and return isolation taps and drain the primary circuit. 2. Hinge the control box downwards. To aid access remove the diverter valve motor. Remove the clip securing the pressure gauge capillary to the hydraulic assembly. 3. Disengage the securing tabs and open the terminal block cover. Prise apart the clips that hold the gauge cap. 4. Remove the gauge, cap and gasket. 5. Fit the new gauge, ensuring that the capillary is routed to prevent any sharp bends. Locate the ridge on the gauge body in the slot in the control box. 6. Reassemble in reverse order and ensure the gasket is in position to maintain the integrity of the case seal. Fig. 61 Heating Pressure Gauge Capillary Clip Clip ‘O’ Ring Seal Pressure Relief Valve Discharge Pipe Control Box removed for clarity Fig. 59 Fig. 60 Heating Pressure Gauge

Страница 59 PDF

Страница 60

60 EcoBlue System 7219708 - 03 (03/17) 10 Maintenance 10.3.15 Hydraulic Pressure Sensor (Fig. 63) 1. Close the flow and return isolation taps and drain the primary circuit. For ease of access remove the fan and collector assembly. 2. Remove the plug from the sensor and pull the retaining clip forwards. The clip is captive and does not need to be fully removed. 3. Reassemble in reverse order. Hydraulic Pressure Sensor Securing Clip (captive) Plug Fig. 63

Страница 60 PDF

Страница 61

7219708 - 03 (03/17) EcoBlue System 61 Maintenance 10 10.3.16 Main P.C.B. (Fig. 64) 1. Ensure that the power to the boiler is isolated. 2. Release the clips securing the control box cover and lift away. 3. Note the position of all plugs and wires on the P.C.B. and disconnect them. See Section 3.3 Electrical Diagram for details. 4. Undo the 5 securing screws and remove the P.C.B. It is retained at the left by two spring latches and the right hand edge locates in a slot. 5. Reassemble in reverse order, ensuring that the harnesses to the Control P.C.B. and terminal M2 are routed under the Main P.C.B. Check the operation of the boiler. 10.3.17 Boiler Control P.C.B. (Fig. 64) 1. Ensure that the power to the boiler is isolated. 2. Release the clips securing the control box cover and lift away. 3. Note the position of all plugs and wires on the P.C.B. and disconnect them. See Section 3.3 Electrical Diagram for details. 4. Undo the 5 securing screws and remove the P.C.B. It is retained at the left by two spring latches and the right hand edge locates in a slot. 5. Disconnect the link harness between the Main & Control P.C.B.’s and undo the 4 screws securing the Control P.C.B. 6. Remove the Control P.C.B. and fit the new component. Reassemble in reverse order, ensuring that the harnesses to the Control P.C.B. and terminal M2 are routed under the Main P.C.B. Check the operation of the boiler. Fig. 67 Control Box Cover Main P.C.B. Boiler Control P.C.B.

Страница 61 PDF

Страница 62

62 EcoBlue System 7219708 - 03 (03/17) 10 Maintenance 10.3.18 Expansion Vessel (12 - 15 - 18 - 24 - 28 models) See Section 14 for 32 model procedure. 1. Close the flow and return isolation taps and drain the primary circuit. 2. Prise off the securing clip and disconnect the braided hose from the vessel. 3 . Whilst supporting the vessel undo the locknut and manoeuvre the vessel out of the boiler. 4. Reassemble in reverse order. 10.3.19 Gas Valve (Fig. 69) After replacing the valve the CO2 must be checked and adjusted as detailed in Section 10.3.20 Setting the Gas Valve. Only change the valve if a suitable calibrated combustion analyser is available, operated by a competent person - see section 10.1.3. 1. Undo the screw and disconnect the electrical plug. 2. Turn the gas cock off and undo the nut on the gas valve inlet underneath the boiler. 3. Undo the nut on the gas valve outlet. Ease the pipe aside. NOTE: The gas nozzle injector is inserted in the gas valve outlet. 4. Remove the screws securing the gas valve to the boiler bottom panel. Remove the valve. 5. Transfer the gas nozzle injector to the new valve, ensuring it sits in the valve outlet. Examine the sealing washers, replacing if necessary. 6. Reassemble in reverse order. Check gas tightness & CO2 ! Gas Valve Gas Cock Fig. 68 Electrical Plug Expansion Vessel Lock Nut Fig. 69 Washer Gas Nozzle Injector Gas Feed Pipe Washer

Страница 62 PDF

Страница 63

7219708 - 03 (03/17) EcoBlue System 63 Maintenance 10 EV1 EV2 P. OUT 1 2 3 4 VENT RQ ADJ. P . R . A D J . Throttle Adjustment Screw (cover removed) Offset Adjustment Screw (cap fitted) Gas Valve Fig. 100 If the CO2 is reset at minimum rate it must be rechecked at maximum rate again and adjusted if required. If the CO2 is reset at maximum rate it must be rechecked at minimum rate and adjusted if required. Reduce CO2 at min. rate Increase CO2 at min. rate Reduce CO2 at max. rate Increase CO2 at max. rate Fig. 70 Plug Analyser Probe Flue Sampling Point /R /P + + R EcoBlue ‘Chimney Sweep Mode’ • This function must not be activated whilst the burner is lit. • The case front panel must be fitted when checking combustion. • Ensure the system is cold 1. Press & together and hold for at least 6 seconds. is displayed briefly followed by flashing alternately with , or . 2. represents MAXIMUM Heating input, represents MAXIMUM Heating input whilst denotes MINIMUM input. 3. Press or to adjust the input. 4. The valve must be checked and set at MAXIMUM Heating input & MINIMUM input. R Do not turn the adjustment screws more than 1/8 of a turn at a time. Allow the analyser reading to settle before any further adjustment 10.3.20 Setting the Gas Valve (CO2 Check) The CO2 must be only be checked and adjusted to set the valve if a suitable calibrated combustion analyser is available, operated by a competent person - see Section 10.1.3. 1. The combustion (CO2) may be checked after running the boiler for several minutes. To do this it is necessary to operate the boiler in ‘Chimney Sweep Mode’. The CO2 should be 8.7% ± 0.2 at MAXIMUM 2. It is possible to alter the CO2 by adjustment of the gas valve. At maximum rate the Throttle Adjustment Screw should be turned, using a suitable 2.5mm hexagon key, until the correct reading is obtained (Fig. 100). Turning clockwise will reduce the CO2. Anticlockwise will increase th e CO2. 3. The CO2 must then be checked at minimum rate. The CO2 should be 8.4% ± 0.2 at MINIMUM 4. With the boiler on minimum, the Offset Adjustment Screw must be altered, using a suitable 4mm hexagon key, after removing the cap (Fig. 100). Turning anti-clockwise will reduce the CO2. Clockwise will increase th e CO2. 5. Check the Combustion Performance (CO/CO2 ratio). This must be less than 0.004. Refit the sampling point plug and ensure there is no leakage of products.

Страница 63 PDF

Страница 64

20 28 40 109 110 111 117 118 125 128 130 133 151 160 384 64 EcoBlue System 7219708 - 03 (03/17) 11 Troubleshooting 11.1 Error Codes 1. If a fault occurs on the boiler an error code may be shown by the facia display. 2. The codes are a flashing number, either two or three digit, preceded by the symbol :- followed by 20, 28, 40 or 160 indicates possible faulty components. 110 and 111 indicate overheat of the primary system water. 117 is displayed when the primary water pressure is greater than 2.7 bar. Restoring the correct pressure will reset the error. 118 is displayed when the primary water pressure is less than 0.5 bar. Restoring the correct pressure will reset the error. 133, indicates that the gas supply has been interrupted, ignition has failed or the flame has not been detected. 128 is displayed if there has been a flame failure during normal operation. 125 is displayed in either of two situations:- i) If within 15 seconds of the burner lighting the boiler temperature has not changed by 1°C. ii) If within 10 minutes of the burner lighting the boiler actual temperature twice exceeds the selected temperature by 30°. In these instances poor primary circulation is indicated. 3. By pressing the 'Reset' button for 1 to 3 seconds when 110, 125 & 133 are displayed it is possible to relight the boiler. 4. If this does not have any effect, or the codes are displayed regularly further investigation is required. 11.2 Fault Finding 1. Check that gas, water and electrical supplies are available at the boiler. 2. Electrical supply = 230V ~ 50 Hz. 3. The preferred minimum gas pressure is 20 mb (NG). 4. Carry out electrical system checks, i.e. Earth Continuity, Resistance to Earth, Short Circuit and Polarity with a suitable meter. NOTE: These checks must be repeated after any servicing or fault finding. 5. Ensure all external controls are calling for heat and check all external and internal fuses. Before any servicing or replacement of parts, ensure the gas and electrical supplies are isolated. The button can be pressed so that the display shows the following information:- ‘00’ alternates with Sub-Code (only when fault on boiler) or ‘000’ ‘01’ alternates with CH Flow Temperature ‘02’ alternates with Outside Temperature (where Sensor fitted) ‘03’ alternates with stored DHW Temperature ‘04’ alternates with DHW Temperature ‘05’ alternates with System Water Pressure ‘06’ alternates with CH Return Temperature ‘07’ alternates with Flue Temperature ‘08’ - not used ‘09’ alternates with Collector Temperature ‘10’ alternates with Zone 1 CH Flow Temperature ‘11’ alternates with Zone 2 CH Flow Temperature ‘12’ alternates with Ionization current ‘13’ alternates with Burner working hours ‘14’ alternates with Zone 1 CH mode ‘15’ alternates with Zone 2 CH mode ‘16’ alternates with DHW circuit operating mode ‘17’ alternates with Boiler operating mode ‘18’ alternates with Solar plant operating mode ‘19’ alternates with Manufacturer information ‘20’ alternates with Manufacturer information Table Of Error Codes R R R R R R 11 Troubleshooting Central Heating NTC Fault Flue NTC Fault Central Heating Return NTC Fault Possible Circulation Fault Safety Thermostat Operated (pump fault) Safety Thermostat Operated (over temperature) Primary System Water Pressure Too High Primary System Water Pressure Too Low Circulation Fault (Primary) Flame Failure (no lock-out) Flue NTC Operated Interruption Of Gas Supply or Flame Failure Flame Failure Fan or Fan Wiring Fault False Flame R

Страница 64 PDF

Страница 65

7219708 - 03 (03/17) EcoBlue System 65 Troubleshooting 11 Turn on mains power The display illuminates 20, 28, 40 or 321 flashing 117 or 118 flashing 110, 125, 133, or 384 flashing Set Central Heating temperature to Maximum. symbol flashing, pump runs Go to section ‘A’ Go to section ‘D’ Ensure all controls and programmers are calling for heat Go to section ‘B’ If 110 is still flashing go to section ‘H’ YES YES NO NO NO YES YES YES NO YES YES YES NO NO Go to section ‘I’ Ensure controls are set to demand and verify the contacts are closed NO Press the reset button for 1 to 3 seconds If 110 or 384 is flashing or re-occurs regularly, check all PCB connections. If this has no effect replace the PCB. Spark at ignition electrodes up to 5 seconds & for 4 attempts Go to section ‘F’. Press the reset button for 1 to 3 seconds YES Burner lights Go to section ‘E’ Burner goes out after 5 seconds 133 flashing Go to section ‘G’ YES YES NO 109 flashing 125 flashing after 1 min Go to section ‘J’ YES YES 110 or 111 flashing NO Go to section ‘H’ YES NO Burner modulates to maintain set temperature Check Heating Flow sensor. Go to section ‘D’ NO 130 flashing YES Go to section ‘K’ YES Burner goes out NO Fan stops after 15 seconds YES Boiler operation correct YES 133 and flashing Flame Displayed YES Check polarity NO NO Fan runs at correct speed 160 flashing Go to section ‘C’ R Refer to “Illustrated Wiring Diagram” for position of terminals and components Central Heating - Follow operational sequence

Страница 65 PDF

Страница 66

66 EcoBlue System 7219708 - 03 (03/17) 11 Troubleshooting Fault Finding Solutions Sections Is there 230V at: Main terminals L and N Check electrical supply 1. NO Main terminal fuse Replace fuse Display illuminated 2. NO PCB - X10 connector Main terminals L and N Check wiring 3. NO NO A B C NO Fan connections correct at fan & PCB X11 and X23 connectors - see Wiring Diagram. Make connections Fan jammed or faulty wiring Connection OK at X40 Display or Main PCB fault 230V at PCB - X11 connector 3 to 4 NO Replace PCB YES 230V at pump YES Replace pump NO Check wiring 230V at PCB - X11 connector (between blue & brown - see Wiring Diagram) YES NO Replace PCB Replace fan or wire YES YES Temperature sensor faulty. Check correct location and wiring. NO D Replace sensor & reset boiler YES Gas at burner Ensure gas is on and purged Replace PCB Replace gas valve & Check combustion Check wiring and PCB - X14 connector see Wiring Diagram YES NO NO E Cold resistance approximately 10k @ 25° C (CH sensor) 20k @ 25° C (Flue sensor) (resistance reduces with increase in temp.) Switch to DHW mode maximum flow & press reset. During next three minutes check :-

Страница 66 PDF

Страница 67

7219708 - 03 (03/17) EcoBlue System 67 Troubleshooting 11 Replace PCB Check and correct if necessary 1. Ignition electrode and lead 2. Electrode connection 3. Spark gap and position Check wiring (see Diagram) and 230V at PCB X14 (between blue & brown from igniter) YES NO F 7.5*±1 4 ±0.5 10 ±1 Spark Ignition Electrode Flame Sensing Electrode *NOTE: On 12 & 15 models gap is 5mm ! Electrode Position Viewing Window Burner Check and correct if necessary 1. The set of the gas valve (CO2 values - see Section 10.3.20) 2. Flame sensing electrode and lead connections 3. Flame sensing electrode position 1. 2. G Replace sensing electrode or PCB Replace PCB YES Replace safety thermostat YES NO Safety Thermostat operated or faulty Check for and correct any system faults H Allow to cool. Continuity across thermostat terminals more than 1.5 ohm NO Check Flow & Return Sensors - see section ‘D’ NO Is 110 or 111 still flashing ? YES Check supply pressure at the gas cock test point (Fig. 41):- Natural Gas - Minimum 17 mbar YES Replace Igniter

Страница 67 PDF

Страница 68

68 EcoBlue System 7219708 - 03 (03/17) 11 Troubleshooting I Temperature sensors faulty. Cold resistance approximately 10k @ 25° C (CH sensor) 20k @ 25° C (Flue sensor) (resistance reduces with increase in temp.) NO Replace sensor YES If pump is running the heat exchanger could be obstructed Replace heat exchanger 1. 2. Replace hydraulic pressure sensor YES Restore correct system pressure YES NO CH system pressure less than 0.5 bar or greater than 2.7 bar on digital display Check wiring and PCB - X22 connector for approx. 5V DC between green & black - see Wiring Diagram Replace PCB NO J Replace sensor NO System fault - correct NO YES Ensure that the boiler and system are fully vented Check flow temperature sensor connections and position. Cold resistance approximately 10k @ 25° C (CH sensors) (resistance reduces with increase in temp.) YES Go to section ‘B’ K

Страница 68 PDF

Страница 69

7219708 - 03 (03/17) EcoBlue System 69 Decommissioning 12 12 Decommissioning 12.1 Decommissioning Procedure 1. Disconnect the gas & electric supplies and isolate them. 2. Drain the primary circuit and disconnect the filling device. 3 . Dismantle the chimney system and remove the boiler from the wall mounting frame.

Страница 69 PDF

Страница 70

70 EcoBlue System 7219708 - 03 (03/17) 13 Spare Parts 13 Spare Parts A B C D F K O P M Q R E V S U 13.1 General 1. If, following the annual inspection or maintenance any part of the boiler is found to need replacing, use Genuine Baxi Spare Parts only. 13.2 Spare Parts List W Key Description Manufacturers No. No. Part No. A Fan 720768101 B Burner - 12/15/18/24 7212447 Burner - 28 7212449 Burner - 32 7212448 C Spark Ignition Electrode 720767301 D Flame Sensing Electrode 12/15 720767201 Flame Sensing Electrode 18/24/28/32 7211855 E Gas Valve 7214341 F Safety Thermostat 720765301 K Pump 7220533 M Heating Flow/Return Sensor 720747101 O Pump Automatic Air Vent 720777601 P Hydraulic Pressure Switch 720778001 Q Heating Pressure Gauge 7212896 R Flue Sensor 720851401 S PCB - 12 ErP 7222713 PCB - 15 ErP 7222714 PCB - 18 ErP 7222715 PCB - 24 ErP 7222716 PCB - 28 ErP 7222717 PCB - 32 ErP 7222718 U Ø3.8 Gas Nozzle Injector - 12 7212975 Ø4.2 Gas Nozzle Injector - 15/18 7212976 Ø5.0 Gas Nozzle Injector - 24 7211862 Ø5.6 Gas Nozzle Injector - 28 7214344 Ø6.0 Gas Nozzle Injector - 32 7212533 V Air/Gas Venturi - 12 7212977 Air/Gas Venturi - 15/18 7212978 Air/Gas Venturi - 24/28 7211858 Air/Gas Venturi - 32 7211859 W Boiler Control HMI PCB 7211868

Страница 70 PDF

Страница 71

7219708 - 03 (03/17) EcoBlue System 71 32 Model Supplement 14 14 32 Model Supplement 14.1 32 Model Supplement Heat Input Qn Hs (Gross) Max Min 32 model kW 35.52 6.99 Heat Output Pn (Non-Condensing) Max Min 32 model kW 32 6.1 Appliance Category CAT I 2H Heat Output Pnc (Condensing) Max Min 32 model kW 33.9 6.6 Appliance Type C13 C33 C53 Gas Nozzle Injector 32 model mm Ø 6.0 Power Consumption 32 model W 90 Dynamic (nominal) Inlet Pressure (Natural Gas - G20) mbar 20 with a CV of 37.78 MJ/m3 Max Gas Rate (Natural Gas - G20) (After 10 mins) 32 model m3/h 3.38 NATURAL GAS ONLY ! Weights (32 model) Packaged Boiler Carton 43.2kg Installation Lift Weight 37.5kg Outercase Dimensions Casing Height - 763mm Overall Height Inc Flue Elbow - 923mm Casing Width - 450mm Casing Depth - 345mm Expansion Vessel - (For Central Heating only. Integral with appliance) bar Min Pre-charge Pressure 1.0 litre Max Capacity of CH System 155 Primary Water Content of Boiler (unpressurised) 2.8 150mm* Min 763mm 450mm 175 mm Min (300mm Min if using 80/125mm flueing system) 5mm Min 5mm Min *This is MINIMUM recommended dimension. Greater clearance will aid installation and maintenance. 5mm Min In Operation 450mm Min 345mm For Servicing Purposes & Operating the Controls At least 1.5°

Страница 71 PDF

Страница 72

72 EcoBlue System 7219708 - 03 (03/17) 14 32 Model Supplement 14.1 32 Model Supplement Dimensions A 763mm B 345mm C 450mm D 116mm Ø Min. E 160mm (207mm for 80/125mm flue systems) F 140mm G 106mm H 170mm J 280mm 360° Orientation Flue Ø 100mm D C B A E G F At least 1.5° H J Pressure Relief Valve (15mm) Condensate Drain 130 mm 130 mm 45 mm 50 mm 30 95 mm Heating Return (22mm) Heating Flow (22mm) Gas Inlet (22mm) Tap Rail There must be no part of the air duct (white tube) visible outside the property.

Страница 72 PDF

Страница 73

7219708 - 03 (03/17) EcoBlue System 73 32 Model Supplement 14 14.1 32 Model Supplement - cont. Expansion Vessel Lock Nut Support Bracket Changing Components - Expansion Vessel 1. Close the flow and return isolation taps and drain the boiler primary circuit. 2. Undo the nut on the pipe connection at the bottom of the vessel, and slacken the nut on the hydraulic inlet assembly. 3. Remove the screws securing the support bracket, and withdraw the bracket. 4. Whilst supporting the vessel undo and remove the locknut securing the vessel spigot to the boiler top panel. 5. Manoeuvre the vessel out of the boiler. 6. Reassemble in reverse order.

Страница 73 PDF

Страница 74

74 *All installations in England and Wales must be to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance will then be issued to the customer. www.centralheating.co.uk © Heating and Hotwater Industry Council (HHIC) This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This does not affect the customer’s statutory rights. GAS BOILER SYSTEM COMMISSIONING CHECKLIST Customer name: Telephone number: Address: Boiler make and model: Boiler serial number: Commissioned by (PRINT NAME): Gas Safe register number: Company name: Telephone number: Company address: Commissioning date: CONTROLS (tick the appropriate boxes) Time and temperature control to heating Room thermostat and programmer/timer Programmable room thermostat Load/weather compensation Optimum start control Time and temperature control to hot water Cylinder thermostat and programmer/timer Combination Boiler Heating zone valves Fitted Not required Hot water zone valves Fitted Not required Thermostatic radiator valves Fitted Not required Automatic bypass to system Fitted Not required Boiler interlock Provided ALL SYSTEMS ’s instructions Yes What system cleaner was used? What inhibitor was used? Quantity litres Yes No CENTRAL HEATING MODE measure and record: Gas rate m³/hr OR ft³/hr Burner operating pressure (if applicable) mbar OR Gas inlet pressure mbar °C Central heating return temperature °C COMBINATION BOILERS ONLY Is the installation in a hard water area (above 200ppm)? Yes No Yes No DOMESTIC HOT WATER MODE Measure and Record: Gas rate m³/hr OR ft³/hr Burner operating pressure (at maximum rate) mbar OR Gas inlet pressure at maximum rate mbar Cold water inlet temperature °C Hot water has been checked at all outlets Yes Temperature °C I/min CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798 Yes ALL INSTALLATIONS Record the following: At max. rate: CO ppm AND CO/CO² Ratio At min. rate: (where possible) CO ppm AND CO/CO² Ratio The heating and hot water system complies with the appropriate Building Regulations Yes The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions Yes The operation of the boiler and system controls have been demonstrated to and understood by the customer Yes The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes Commissioning Engineer’s Signature Customer’s Signature www.centralheating.co.uk

Страница 74 PDF

Страница 75

75 www.centralheating.co.uk It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. SERVICE RECORD SERVICE 01 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 02 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 03 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 04 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 05 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 06 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 07 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 08 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 09 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 10 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature *All installations in England and Wales must be to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance will then be issued to the customer. © Heating and Hotwater Industry Council (HHIC)

Страница 75 PDF

Страница 76

7219708 - 03 (03/17) 0086 Baxi Customer Support 0344 871 1545 Opening hours Monday - Friday, 8.00am-6.00pm Weekends and Bank Holidays, 8.30am-2.00pm Please note calls may be recorded for training and monitoring purposes baxi.co.uk Register now to activate your warranty: www.baxi.co.uk/registration For the warranty to be maintained, please make sure... Benchmark checklist is completed Warranty is registered within 30 days The boiler has an annual service 1 2 3 For full terms and conditions, visit www.baxi.co.uk/terms. Failure to adhere to terms and conditions will void your manufacturer’s warranty. Baxi Brooks House, Coventry Road, Warwick, CV34 4LL Please ensure the boiler is installed in accordance with these installation instructions and that you adhere to the Building Regulations. e&oe All descriptions and illustrations provided in this document have been carefully prepared but we reserve the right to make changes and improvements in our products which may affect the accuracy of the information contained in this leaflet. All goods are sold subject to our standard Conditions of Sale which are available on request.

Страница 76 PDF