Baxi
Інструкція Baxi 100 Combi
Архівний PDF-документ для ознайомлення.
Інструкція · Українська · Оновлено: 11 серпня 2026 р.
Оригінальний PDF
Завантаження PDF…
Залишити заявку майстру
Потрібна діагностика або допомога з інструкцією? Передайте майстру модель котла та код помилки.
Текст інструкції для пошуку
Сторінка 1
Installation and Service Manual Condensing Combination Boiler 124 - 128 Combi en United Kingdom These instructions include the Benchmark Commissioning Checklist and should be left with the user for safe keeping. They must be read in conjunction with the Flue Installation Guide.
Сторінка 1 PDF
Сторінка 2
2 © Baxi Heating UK Ltd 2017 Model Range Baxi 124 Combi G.C.No 47-077-25 Baxi 128 Combi G.C.No 47-077-26 © Baxi Heating UK Ltd 2017 All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, or stored in any retrieval system of any nature (including in any database), in each case whether electronic, mechanical, recording or otherwise, without the prior written permission of the copyright owner, except for permitted fair dealing under Copyrights, Designs and Patents Act 1988. Applications for the copyright owner’s permission to reproduce or make other use of any part of this publication should be made, giving details of the proposed use, to the following address: The Company Secretary, Baxi Heating UK Limited, Brooks House, Coventry Road, Warwick. CV34 4LL Full acknowledgement of author and source must be given. WARNING: Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages. The Benchmark Scheme Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference. Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme. Visit www.centralheating.co.uk for more information. 0086 ISO 9001 FM 00866 Building Regulations and the Benchmark Commissioning Checklist Building Regulations (England & Wales) require notification of the installation of a heating appliance to the relevant Local Authority Building Control Department. This can be achieved via a Competent Persons Self Certification Scheme as an option to notifying the Local Authority directly. The Health & Safety Executive operates the ‘Gas Safe Register’, a self-certification scheme for gas heating appliances. These arrangements represent a change from the situation whereby compliance with Building Regulations was accepted as being demonstrated by completion of the Benchmark Logbook (which was then left on site with the customer). With the introduction of Self Certification Schemes, the Benchmark Logbook is being withdrawn. However, a similar document in the form of a commissioning checklist and service interval record is incorporated at the back of these instructions. This company is a member of the Benchmark initiative and fully supports the aims of the programme. Its aim is to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency. Building Regulations require that installations should comply with manufacturer's instructions. It is therefore important that the commissioning checklist is completed by the installer. The relevant section of Building Regulations only relates to dwellings. Therefore the checklist only applies if the appliance is being installed in a dwelling or some related structure. The flowchart opposite gives guidance for installers on the process necessary to ensure compliance with Building Regulations. This boiler can be used by children aged 8 years and above and by persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge when they have been given supervision or instruction concerning the safe use of the device and understand the resulting risks. Children must not be allowed to play with the appliance. Cleaning and user maintenance must not be carried out by children without supervision. Warning !
Сторінка 2 PDF
Сторінка 3
3 Installer Notification Guidelines © Baxi Heating UK Ltd 2017 Choose Building Regulations Notification Route Contact your relevant Local Authority Building Control (LABC) who will arrange an inspection or contact a government approved inspector LABC will record the data and will issue a certificate of compliance ‘Gas Safe Register’ will issue a Building Regulations Compliance Certificate to the property owner and inform the relevant LABC You must ensure that the certificate number issued by the ‘Gas Safe Register’ is written onto the Benchmark Checklist Scheme Members only Call ‘Gas Safe Register’ on: 0800 408 5577 or log onto: www.gassaferegister.co.uk within 10 days If you notify via the ‘Gas Safe Register’, the register will issue the Building Regulations certificate on members’ behalf Complete the Benchmark Checklist Install and Commission this appliance to manufacturer's instructions Competent Person's Self Certification Scheme Building Control Complete the Benchmark Checklist Install and Commission this appliance to manufacturer's instructions
Сторінка 3 PDF
Сторінка 4
4 Legislation © Baxi Heating UK Ltd 2017 Codes of Practice - refer to the most recent version IMPORTANT - Installation, Commissioning, Service & Repair This appliance must be installed in accordance with the manufacturer’s instructions and the regulations in force. Read the instructions fully before installing or using the appliance. In GB, this must be carried out by a competent person as stated in the Gas Safety (Installation & Use) Regulations. Definition of competence: A person who works for a Gas Safe registered company and holding current certificates in the relevant ACS modules, is deemed competent. In IE, this must be carried out by a competent person as stated in I.S. 813 “Domestic Gas Installations”. The addition of anything that may interfere with the normal operation of the appliance without express written permission from the manufacturer or his agent could invalidate the appliance warranty. In GB this could also infringe the Gas Safety (Installation and Use) Regulations. Warning - Check the information on the data plate is compatible with local supply conditions. This company declare that no substances harmful to health are contained in the appliance or used during appliance manufacture. The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force, and only used in a suitably ventilated location. In GB, the installation must be carried out by a Gas Safe Registered Installer. It must be carried out in accordance with the relevant requirements of the: • Gas Safety (Installation & Use) Regulations. • The appropriate Building Regulations either The Building Regulations, The Building Regulations (Scotland), Building Regulations (Northern Ireland). • The Water Fittings Regulations or Water Byelaws in Scotland. • The Current I.E.E. Wiring Regulations. Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice. In IE, the installation must be carried out by a competent Person and installed in accordance with the current edition of I.S. 813 ‘Domestic Gas Installations’, the current Building Regulations and reference should be made to the current ETCI rules for electrical installation. All systems must be thoroughly flushed and treated with inhibitor (see section 6.2). All Gas Safe registered engineers carry an ID card with their licence number and a photograph. You can check your engineer is registered by telephoning 0800 408 5500 or online at www.gassaferegister.co.uk In GB the following Codes of Practice apply: Standard Scope BS 6891 Gas Installation. BS 5482 Part 1 Butane & Propane Gas Installation BS 5546 Installation of hot water supplies for domestic purposes. BS EN 12828 Heating systems in buildings. BS EN 12831 Heating systems in buildings - Calculation of load. BS EN 14336 Installation & commissioning of water based heating systems. BS 6798 Installation of gas fired hot water boilers. BS 5440 Part 1 Flues. BS 5440 Part 2 Ventilation. BS 7074 Expansion vessels and ancillary equipment for sealed water systems. BS 7593 Treatment of water in domestic hot water central heating systems. In IE the following Codes of Practice apply: Standard Scope I.S. 813 Domestic Gas Installations. The following standards give valuable additional information; BS 5546 Installation of hot water supplies for domestic purposes. BS EN 12828 Heating systems in buildings. BS EN 12831 Heating systems in buildings - Calculation of load. BS EN 14336 Installation & commissioning of water based heating systems. BS 7074 Expansion vessels and ancillary equipment for sealed water systems. BS 7593 Treatment of water in domestic hot water central heating systems. Homologations CE Marking EC - Declaration of Conformity Baxi Heating UK Limited being the manufacturer / distributor within the European Economic Area of the following Baxi Combi 124 - 128 declare that the above is in conformity with the provisions of the Council Directive 2009/142/EC, 92/42/EEC, 2009/125/EC, 2010/30/EC, 2014/35/EU, 2014/30/EU and has been subject to the following conformity procedures laid down in Annex 2 - Article 3 of 2009/142/EC under the supervision of the British Standards Institution, a Notified Body authorized by the United Kingdom Competent Authority, and carrying the Notified Body Number 0086. Type test for purpose of Regulation 5 certified by: Notified Body 0085. Product/Production certified by: Notified Body 0086. For GB/IE only.
Сторінка 4 PDF
Сторінка 5
5 Safe Manual Handling © Baxi Heating UK Ltd 2017 General The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance. Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands. Health & Safety is the responsibility of EVERYONE. There is no ‘safe’ limit for one man - each person has different capabilities. The boiler should be handled and lifted by TWO PEOPLE. Do not handle or lift unless you feel physically able. Wear appropriate Personal Protection Equipment e.g. protective gloves, safety footwear etc. Preparation Co-ordinate movements - know where, and when, you are both going. Minimise the number of times needed to move the boiler - plan ahead. Always ensure when handling or lifting the route is clear and unobstructed. If possible avoid steps, wet or slippery surfaces, unlit areas etc. and take special care on ladders/into lofts. Technique When handling or lifting always use safe techniques - keep your back straight, bend your knees. Don’t twist - move your feet, avoid bending forwards and sideways and keep the load as close to your body as possible. Where possible transport the boiler using a sack truck or other suitable trolley. Always grip the boiler firmly, and before lifting feel where the weight is concentrated to establish the centre of gravity, repositioning yourself as necessary. See the ‘Installation’ section of these instructions for recommended lift points. Remember The circumstances of each installation are different. Always asses the risks associated with handling and lifting according to the individual conditions. If at any time when installing the boiler you feel that you may have injured yourself STOP !! DO NOT ‘work through’ the pain - you may cause further injury. IF IN ANY DOUBT DO NOT HANDLE OR LIFT THE BOILER - OBTAIN ADVICE OR ASSISTANCE BEFORE PROCEEDING !!
Сторінка 5 PDF
Сторінка 6
6 © Baxi Heating UK Ltd 2017 CONTENTS 1.0 Introduction 7 2.0 General Layout 8 3.0 Appliance Operation 9 4.0 Technical Data 10 5.0 Dimensions and Fixings 12 6.0 System Details 13 7.0 Site Requirements 16 8.0 Flue Options 21 9.0 Installation 23 10.0 Commissioning 28 11.0 Completion & System Draining 31 12.0 Servicing 32 13.0 Changing Components 34 14.0 Combustion & Calibration 43 15.0 Electrical 44 16.0 Short Parts List 45 17.0 Fault Finding 46 18.0 External Low Voltage Controls 52 19.0 ‘Service Due’ Message 56 Benchmark Checklist 58 Section Page
Сторінка 6 PDF
Сторінка 7
7 1.0 Introduction © Baxi Heating UK Ltd 2017 1.1 Description 1. The Baxi Combi 100 Range are fully automatic gas fired wall mounted condensing combination boilers. They are room sealed and fan assisted, and will serve central heating and mains fed domestic hot water. 2. The boiler is set to give a maximum output of :- 24 models - 24 kW DHW 21.2 kW CH Pnc (Condensing) 28 models - 28 kW DHW 25.3 kW CH Pnc (Condensing) 3. The boiler is factory set for use on Natural Gas (G20). It can be adapted to operate on Propane (G31) - see Section 10.1 ‘Gas Type Check’. 4. The boiler is suitable for use only on fully pumped sealed heating systems. Priority is given to domestic hot water. 5. The boiler data badge gives details of the model, serial number and Gas Council number and is situated on the control box. It is visible when the case front panel is removed (Fig. 2). 6. The boiler model, serial number and Gas Council number are also shown on the information label behind the boiler control flap (Fig. 1). This is for user reference. 7. The boiler is intended to be installed in residential/domestic environments on a governed meter supply only. 8. The boiler must be installed with one of the purpose designed flues such as one of the standard horizontal telescopic flue kits detailed in the Flue Installation Guide . 9. All systems must be thoroughly cleansed, flushed and treated with inhibitor (see section 6.2). 1.2 Optional Extras Various timers, external controls, etc. are available as optional extras. Full details are contained in the relevant sales literature. 1.3 Contents of Pack The pack contains:- • Boiler • Valve & Copper Tail Set • Template • Fittings & Literature Pack NOTE: These Installation & Servicing Instructions MUST be read in conjunction with the Flue Installation Guide supplied in the Literature Pack. Fig. 1 Control Flap Fig. 2 Information Label Data Badge Gas Type Label
Сторінка 7 PDF
Сторінка 8
8 2.0 General Layout © Baxi Heating UK Ltd 2017 2.1 Layout 1. Expansion Vessel 2. Boiler Adaptor 3. Primary Heat Exchanger 4. DHW Plate Heat Exchanger 5. Pump with Automatic Air Vent 6. Central Heating System Pressure Gauge 7. Fan Assembly 8. Exp. Vessel Locating Stud 9. Flame Sensing Electrode 10. Air/Gas Collector 11. Spark Ignition Electrode 12. Combustion Box Cover & Burner 13. Control Box Display 14. Condensate Trap 15. Safety Pressure Relief Valve 16. Gas Valve 17. Diverter Valve Motor 18. Boiler Control 19. Optional Timer 20. Boiler Drain Tap 21. Heating Flow Sensor 22. Safety Thermostat 1 2 3 4 5 6 7 9 8 10 11 12 13 14 15 19 18 16 20 17 22 21
Сторінка 8 PDF
Сторінка 9
9 3.0 Appliance Operation © Baxi Heating UK Ltd 2017 3.1 Central Heating Mode 1. With a demand for heating, the pump circulates water through the primary circuit. 2. Once the burner ignites the fan speed controls the gas rate to maintain the heating temperature measured by the temperature sensor. 3. When the flow temperature exceeds the setting temperature, a 3 minute delay occurs before the burner relights automatically (anti-cycling). The pump continues to run during this period. 4. When the demand is satisfied the burner is extinguished and the pump continues to run for a period of 3 minutes (Pump Overrun). 3.2 Domestic Hot Water Mode 1. Priority is given to the domestic hot water supply. A demand at a tap or shower will override any central heating requirement. 2. The flow of water will operate the Domestic Hot Water Sensor (‘Hall Effect Sensor’) which requests the 3 way valve to change position. This will allow the pump to circulate the primary water through the DHW plate heat exchanger. 3. The burner will light automatically and the temperature of the domestic hot water is controlled by the temperature sensor. 4. When the domestic hot water demand ceases the burner will extinguish and the diverter valve will remain in the domestic hot water mode, unless there is a demand for central heating. 3.3 Boiler Frost Protection Mode 1. The frost protection mode is integral to the appliance and functions as long as there is power to the boiler, as indicated by the standby signal . 2. With CH & DHW or CH only selected, when the boiler temperature falls below 5°C the boiler will fire until a temperature of 30°C is reached. 3. If DHW only is selected, when the boiler CH temperature falls below 5°C the boiler will fire until a temperature of 30°C is reached. When the boiler DHW temperature falls below 5°C the boiler will fire until a temperature of 7°C is reached. 4. Further protection can be incorporated by using a system frost thermostat. 3.4 Pump Protection 1. If the boiler has been inactive for a period of 24 hours the pump will automatically operate for 1 minute to prevent sticking. M Key 1. Pump with Automatic Air Vent 2. Diverter Valve Assembly 3. Diverter Valve motor 4. CH System Pressure Gauge 5. Central Heating Filter 6. Domestic Hot Water Filter 7. Domestic Hot Water Priority Sensor (‘Hall Effect Sensor’) 8. Domestic Hot Water NTC sensor 9. Non-return Valve 10. Hydraulic Pressure Sensor 11. Boiler Drain Tap 12. Pressure Relief Valve 13. Plate Heat Exchanger 14. Condensate Trap 15. Gas Valve 16. Safety Thermostat (105°C) 17. Heating Flow Sensor 18. Flue Sensor 19. Boiler Adaptor 20. Primary Heat Exchanger 21. Spark Ignition Electrode 22. Burner 23. Flame Sensing Electrode 24. Air/Gas Collector 25. Return Heating Sensor 26. Fan 27. Air/Gas Venturi 28. Expansion Vessel Connections:- A – Condensate Drain B – Heating Flow C – Domestic Hot Water Outlet D – Gas Inlet E – Cold Water Inlet On/Off Valve and filter F – Heating Return Fig. 3 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 14 17 18 19 20 21 22 23 24 25 26 28 27 A B C D E F Boiler Schematic Layout
Сторінка 9 PDF
Сторінка 10
10 4.0 Technical Data © Baxi Heating UK Ltd 2017 0 200 400 600 800 1000 1200 0.5 1 1.5 2 2.5 3 3.5 4 Metre (wg) Flow Rate (l/h) Pump - Available Head 0 5 5.5 6 4.5 4.1 124 & 128 Combi Flue Terminal Diameter 100mm Dimensions Projection 125mm Outercase Dimensions Casing Height - 700mm Overall Height Inc Flue Elbow - 860mm Casing Width - 390mm Casing Depth - 300mm* *This can be reduced to 290mm by removing the boiler control access flap Weights Packaged Boiler Carton 36.5kg Installation Lift Weight 32.5 kg Central Heating Primary Circuit Pressures bar Safety Discharge 3 Max Operating 2.5 Min Operating 0.5 Recommended Operating Range 1-2 DHW Circuit bar Pressures Max Operating 8 Min Operating 0.15 Flow Rates (24) (28) l/min l/min DHW Flow Rate @ 30o CRise 10.9 12.9 DHW Flow Rate @ 35o CRise 9.8 11.5 Min Working DHW Flow Rate 2 2 Pump Available Head See graph below Expansion Vessel - (For Central Heating only. Integral with appliance) bar Min Pre-charge Pressure 1 Max Capacity of litre CH System 100 Primary Water Content of Boiler (unpressurised) 2.5 Connections copper tails Gas Inlet - 22mm Heating Flow - 22mm Heating Return - 22mm Cold Water Inlet - 15mm Hot Water Outlet - 15mm Pressure Relief Discharge - 15mm Temperatures C.H. Flow Temp (adjustable) 25°C to 80°C max (± 5°C) D.H.W. Flow Temp (adjustable) 35°C to 60°C max (± 5°C) dependent upon flow rate NOx Class 5 Clearances Above Casing 175mm Min Below Casing 170mm Min* Front 450mm Min (For Servicing) Front 5mm Min (In Operation) L.H. Side 5mm Min R.H. Side 5mm Min : *This is MINIMUM recommended dimension. Greater clearance will aid installation and maintenance. Electrical Protection IPX5D Internal Fuse Rating F2L Inlet Pressure (Natural Gas - G20) mbar 20 Injector 24 model mm 4.4 28 model mm 4.6 Condensate Drain To accept 21.5mm (3/4 in) plastic waste pipe External Fuse Rating 3A Heat Input CH Qn Hs (Gross) Max Min 24 model kW 20.22 3.89 28 model kW 26.64 4.32 Heat Output CH Pn (Non-Condensing) Max Min 24 model kW 20 3.4 28 model kW 24 3.8 Appliance Category CAT II 2H 3P Heat Output CH Pnc (Condensing) Max Min 24 model kW 21.2 3.7 28 model kW 25.3 4.1 Heat Input DHW Qnw Hs (Gross) Max 24 model kW 27.4 28 model kW 32.1 Heat Output DHW Max 24 model kW 24 28 model kW 28 Max Gas Rate (Natural Gas - G20) (After 10 mins) 24 model m3/h 2.61 28 model m3/h 3.05 Inlet Pressure (Propane - G31) mbar 37 Max Gas Rate (Propane - G31) (After 10 mins) 24 model kg/h 1.96 28 model kg/h 2.29 NATURAL GAS ONLY ! PROPANE ONLY ! IMPORTANT: Where Low Flow Taps or Fittings are intended to be used in the DHW system connected it is strongly recommended that the DHW flow rate DOES NOT fall below 2.5l/min. This will ensure reliable operation of the DHW function. NOTE: All data in this section are nominal values and subject to normal production tolerances. SAP 2009 Annual Efficiency for N. G. models is 89% This value is used in the UK Government’s Standard Assessment Procedure (SAP) for energy rating of dwellings. The test data from which it has been calculated has been certified by 0035. SEDBUK Declaration Electrical Supply 230V~ 50Hz (Appliance must be connected to an earthed supply) Power Consumption 24 model W 85 28 model W 90 Appliance Type C13 C33 CO2 N.G. 9.0% ± 0.7 L.P.G. 10.5% ± 1.0
Сторінка 10 PDF
Сторінка 11
11 © Baxi Heating UK Ltd 2017 4.0 Technical Data 4.2 Technical Parameters Technical parameters for boiler combination heaters Condensing boiler 124 Baxi Combi Rated heat output Seasonal space heating energy efficiency Auxiliary electricity consumption Other items 128 Low-temperature boiler(1) B1 boiler Cogeneration space heater Combination heater Prated kW Useful heat output at rated heat output and high temperature regime(2) P4 kW Useful heat output at 30% of rated heat output and low temperature regime(1) P1 kW Šs % Useful efficiency at rated heat output and high temperature regime(2) Š4 % Useful efficiency at 30% of rated heat output and low temperature regime(1) Š1 % Full load elmax kW Part load elmin kW Standby mode PSB kW Standby heat loss Pstby kW Ignition burner power consumption Pign kW Annual energy consumption QHE kWh GJ Sound power level, indoors LWA dB Emissions of nitrogen oxides NOX Daily electricity consumption Domestic hot water parameters Declared load profile Water heating energy efficiency Qelec kWh Annual electricity consumption AEC kWh Šwh % Daily fuel consumption Qfuel kWh Annual fuel consumption AFC GJ (1) Low temperature means for condensing boilers 30°C, for low temperature boilers 37°C and for other heaters 50°C return temperature (at heater inlet) (2) High temperature regime means 60°C return temperature at heater inlet and 80°C feed temperature at heater outlet. See The back cover for contact details. mg/kWh Yes Yes No No Yes Yes No No No No 20 24 20.0 24.0 6.7 8.0 93 93 88.0 87.9 98.0 98.0 0.030 0.042 0.013 0.013 0.003 0.003 0.035 0.035 - - 17222 20556 62 74 49 50 15 17 XL XL 0.162 0.232 36 51 88 86 21.78 22.47 17 17
Сторінка 11 PDF
Сторінка 12
12 5.0 Dimensions and Fixings © Baxi Heating UK Ltd 2017 360° Orientation Flue Ø 100mm D C B A E G F At least 1.5° H J Heating Flow (22mm) Hot Water Outlet (15mm) Gas Inlet (22mm) Cold Water Inlet (15mm) Heating Return (22mm) Pressure Relief Valve (15mm) Condensate Drain 40 mm 25 mm 65 mm 65 mm 65 mm 65 mm 65 mm 162,5 mm Boiler Side Boiler Side Dimensions A 700mm B 300mm* *This can be reduced to 290mm by removing the boiler control access flap C 390mm D 116mm Ø Min. E 160mm (207mm for 80/125mm flue systems) F 130mm G 106mm H 228mm J 162mm There must be no part of the air duct (white tube) visible outside the property.
Сторінка 12 PDF
Сторінка 13
13 6.0 System Details © Baxi Heating UK Ltd 2017 6.1 Information 1. The Baxi 100 range of Condensing Combination Boilers are ‘Water Byelaws Scheme - Approved Products’. To comply with the Water Byelaws your attention is drawn to the following installation requirements and notes (IRN). a) IRN 001 - See text of entry for installation requirements and notes. b) IRN 302 - Byelaw 14. 2. Reference to the WRc publications, ‘Water fittings and materials directory’ and ‘Water supply byelaws guide’ give full details of byelaws and the IRNs. 6.2 Treatment of Water Circulating Systems Treatment of Water Circulating Systems • All recirculatory water systems will be subject to corrosion unless an appropriate water treatment is applied. This means that the efficiency of the system will deteriorate as corrosion sludge accumulates within the system, risking damage to pump and valves, boiler noise and circulation problems. • When fitting new systems flux will be evident within the system, which can lead to damage of system components. • BS7593 gives extensive recommendations on system cleansing and water treatment. • All systems must be thoroughly drained and flushed out using an appropriate proprietary flushing agent. • A suitable inhibitor must then be added to the system. • All system additives (flushing agents, cleansers, inhibitors etc.) must comply with the requirements of BS7593. Full instructions are supplied with the products and for further information contact the additive manufacturer directly or consult their website. Failure to flush and add inhibitor to the system will invalidate the appliance warranty. • It is important to check the inhibitor concentration after installation, system modification and at every service in accordance with the inhibitor manufacturer. (Test kits are available from inhibitor stockists.) • For information or advice regarding any of the above contact Baxi Customer Support 0344 871 1545. 6.3 Bypass 1. The boiler is fitted with an automatic integral bypass. Some systems may require an additional external bypass. 6.4 System Control 1. Further external controls (e.g. room thermostat sensors) MUST be fitted to optimise the economical operation of the boiler in accordance with Part L of the Building Regulations (2010). A range of optional controls are available. Full details are contained in the relevant Sales Literature.
Сторінка 13 PDF
Сторінка 14
14 6.0 System Details © Baxi Heating UK Ltd 2017 Fig. 4 Fig. 6 Stop Valve Double Check Valve DHW Mains Inlet CH Return Temporary Loop Stop Valve Fig. 5 Control Box removed for clarity Filling Loop Connections 6.5 System Filling and Pressurising 1. A filling point connection on the central heating return pipework must be provided to facilitate initial filling and pressurising and also any subsequent water loss replacement/refilling. 2. A filling loop that connects to the primary return & cold mains inlet valves is available as an accessory. Follow the instructions provided with it. 3. The filling method adopted must be in accordance with all relevant water supply regulations and use approved equipment. 4. Your attention is drawn to: for GB: Guidance G24.2 and recommendation R24.2 of the Water Regulations Guide. for IE: the current edition of I.S. 813 “Domestic Gas Installations”. 5. The sealed primary circuits may be filled or replenished by means of a temporary connection between the circuit and a supply pipe, provided a ‘Listed’ double check valve or some other no less effective backflow prevention device is permanently connected at the inlet to the circuit and the temporary connection is removed after use. 6.6 Expansion Vessel (Central Heating only) 1. The appliance expansion vessel is pre-charged to 1 bar. Therefore, the minimum cold fill pressure is 1 bar. The vessel is suitable for correct operation for system capacities up to 100 litres. For greater system capacities an additional expansion vessel must be fitted. For GB refer to BS 7074 Pt 1. For IE, the current edition of I.S. 813 “Domestic Gas Installations”. 6.7 Safety Pressure Relief Valve (Fig. 6) 1. The pressure relief valve is set at 3 bar, therefore all pipework, fittings, etc. should be suitable for pressures in excess of 3 bar and temperature in excess of 100°C. 2. The pressure relief discharge pipe should be not less than 15mm dia, run continuously downward, and discharge outside the building, preferably over a drain. It should be routed in such a manner that no hazard occurs to occupants or causes damage to wiring or electrical components. If it is anticipated that any part of the pipe may be subject to freezing it should be suitably insulated. The end of the pipe should terminate facing down and towards the wall (Fig. 6a). 3. The discharge must not be above a window, entrance or other public access. Consideration must be given to the possibility that boiling water/steam could discharge from the pipe. 4. A remote relief valve kit is available to enable the boiler to be installed in cellars or similar locations below outside ground level (kit no. 5121379). 5. A boiler discharge pump is available, part no. 720648301. This pump will dispose of both condensate & high temperature water from the relief valve. It has a maximum head of 5 metres. Pressure Relief Valve Discharge Pipe Fig. 6a The end of the pipe should terminate facing down and towards the wall
Сторінка 14 PDF
Сторінка 15
15 6.0 System Details © Baxi Heating UK Ltd 2017 Fig. 7 Boiler Other Tap Outlets Expansion Vessel* To Hot Taps Check Valve* Pressure Reducer Valve* Stop Tap *See 6.8 for instances when these items may be required IMPORTANT: Where Low Flow Taps or Fittings are intended to be used in the DHW system connected to a Baxi 124/128 Combi it is strongly recommended that the DHW flow rate DOES NOT fall below 2.5l/min. This will ensure reliable operation of the DHW function. 6.8 Domestic Hot Water Circuit (Fig. 7) 1. All DHW circuits, connections, fittings, etc. should be fully in accordance with relevant standards and water supply regulations. 2. Your attention is drawn to: for GB: Guidance G17 to G24 and recommendation R17 to R24 of the Water Regulations Guide. for IE: the current edition of I.S. 813 “Domestic Gas Installations”. 3. The Water Regulations recommendations for England and Wales prohibits backflow from appliances into the wholesome water supply due to thermal expansion. However this type of instantaneous combination boiler, with less than 15 litres of stored capacity, does not require any backflow prevention device as any thermal expansion is accommodated within the appliance. It is possible in certain circumstances that other cold water demands (e.g. washing machines, flushing of W.C.s) may affect the DHW function of the boiler. In these instances the fitting of a backflow prevention device and expansion vessel is recommended. 4. In instances where the mains water supply incorporates a non- return backflow prevention device, or any other device that includes one*, it is possible for a build-up of pressure to occur. This may result in damage to the boiler and other appliances. To prevent damage to the boiler it is strongly recommended that a suitable mini expansion vessel is fitted on the mains water inlet between the boiler and the non-return device. *(The manufacturer of the device should be consulted if there is any doubt regarding the presence of a non-return feature). Even in circumstances where a non-return device is not fitted any future modifications to the mains inlet (e.g. fitting of a water meter) should be considered and an expansion vessel fitted. Baxi cannot accept any responsibility for damage to the boiler if these recommendations are not followed. 5. The boiler’s maximum working mains pressure is 8 bar, therefore all pipework, connections, fittings, etc. should be suitable for pressures in excess of 8 bar. A pressure reducing valve must be fitted for pressures in excess of 8 bar. The manufacturer of any outlet fittings, such as a shower valve, may require a lower maximum pressure. The pressure reduction must take account of all fittings connected to the DHW system. 6.9 Showers 1. If a shower control is supplied from the appliance it should be of the thermostatic or pressure balanced type. Thermostatic type shower valves provide the best comfort and guard against water at too high a temperature. Existing controls may not be suitable - refer to the shower valve manufacturer. 6.10 Hard Water Areas 1. Only water that has NOT been artificially softened must used when filling or re-pressurising the primary system. If the mains cold water to the property is fitted with an artificial softening/treatment device the source use to fill or re-pressurise the system must be upstream of such a device.
Сторінка 15 PDF
Сторінка 16
16 7.0 Site Requirements © Baxi Heating UK Ltd 2017 7.1 Location 1. The boiler may be fitted to any suitable wall with the flue passing through an outside wall or roof and discharging to atmosphere in a position permitting satisfactory removal of combustion products and providing an adequate air supply. The boiler should be fitted within the building unless otherwise protected by a suitable enclosure i.e. garage or outhouse. (The boiler may be fitted inside a cupboard-see Section 7.3). 2. Where the boiler is sited in an unheated enclosure and during periods when the heating system is to be unused it is recommended that the permanent live is left on to give BOILER frost protection. NOTE: THIS WILL NOT PROTECT THE SYSTEM ! 3. If the boiler is fitted in a room containing a bath or shower reference must be made to the relevant requirements. In GB this is the current I.E.E. Wiring Regulations and Building Regulations. In IE reference should be made to the current edition of I.S. 813 “Domestic Gas Installations” and the current ETCI rules. 4. If the boiler is to be fitted into a building of timber frame construction then reference must be made to the current edition of Institute of Gas Engineers Publication IGE/UP/7 (Gas Installations in Timber Framed Housing). 7.2 Clearances (Figs. 8 & 9) 1. A flat vertical area is required for the installation of the boiler. 2. These dimensions include the necessary clearances around the boiler for case removal, spanner access and air movement. Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler. *This is MINIMUM recommended dimension. Greater clearance will aid installation and maintenance. 7.3 Ventilation of Compartments 1. Where the appliance is installed in a cupboard or compartment, no air vents are required. 2. BS 5440: Part 2 refers to room sealed appliances installed in compartments. The appliance will run sufficiently cool without ventilation. 170mm* Min 700mm 390mm 175mm Min (300mm Min if using 80/125mm flueing system) 5mm Min 5mm Min 450mm Min For Servicing Purposes Fig. 8 Fig. 9 In Operation 5mm Min At least 1.5° 300mm (290mm with flap removed)
Сторінка 16 PDF
Сторінка 17
17 7.0 Site Requirement © Baxi Heating UK Ltd 2017 Fig. 10 Gas Service Cock 7.4 Gas Supply 1. The gas installation should be in accordance with the relevant standards. In GB this is BS 6891 (NG) or BS 5482 Pt. 1 (LPG). In IE this is the current edition of I.S. 813 “Domestic Gas Installations”. 2. The connection to the appliance is a 22mm copper tail located at the rear of the gas service cock (Fig. 10). 3. Ensure that the pipework from the meter to the appliance is of adequate size, and the demands of any other gas appliances in the property are taken into consideration. Do not use pipes of a smaller diameter than the boiler gas connection (22mm) UNLESS the stated gas rate can be achieved with pipe of lesser diameter and with all other gas appliances operating at maximum rate. 7.5 Electrical Supply 1. External wiring must be correctly earthed, polarised and in accordance with relevant regulations/rules. In GB this is the current I.E.E. Wiring Regulations. In IE reference should be made to the current edition of ETCI rules. 2. The mains supply is 230V ~ 50Hz fused at 3A. Note: The method of connection to the electricity supply must facilitate complete electrical isolation of the appliance. Connection may be via a fused double-pole isolator with a contact separation of at least 3mm in all poles and servicing the boiler and system controls only. 7.6 Bath & Shower Rooms 1. Boilers fitted with optional plug-in integral timer, RFQ receiver or thermostat CANNOT be fitted in any zone. 2. If the boiler is fitted in a room containing a bath or shower and NOT FITTED with any optional integral timer or thermostat, it can be fitted in zone 2, (Figs. A & B shows zone dimensions for a bathtub. For other examples refer to the Current I.E.E. Wiring Regulations) reference must be made to the relevant requirements. In GB this is the current I.E.E. Wiring Regulations and Building Regulations. In IE reference should be made to the current edition of I.S. 813 “Domestic Gas Installations” and the current ETCI rules. Zone 2 Zone 1 Zone 0 Zone 2 Zone 2 Window Recess Window Recess 0.6 m Ceiling Outside Zones Zone 2 Zone 1 Zone 0 2.25 m Window Recess Zone 2 0.6 m Fig. A Fig. B In GB Only In GB Only
Сторінка 17 PDF
Сторінка 18
18 7.0 Site Requirements © Baxi Heating UK Ltd 2017 7.7 Condensate Drain FAILURE TO INSTALL THE CONDENSATE DISCHARGE PIPEWORK CORRECTLY WILL AFFECT THE RELIABLE OPERATION OF THE BOILER. CAREFUL CONSIDERATION MUST BE GIVEN TO THE POSSIBILITY OF THE PIPEWORK BEING SUBJECT TO FREEZING CONDITIONS AND APPROPRIATE MEASURES TAKEN TO PREVENT BLOCKAGE. CORRECT INSTALLATION IN ACCORDANCE WITH THIS SECTION WILL CONSIDERABLY MINIMISE THE LIKELIHOOD OF BLOCKAGE AND SUBSEQUENT BOILER LOCK-OUT. A CONDENSATE DISCHARGE PUMP AND PIPE ‘TRACE HEATING’ ARE AVAILABLE AS ACCESSORIES - see paragraphs 7.7.12 to 7.715 for further details. The condensate discharge pipe MUST NOT RISE at any point along its length. There MUST be a fall of AT LEAST 2.5° (50mm per metre) along the entire run EXCEPT when employing a suitable condensate pump in basement and cellar or similar applications. The boiler condensate trap incorporates a seal of 75mm, therefore it is unnecessary to install an air break and trap in the discharge pipework. 1. The condensate outlet will accept 21.5mm (3/4in) plastic overflow pipe. It is strongly recommended that this discharges internally into the household drainage system. Where this is not possible, discharge into an outside drain is permissible providing every possible precaution is taken to prevent freezing. 2. Ensure the discharge of condensate complies with any national or local regulations in force. BS 6798 & Part H1 of the Building Regulations give further detailed guidance. 3. The discharge pipe should be run in a proprietary drain pipe material e.g. PVC, PVC-U, ABS, PVC-C or PP. 4. Metal pipework is NOT suitable for use in condensate discharge systems. 5. The pipe should be a minimum of 21.5mm diameter and must be supported using suitably spaced clips of the correct design to prevent sagging. 6. It is advisable that the full length of condensate pipe is run internally and preferably be less than 3 metres. 7. Internal runs greater than 3 metres or runs in cold areas should use 32mm waste pipe. 8. External runs MUST be a MINIMUM of 32mm and fully insulated with material suitable for external use. 9. If the boiler is fitted in an unheated location the entire condensate discharge pipe should be treated as an external run and sized and insulated accordingly. 10. In all cases discharge pipe must be installed to aid disposal of the condensate. To reduce the risk of condensate being trapped, as few bends and fittings as possible should be used and any burrs on cut pipe removed. 11. When discharging condensate into a soil stack or waste pipe the effects of existing plumbing must be considered. If soil pipes or waste pipes are subjected to internal pressure fluctuations when WC's are flushed or sinks emptied then back-pressure may force water out of the boiler trap and cause appliance lockout. 21.5mm 2.5° Minimum fall i) Termination to an internal soil and vent pipe 450mm min* Boiler 2.5° Minimum fall ii) External termination via internal discharge branch e.g sink waste - downstream* Sink Pipe must terminate above water level but below surrounding surface. Cut end at 45° 50mm per metre of pipe run 50mm per metre of pipe run *450mm is applicable to properties up to 3 storeys. For multi-storey building installations consult BS 6798. Examples are shown of the following methods of termination:- i) to an internal soil & vent pipe ii) via an internal discharge branch (e.g. sink waste) downstream of the trap iii) to a drain or gully iv) to a purpose made soakaway v) pumped into an internal discharge branch (e.g. sink waste) downstream of the trap vi) pumped into an external soil & vent pipe vii) to a drain or gully with extended external run & trace heating It is strongly recommended to discharge internally into the household drainage system. If connecting to a rain water drain, that drain MUST discharge into a foul drain. *It is NOT RECOMMENDED to connect upstream of the sink or other waste water receptacle ! 32mm Insulation Boiler 2.5° Minimum fall iii) Termination to a drain or gully 50mm per metre of pipe run Pipe must terminate above water level but below surrounding surface. Cut end at 45° Boiler 500mm min 2.5° Minimum fall iv) Termination to a purpose made soakaway Holes in the soak-away must face away from the building 50mm per metre of pipe run Further specific requirements for soakaway design are referred to in BS 6798. Boiler
Сторінка 18 PDF
Сторінка 19
19 7.0 Site Requirements © Baxi Heating UK Ltd 2017 7.7 Condensate Drain (cont.) 12. A boiler discharge pump is available, ‘MULTIFIT’ part no. 720648301. This pump will dispose of both condensate & high temperature water from the relief valve. It has a maximum head of 5 metres. Follow the instructions supplied with the pump. 13. Condensate Drain Pipe ‘Trace Heating’ Elements are available in various lengths. ‘MULTIFIT’ part nos.:- 1 metre 720644401 2 metre 720664101 3 metre 720664201 5 metre 720664401* *Where the drain is between 3 & 5 metres a 5 metre kit can be used and “doubled back” upon itself. 14. It is possible to fit the element externally on the condensate drain or internally as detailed in the instructions provided. 15. The fitting of a ‘Trace Heating’ Element is NOT a substitute for correct installation of the condensate drain. ALL requirements in this section must still be adhered to. Boiler vi) pumped into an external soil & vent pipe 2.5° Minimum fall 50mm per metre of pipe run Condensate Pump Unheated Location (e.g. Garage) Basement or similar (heated) Boiler 2.5° Minimum fall 50mm per metre of pipe run Pipe must terminate above water level but below surrounding surface. Cut end at 45° The ‘Trace Heating’ element must be installed in accordance with the instructions supplied. External runs & those in unheated locations still require insulation. vii) to a drain or gully with extended external run & trace heating Boiler v) pumped into an internal discharge branch (e.g. sink waste) downstream of the trap Pipe must terminate above water level but below surrounding surface. Cut end at 45° 2.5° Minimum fall 50mm per metre of pipe run Condensate Pump Sink Basement or similar (heated)
Сторінка 19 PDF
Сторінка 20
20 7.0 Site Requirements © Baxi Heating UK Ltd 2017 7.8 Flue NOTE: Due to the nature of the boiler a plume of water vapour will be discharged from the flue. This should be taken into account when siting the flue terminal. 1. The following guidelines indicate the general requirements for siting balanced flue terminals. For GB recommendations are given in BS 5440 Pt 1. For IE recommendations are given in the current edition of I.S. 813 “Domestic Gas Installations”. 2. If the terminal discharges onto a pathway or passageway, check that combustion products will not cause a nuisance and that the terminal will not obstruct the passageway. 3. If a terminal is less than 2 metres above a balcony, above ground or above a flat roof to which people have access, then a suitable terminal guard must be provided. IMPORTANT: • Under car ports we recommend the use of the plume displacement kit. • The terminal position must ensure the safe and nuisance - free dispersal of combustion products. *4. Reduction to the boundary is possible down to 25mm by using the available flue deflector. N I I G F M I A A F H J,K D E H Likely flue positions requiring a flue terminal guard C R A I J,K I L S B T U Fig. 12 Fig. 11 300 min Terminal Assembly Top View Rear Flue Property Boundary Line NOTE: The distance from a fanned draught appliance terminal installed parallel to a boundary may not be less than 300mm in accordance with the diagram below Opening Window or Door 150mm MIN. IMPORTANT: If fitting a Plume Displacement Flue Kit, the air inlet must be a minimum of 150mm from any opening windows or doors (see Fig. 13). Plume Displacement Kit Air Inlet Fig. 13 Terminal Position with Minimum Distance (Fig. 12) (mm) A1 Directly below an opening, air brick, opening windows, etc. 300 B1 Above an opening, air brick, opening window etc. 300 C1 Horizontally to an opening, air brick, opening window etc. 300 D2 Below gutters, soil pipes or drain pipes. 25 (75) E2 Below eaves. 25 (200) F2 Below balconies or car port roof. 25 (200) G2 From a vertical drain pipe or soil pipe. 25 (150) H2 From an internal or external corner. 25 (300) I Above ground, roof or balcony level. 300 J From a surface or boundary line facing a terminal. 600 K From a terminal facing a terminal (Horizontal flue). 1200 From a terminal facing a terminal (Vertical flue). 600 L From an opening in carport (e.g. door, window) into the dwelling. 1200 M Vertically from a terminal on the same wall. 1500 N Horizontally from a terminal on the same wall. 300 R From adjacent wall to flue (vertical only). 300 S From an adjacent opening window (vertical only). 1000 T Adjacent to windows or openings on pitched and flat roofs 600 U Below windows or openings on pitched roofs 2000 1 In addition, the terminal should be no nearer than 150 mm to an opening in the building fabric formed for the purpose of accommodating a built-in element such as a window frame. 2 Only ONE 25mm clearance is allowed per installation. If one of the dimensions D, E, F, G or H is 25mm then the remainder MUST be as shown in brackets, in accordance with B.S.5440-1. *
Сторінка 20 PDF
Сторінка 21
21 8.0 Flue Options © Baxi Heating UK Ltd 2017 Horizontal Flues (ii) (i) Plume Displacement Kit 60 /100 dia 1M Extensions 45° & 93° elbows are also available - see the separate Flue Guide. NOTE: Horizontal flue pipes should always be installed with a fall of at least 1.5° from the terminal to allow condensate to run back to the boiler. (ii) (i) This bend is equivalent to 1 metre Total equivalent length = A+B+C+2 x 90° Bends B A C This bend is equivalent to 1 metre 8.1 Horizontal Flue Systems 1. The standard flue is suitable only for horizontal termination applications. 2. All fittings should be fully engaged. The approximate engagement is 40mm. Apply the lubricant supplied to the seal on each fitting to aid assembly. 3. Maximum permissible equivalent flue lengths are:- (60/100) (80/125) Horizontal Concentric 10 metres 20 metres 4. Any additional “in line” bends in the flue system must be taken into consideration. Their equivalent lengths are:- Concentric Pipes: 135° bend 0.5 metres 93° bend 1.0 metres 5. The elbow supplied with the standard horizontal telescopic flue kit is not included in any equivalent length calculations. NOTE: Flue length is measured from point (i) to (ii) as shown. IMPORTANT SUPPORT - All flue systems MUST be securely supported a MINIMUM of once every metre. It is recommended that every straight piece is supported irrespective of length. Additional supports are available as accessories. VOIDS - Consideration must be given to flue systems in voids and the provision of adequate access for subsequent periodic visual inspection. 6. Read this section in conjunction with the Flue Installation Guide supplied with the boiler.
Сторінка 21 PDF
Сторінка 22
22 8.0 Flue Options © Baxi Heating UK Ltd 2017 8.2 Flue Lengths The standard horizontal telescopic flue kit allows for lengths between 315mm and 500mm from elbow to terminal without the need for cutting (Fig. 14). Extensions of 250mm, 500mm & 1m are available. The maximum permissible equivalent flue length is: 10 metres (60/100 system - vertical & horizontal) 20 metres (80/125 system - vertical & horizontal) 8 metres (60/100 system - vertical connected to ridge terminal) For details of Plume Displacement Kit lengths see the Flue Installation Guide supplied in the literature pack. 8.3 Flue Trim 1. The flexible flue trims supplied can be fitted on the outer and inner faces of the wall of installation. 8.4 Terminal Guard (Fig. 15) 1. When codes of practice dictate the use of terminal guards, ‘Multifit’ accessory part no. 720627901 can be used (Note: This is not compatible with Flue Deflector referred to below). 2. If a proprietary guard is used it must be identified as suitable for use with condensing boilers 3. There must be a clearance of at least 50mm between any part of the terminal and the guard. 4. The flue terminal guard should be positioned centrally over the terminal and fixed as illustrated. 8.5 Flue Deflector (Fig. 16) 1. Push the flue deflector over the terminal end. It may point upwards as shown, or up to 45° either way from vertical. Secure the deflector to the terminal with screws provided. 8.6 Flue Accessories 1. For full details of Flue Accessories (elbows, extensions, clamps etc.) refer to the Flue Installation Guide supplied in the literature pack. Fig. 14 Fig. 15 315mm 500mm Fig. 16 Flue Deflector Ensure that no part of the white outer chimney duct is visible
Сторінка 22 PDF
Сторінка 23
23 9.0 Installation © Baxi Heating UK Ltd 2016 9.1 Unpacking & Initial Preparation IMPORTANT RISK ASSESSMENT - Before commencing the installation it is recommended that the ‘Five Steps to Risk Assessment’ document published by the HSE is consulted, and an assessment performed as described. GAS SUPPLY - The gas supply, gas type and pressure must be checked for suitability before connection (see Section 7.4). 1. Remove the banding and the cardboard sleeve. Remove the polystyrene top piece and installation kit (Fig. 17). 2. After considering the site requirements (see Section 7.0) position the fixing template (Fig. 19) on the wall ensuring it is level both horizontally and vertically. 3. Mark the position of the two most suitable fixing slots for the wall plate. 4. Mark the position of the centre of the flue hole (rear exit). For side flue exit, mark as shown (Fig. 18). 5. If required, mark the position of the gas and water pipes. Remove the template. 6. Cut the hole for the flue (minimum diameter 116mm). 7. Drill the wall as previously marked to accept the wall plugs supplied. Secure the wall plate using the fixing screws. 8. Using a spirit level ensure that the plate is level (Fig. 19a) before finally tightening the screws. 9.2 Flushing 1. Ensure that the system is thoroughly flushed and treated in accordance with guidance given in Section 6.2 & BS 7593. 9.3 Fitting The Boiler 1. Remove the sealing caps from the boiler connections. NOTE: A small amount of water may drain from the boiler once the caps are removed. 2. Lift the boiler using the lower polystyrene. The boiler should be lifted by TWO PEOPLE. Engage the mounting bracket at the top rear of the boiler on the wall plate (Fig. 20) (see Safe Manual Handling page 5). 3. Identify the valves prior to fitting to the boiler (Fig. 21). 4. Insert the sealing washers between the valves, boiler connections and copper tails. 5. Tighten all the connections. Fig. 21 130mm For Side Flue Exit Fig. 18 Fig. 19 Fig. 17 Pressure Relief Valve (15mm) Condensate Drain Part No. 7659616-01 (4/16) 5 mm Minimum Side Clearance 5 mm Minimum Side Clearance 116mm Dia Minimum Aperture For Flue Tube Side Flue Centre Line Vertical Flue Centre Line 175 mm Minimum Clearance Profile of Outercase 228 mm 170mm Minimum Clearance Boiler Wall Mounting Plate Fixing Slots 38.5mm 26.5 mm 65mm 65mm 65mm 65mm 65mm Ø 8 mm 50 mm 162.5 mm (PRV) Hot Water Outlet (15mm) Combi Only Not System Cold Water Inlet (15mm) Heating Return (22mm) Heating Flow (22mm) Gas Inlet (22mm) Combi Only Not System Part No. 7659616 200mm Recommended SNAP OFF Fig. 19a Fig. 20 Remove Sealing Caps from under the Boiler before lifting into position Sealing Washers Heating Flow Heating Return DHW Outlet Cold Water Inlet Gas LIFT HERE BOTH SIDES
Сторінка 23 PDF
Сторінка 24
24 9.0 Installation © Baxi Heating UK Ltd 2017 Fig. 22 Pressure Relief Valve Discharge Pipe Control Box removed for clarity 9.4 Fitting the Pressure Relief Discharge Pipe (Fig. 22) 1. Remove the discharge pipe from the kit. 2. Determine the routing of the discharge pipe in the vicinity of the boiler. Make up as much of the pipework as is practical, including the discharge pipe supplied. IMPORTANT: Make all soldered joints before connecting to the pressure relief valve. The relief valve is intentionally angled to the right of the boiler. DO NOT adjust the position of the valve. The discharge pipe must be installed before pressurising the system. 3. The pipework must be at least 15mm diameter and run continuously downwards to a discharge point outside the building. See section 6.7 for further details. 4. Utilising one of the sealing washers, connect the discharge pipe to the adaptor and tighten the nut hand tight, plus 1/4 turn to seal. 5. Complete the discharge pipework and route it to the outside discharge point. 9.5 Condensate Drain (see section 7.7) (Fig. 23) 1. Using the elbow supplied, connect the condensate drain pipework to the boiler condensate trap outlet pipe. When connecting the elbow, ensure that the condensate sump is not inadvertently unscrewed. Ensure the discharge of condensate complies with any national or local regulations in force (see British Gas “Guidance Notes for the Installation of Domestic Gas Condensing Boilers” & HHIC recommendations). 2. The hose will accept 21.5mm (3/4in) plastic overflow pipe which should generally discharge internally into the household drainage system. If this is not possible, discharge into an outside drain is acceptable. 3. The boiler condensate trap should be primed by pouring approximately 300ml of water into the flue spigot (Fig. 22a). Do not allow any water to fall into the air inlet. Condensate Trap Outlet Pipe Fig. 23 Prime Trap by pouring 300ml of water into flue spigot Fig. 22a
Сторінка 24 PDF
Сторінка 25
25 © Baxi Heating UK Ltd 2017 9.0 Installation 9.6 Fitting The Flue HORIZONTAL TELESCOPIC FLUE 1. There are two telescopic sections, the Terminal Assembly and the Connection Assembly, a roll of sealing tape and two self tapping screws. A 93° elbow is also supplied. 2. The two sections can be adjusted to provide a length between 315mm and 500mm (Fig. 24) when measured from the flue elbow (there is 40mm engagement into the elbow). 3. Locate the flue elbow on the adaptor at the top of the boiler. Set the elbow to the required orientation (Fig. 25). NOTE: The flue elbow is angled at 93 degrees to ensure a fall back to the boiler. 4. Measure the distance from the outside wall face to the elbow. This dimension will be known as ‘X’ (Fig. 25). 5. If the distance from the flue elbow to the outside face of the wall (‘X’ in Fig. 25) is less than 250mm the Connection Assembly can be discarded and the Terminal Assembly fitted directly into the elbow. 6. In instances where the dimension ‘X’ (Fig. 25) is between 250mm and 315mm it will be necessary to shorten the Terminal Assembly by careful cutting to accommodate walls of these thicknesses. 7. To dimension ‘X’ add 40mm. This dimension to be known as ‘Y’. 8. Adjust the two telescopic sections to dimension ‘Y’ and seal the joint with the tape provided (Fig. 27). Ensure that the labels marked ‘TOP’ on the Terminal and Connection Assemblies are uppermost. 9. Using the clearance holes in the Connection Assembly secure it to the Terminal Assembly using the screws supplied (Fig. 28). Wall Thickness (X) Wall Thickness (X) Fig. 24 Fig. 26 315mm 500mm Terminal Assembly Connection Assembly Fig. 25 Fig. 27 ‘Peak’ to be uppermost Dimension ‘Y’ Securing Screw Fig. 28 Sealing Tape ‘TOP’ Label ‘TOP’ Label
Сторінка 25 PDF
Сторінка 26
26 © Baxi Heating UK Ltd 2017 9.0 Installation 9.6 Fitting the Flue (Cont) 10. Remove the flue elbow and insert the flue through the hole in the wall. Fit the flue trims if required, and refit the elbow to the boiler adaptor, ensuring that it is pushed fully in (Fig. 29). 11. Draw the flue back through the wall and engage it in the elbow. It may be necessary to lubricate to ease assembly of the elbow and flue (Fig. 30). 12. Ensure that the terminal is positioned with the slots to the bottom (Fig. 31). Secure the flue to the elbow with the screws supplied (Fig. 30). IMPORTANT: It is essential that the flue terminal is fitted as shown to ensure correct boiler operation and prevent water entering the flue. 13. Make good between the wall and air duct outside the building, appropriate to the wall construction and fire rating. 14. If necessary fit a terminal guard (see Section 8.4). Slots at bottom Fig. 30 Fig. 31 Adaptor Apply the lubricant supplied for ease of assembly (do not use any other type). Ensure Elbow is fully engaged into Boiler Adaptor Fig. 29 9.0 Installation Slots at bottom Fig. 30 Fig. 31 Boiler Elbow Adaptor Fig. 29 Apply the lubricant supplied for ease of assembly (do not use any other type). Ensure Flue is fully engaged into Elbow
Сторінка 26 PDF
Сторінка 27
27 9.0 Installation © Baxi Heating UK Ltd 2017 b br b bk g/y 1 N L 2 N N L Room ‘Stat Fused Spur 230V Fig. 36 Fig. 34 b br b bk g/y 1 N L Frost Thermostat External Clock 2 Pipe Thermostat N N L Room ‘Stat Fused Spur 230V 230V Fig. 35 Control Box 9.7 Making The Electrical Connections The boiler must be connected to the mains fused 3A 230V 50HZ supply & control system using cable of 3 core 0.75mm 3183Y multi strand flexible type (see IMPORTANT note opposite). 1. Undo the securing screws and lift the case front panel off. 2. Disengage the securing tab and hinge the control box (Fig. 34) downwards. Undo the terminal block cover securing screw and remove the cover. 3. Slacken the gland nut in the left of the boiler lower panel and pass the mains cable through it. Remove the grommet adjacent to the gland nut, pierce the diaphragm and insert the cable from the external control system. 4. Leave sufficient slack in the cables to allow the Control Box to be hinged fully open. Tighten the gland nut and refit the grommet. 5. Connect the Earth, Permanent Live and Neutral wires to the terminal strip. Note: Both the Permanent Live and Neutral connections are fused. 6. Refer to the instructions supplied with the external control(s). IMPORTANT: Any thermostat MUST be suitable for 230V switching. 7. Remove the link between terminals 1 & 2. The 230V supply at terminal 2 must be connected to the thermostat. The switched output from the thermostat must be connected to terminal 1. (Figs. 35 & 36). If the room thermostat being used incorporates an anticipator it MUST be wired as shown in Figs. 35 & 36. Note: When only Low Voltage controls are being used (connected to Terminal M2) it is still necessary to remove the link wire ! 8. Replace the terminal block cover. 9. See Section 18.0 for details of fitting the manufacturer supplied Optional Outdoor Sensor and Wired/Wireless Sensors. IMPORTANT: Any proprietary OpenTherm control MUST allow individual adjustment of CH & DHW temperature. 9.8 Preliminary Electrical Checks 1. Prior to commissioning the boiler preliminary electrical system checks should be carried out. 2. These should be performed using a suitable meter, and include checks for Earth Continuity, Resistance to Earth, Short Circuit and Polarity. Note: The 230V switched signal for external controls (Frost Stat - Room Stat - Timer) must always be taken from terminal 2 at the boiler. Live, Neutral and Earth to power these controls must be taken from the Fused Spur. IMPORTANT • Any wiring to the boiler, from either the mains or an external control, MUST be cable of the following specification:- 0.75mm 3183Y multi strand flexible cable conforming to BS 50525-2-11. • Cable of the above specification is sufficiently flexible to withstand normal regular opening and closing of the facia/control box as expected during routine servicing and other maintenance work. • Use ONLY cable glands supplied with the boiler, or provided as spares by the manufacturer. • Under no circumstances must solid core cable be used as it is not intended for applications where movement may occur. The use of solid core cable could result in situations potentially hazardous to health. • These points must be considered when initially wiring the boiler to the installation, and if replacing any wiring during the service life of the boiler.
Сторінка 27 PDF
Сторінка 28
28 11.0 Commissioning © Baxi Heating UK Ltd 2017 10.0 Commissioning Automatic Air Vent Cap Fig. 37 Pump bar 0 1 2 3 4 Control Box removed for clarity Fig. 38 Fig. 39 IMPORTANT: The combustion for this appliance has been checked, adjusted and preset at the factory for operation on the gas type specified on the appliance data plate. Do not adjust the air/gas ratio valve. During the Gas Type Check Function the combustion ratio will increase for a short time while the gas type is established. 10.1 Commissioning the Boiler 1. Reference should be made to BS:EN 12828, 12831 & 14336 when commissioning the boiler. Ensure that the trap has been primed - see Section 9.5 paragraph 3. 2. At the time of commissioning, complete all relevant sections of the Benchmark Checklist at the rear of this publication. 3. Open the mains water supply to the boiler and all hot water taps to purge the DHW system. 4. Ensure that the filling loop is connected and open, then open the heating flow and return valves on the boiler. Ensure that the cap on the automatic air vent on the pump body is opened (Fig. 37). 5. The system must be flushed in accordance with BS 7593 (see Section 6.2) and the flushing agent manufacturers instructions. 6. Pressurise the system to 1.5 bar (Fig. 38) then close and disconnect the filling loop. 7. Test for gas tightness, turn the gas supply on and purge according to in GB BS 6891 and in IE I.S. 813 "Domestic Gas Installations". De-Aeration Function 8. When power is supplied to the boiler for the first time the software pressure will be displayed. followed by . However if is shown, press for 2 to 4 seconds . will now be displayed. 9. Press & together and hold for at least 6 seconds. The ‘De-Aeration’ Function will be activated and ‘On’ displayed. 10. The boiler pump will run for up to 10 minutes during which time the diverter valve will switch between heating & hot water. This will purge air from the system. The display will show . Gas Type Check 11. Once de-aeration is complete the boiler will go automatically to first fire-up and run at the Ignition Phase fan speed for 3 or 4 minutes to check the gas type (N.G. or Propane L.P.G.). The boiler software checks the combustion value against the set value. will be displayed, alternating with a figure representing the Ignition Phase speed, e.g. ‘33’ or ‘43’ (Note: Each boiler model will display a different figure). 12. The boiler is factory set for Natural Gas. On a Natural Gas Supply will be displayed and the boiler is ready for the Inlet Pressure & Gas Rate to be checked (Section 10.2). 13. IMPORTANT: In cases where the supplied gas is Propane gas will be displayed. Press for at least 6 seconds to confirm that this is the intended gas type for the installation. 14. IF THE BOILER IS TO BE OPERATED ON PROPANE A SUITABLE PERMANENT MARKER PEN MUST BE USED TO ALTER THE ‘GAS SETTING INFORMATION’ LABEL ADJACENT TO THE DATA LABEL ! 15. Having checked: • That the boiler has been installed in accordance with these instructions. • The integrity of the flue system and the flue seals. • The integrity of the boiler combustion circuit and the relevant seals. Proceed to put the boiler into operation as follows: Display showing Gas Type Recognition R Heating Pressure Gauge FUNCTION INTERRUPTION If either De-aeration or Gas Check is interrupted by a fault e.g. low water pressure (E118) or air in the gas supply (E128 or E133) the fault must be rectified and the function reactivated. During De-aeration, if water pressure is lost, repressurising to 1.0 bar will allow the function to continue. Whilst the Gas Type Check is being performed if water pressure is lost the function can be reactivated by repressurising then pressing & together and holding for at least 6 seconds. If a gas supply fault occurs must be pressed before & . R
Сторінка 28 PDF
Сторінка 29
29 10.0 Commissioning © Baxi Heating UK Ltd 2017 Set Boiler to Maximum Rate (see 10.3.1) Allow the combustion to stabilise. Do not insert probe to avoid ‘flooding’ the analyser. Perform Flue Integrity Combustion Check Insert the analyser probe into the air inlet test point, allowing the reading to stabilise. Is O2 ≥ 20.6% and CO2 < 0.2% ? Verify Flue Integrity Indication that products of combustion & inlet air are mixing - further investigation is required. Check all flue components are correctly assembled, fixed & supported. Check the flue & terminal are unobstructed. Is O2 ≥ 20.6% and CO2 < 0.2% ? TURN APPLIANCE OFF ! Call 0344 871 1545 for advice. The appliance MUST NOT be commissioned until all problems are identified and resolved. Check CO & Combustion Ratio at Maximum Rate Whilst the boiler is still operating at maximum insert the analyser probe into the flue gas test point, allowing the reading to stabilise. Is CO < 350ppm and CO/CO2 ratio < 0.004 ? Verify Integrity of Seals Check all burner seals, internal flue seals, door & case seals. Replace any seals that appear unsound. Is CO < 350ppm and CO/CO2 ratio < 0.004 ? TURN APPLIANCE OFF ! Call 0344 871 1545 for advice. The appliance MUST NOT be commissioned until all problems are identified and resolved. If commissioning cannot be fully completed the appliance must be disconnected from the gas supply in accordance with the GSIUR. Note: Check & record the CO & combustion ratio at both maximum & minimum rates before calling 0344 871 1545. Set Boiler to Minimum Rate Allow the combustion to stabilise. Do not insert probe to avoid ‘flooding’ the analyser. Yes No No Yes No Yes Check CO & Combustion Ratio at Minimum Rate Whilst the boiler is operating at minimum insert the analyser probe into the flue gas test point, allowing the reading to stabilise. Yes No Is CO < 350ppm and CO/CO2 ratio < 0.004 ? No Yes BOILER OPERATING SATISFACTORILY. NO FURTHER ACTION REQUIRED Ensure test points are capped, the boiler case front panel is correctly fitted & secured and all other commissioning procedures completed. Complete the ‘Benchmark’ Checklist, recording the CO & combustion ratio readings as required. 10.2 Checking the Combustion - ‘Chimney Sweep’ Function (cont) 1. Follow the flow chart opposite.
Сторінка 29 PDF
Сторінка 30
30 10.0 Commissioning © Baxi Heating UK Ltd 2017 Fig. 40 Fig. 41 Inlet Gas Pressure Test Point DO NOT check gas pressure here 10.3 Check the Operational (Working) Gas Inlet Pressure & Gas Rate Note: The system MUST be cold to ensure the boiler is operating under full demand. To obtain an accurate measurement on smaller capacity systems it may be necessary to open one or more hot taps in order to maintain the boiler at full rate 1. Press & together and hold for at least 6 seconds. ‘On’ will be displayed briefly, followed by ‘304’ then ‘100’ when the boiler is lit, indicating the CH output is at MAXIMUM (‘Chimney Sweep Function’). 2. With the boiler operating in the maximum rate condition check that the operational (working) gas pressure at the inlet gas pressure test point on the gas cock or valve is in accordance with B.S. 6798 & B.S. 6891. This must be AT LEAST 17mb ! (LPG - 37mb) 3. Ensure that this inlet pressure can be obtained with all other gas appliances in the property working. Measure the Gas Rate 4. With any other appliances & pilot lights turned OFF the gas rate can be measured. It should be:- Natural Gas 24 model 2.61 m3/h 28 model 3.05 m3/h Propane 24 model 1.94 kg/h 28 model 2.29 kg/h 5. Press & together and hold for at least 6 seconds to exit the function. 6. Carefully read and complete all sections of the Benchmark Commissioning Checklist at the rear of this publication that are relevant to the boiler and installation. These details will be required in the event of any warranty work. The publication must be handed to the user for safe keeping and each subsequent regular service visit recorded. 7. For IE, it is necessary to complete a “Declaration of Conformity” to indicate compliance with I.S. 813. An example of this is given in I.S. 813 “Domestic Gas Installations”. This is in addition to the Benchmark Commissioning Checklist. 1. It may be necessary to adjust the boiler gas type if the supply is changed, for example when Natural Gas is provided to a rural area previously reliant on Propane. In these instances a replacement Gas Type Label may be required, which is available on request as a spare part. 2. Press & and hold for at least 6 seconds. will be displayed, alternating with . 3. Press to select the next parameter . Press . 4. Press or to select the value that corresponds with the required gas type. For Natural Gas:- For Propane:- 5. Press to save the change, then to return to the normal display. R Changing the Gas Type N.G. Factory Set When reset for L.P.G. Gas Type Label Working Gas Pressures If the pressure drops are greater than shown a problem with the pipework or connections is indicated. Permissible pressure drop across this system ≤ 1 mbar. Gas Cock Gas Valve Gas Meter 19-23 mbar 17-21 mbar 18-22 mbar
Сторінка 30 PDF
Сторінка 31
31 11.0 Completion & System Draining © Baxi Heating UK Ltd 2017 Fig. 42 Facia Panel Case Front Panel 11.1 Completion 1. Replace the case front panel, and secure with the screws previously removed. 2. This publication must be handed to the user for safe keeping and each subsequent regular service visit recorded. 3. Set the central heating and hot water temperatures to the requirements of the user. Instruct the user in the operation of the boiler and system. 4. Instruct the user in the operation of the boiler controls. Hand over the User Guide & Installation and Service Manual, giving advice on the necessity of regular servicing. 5. Demonstrate to the user the action required if a gas leak occurs or is suspected. Show them how to turn off the gas supply at the meter control, and advise them not to operate electric light or power switched, and to ventilate the property. 6. Show the user the location of the system control isolation switch, and demonstrate its operation. 7. Advise the user that they may observe a plume of vapour from the flue terminal, and that it is part of the normal operation of the boiler. 11.2 System Draining 1. If at any time after installation it is necessary to drain the central heating system (e.g. after replacing a radiator) the De-Aeration Function should be activated. 2. On refilling the system ensure that there is no heating or hot water demand, but that there is power to the boiler. 3. Press & together and hold for at least 6 seconds. The ‘De-Aeration’ Function will be activated. 4. The boiler pump will run for up to 10 minutes during which time the diverter valve will switch between heating & hot water. This will purge air from the system. The display will show . 5. Once De-Aeration is complete set the external controls as required by the user. The button can be pressed so that the display shows the following information:- 1 press - ‘00’ alternates with Sub-Code (only when fault on boiler) or ‘000’ 2 presses - ‘01’ alternates with CH Flow Temperature 3 presses - ‘02’ alternates with Outside Temperature (where Sensor fitted) 4 presses - ‘03’ alternates with DHW Temperature 5 presses - ‘04’ alternates with DHW Temperature 6 presses - ‘05’ alternates with System Water Pressure 7 presses - ‘06’ alternates with CH Return Temperature 8 presses - ‘07’ alternates with Flue Temperature 9 presses - ‘08’ alternates with Heat Exchanger Temperature To change the information displayed see the table below:-
Сторінка 31 PDF
Сторінка 32
32 12.0 Servicing © Baxi Heating UK Ltd 2017 12.1 Performance Safety Check & Annual Servicing 1. For reasons of safety and economy, it is recommended that the boiler is serviced annually. Servicing must be performed by a competent person in accordance with B.S. 7967-4. 2. After servicing, complete the relevant Service Interval Record section of the Benchmark Commissioning Checklist at the rear of this publication. IMPORTANT: During routine servicing, and after any maintenance or change of part of the combustion circuit, the following must be checked:- • The integrity of the complete flue system and the flue seals (check air inlet sample). • The integrity of the boiler combustion circuit and relevant seals as described in Section 12.2. • The operational gas inlet pressure as described in Section 10.3.1 to 10.3.7 and the gas rate as described in 10.3.4. • The combustion performance as described in ‘Check the Combustion Performance’ (12.1.4 to 12.1.6 below). 3. Competence to carry out Checking Combustion Performance B.S. 6798 ‘Specification for Installation & Maintenance of Gas Fired Boilers not exceeding 70kW’ advises that:- • The person carrying out a combustion measurement should have been assessed as competent in the use of a flue gas analyser and the interpretation of the results. • The flue gas analyser used should be one meeting the requirements of BS7927 or BS-EN50379-3 and be calibrated in accordance with the analyser manufacturers’ requirements. • Competence can be demonstrated by satisfactory completion of the CPA1 ACS assessment, which covers the use of electronic portable combustion gas analysers in accordance with BS 7967, Parts 1 to 4. Check the Combustion Performance (CO/CO2 ratio) 4. Set the boiler to operate at maximum rate as described in Section 14.1.1 to 14.1.6. 5. Remove the plug from the flue sampling point, insert the analyser probe and obtain the CO/CO2 ratio. This must be less than 0.004. 6. If the combustion reading (CO/CO ratio) is greater than this, and the integrity of the complete flue system and combustion circuit seals has been verified, and the inlet gas pressure and gas rate are satisfactory either: • Perform the ‘Annual Servicing - Inspection’ (Section 12.2) & re-check. • Perform the Combustion & Calibration functions (Section 14.0) & re-check. • Replace the gas valve (Section 13.23) & re-check. 12.2 Annual Servicing - Inspection 1. Ensure that the boiler is cool. 2. Ensure that both the gas and electrical supplies to the boiler are isolated. 3. Remove the screws securing the case front panel. Lift the panel slightly to disengage it from the studs on top of the case (Fig. 43) and hinge down the Control Box. 4. Disconnect the condensate drain elbow and unscrew the sump from the bottom of the condensate trap assembly (Fig. 44). Remove any deposits from the sump and trap. Clean as necessary and replace the sump. Fig. 43 Case Front Panel Case Front Panel Securing Screws Fig. 44 Condensate Trap Gasket Sump Condensate Drain Elbow Control Box removed for clarity Flue Sampling Point Air Sampling Point
Сторінка 32 PDF
Сторінка 33
33 12.0 Servicing © Baxi Heating UK Ltd 2017 12.2 Annual Servicing Inspection (Cont) 5. Remove the clip securing the gas feed pipe to the air/gas venturi. Disconnect the pipe. Do not break the joint between the pipe and gas valve unless necessary. 6. Disconnect the electrode leads, noting their position, and the fan electrical plugs (Fig. 46). 7. Undo the four nuts retaining the combustion box cover to the heat exchanger. 8. Carefully draw the fan, collector and cover assembly forward (Figs. 46). 9. Clean any debris from the heat exchanger and check that the gaps between the tubes are clear. 10. Inspect the burner, electrodes position and insulation, cleaning or replacing if necessary. Clean any dirt or dust from the air box. 11. Carefully examine all seals, insulation & gaskets, replacing as necessary. Look for any evidence of leaks or corrosion, and if found determine & rectify the cause. Expansion Vessel Charge - 1.0 bar 12. To check the charge accurately ensure the system is cold. It is also necessary to relieve the pressure by draining the boiler. Using a suitable gauge check the pressure at the valve on the underside of the vessel. Adjust the pressure as required and repressurise the system. Note: A right angled valve extension will aid checking and repressurising. DHW Filter (Fig. 48) 13. If the flow of domestic hot water is diminished, it may be necessary to clean the filter. In areas of harder water it is recommended that this is performed annually. 14. Turn the DHW isolation cock (Fig. 47) off and draw off from a hot tap. 15. Remove the retaining clip and extract the filter cartridge and rinse thoroughly in clean water. Reassemble and check the flow. 16. Recommission the boiler as described in Section 10.0. 17. Complete the relevant Service Interval Record section of the Benchmark Commissioning Checklist at the rear of this publication and then hand it back to the user. 18. Reassemble in reverse order, ensuring the front case panel is securely fitted. Fig. 47 Inlet/Return Manifold Fig. 48 Filter Cartridge Clip Control Box removed for clarity DHW Isolation Cock Fig. 46 Fan, Collector and Cover Assembly Electrode Leads Electrode Position Fig. 45 Gas Feed Pipe Securing Clip 5 ±1 4 ±0.5 10 ±1 Spark Ignition Electrode Flame Sensing Electrode View underneath appliance
Сторінка 33 PDF
Сторінка 34
34 13.0 Changing Components © Baxi Heating UK Ltd 2017 IMPORTANT: When changing components ensure that both the gas and electrical supplies to the boiler are isolated before any work is started. When the component has been changed recommission the boiler as described in Section 10.0. Always examine any seals or gaskets, replacing where necessary. The Case Front Panel MUST seal effectively against the air box side panels. See Section 12.1 “Annual Servicing” for removal of case panel, door etc. 13.1 Spark Ignition & Flame Sensing Electrodes (Fig. 49) 1. Disconnect the electrode leads, noting their positions. 2. Remove the retaining screws securing each of the electrodes to the combustion box cover and remove the electrodes. 3. Check the condition of the sealing gaskets and replace if necessary. Reassemble in reverse order. 4. After changing the Flame Sensing Electrode check the combustion - see Section 14.1. 5. When satisfactory combustion readings are not obtained ensure the electrode position is correct and perform the combustion check again. 13.2 Fan (Fig. 50) 1. Remove the clip securing the gas feed pipe to the air/gas venturi. Disconnect the pipe. 2. Undo the screws securing the air/gas collector to the extension piece and disconnect the fan electrical plugs (Fig. 50). 3. Remove the collector and fan assembly, being careful to retain the gasket. 4. Undo the screws securing the fan to the collector. Retain the gasket. 5. Undo the screws securing the venturi to the fan (noting its position) and transfer to the new fan, replacing the seal if necessary. 6. Examine the gasket(s) and replace if necessary. 7. Reassemble in reverse order and perform the Calibration Function - see Section 14.2. 13.3 Air/Gas Venturi (Figs. 50 & 51) 1. Remove the clip securing the gas feed pipe to the venturi. 2. Undo the screws securing the collector to the extension piece and disconnect the fan electrical plugs. 3. Remove the collector and fan assembly, being careful to retain the gasket. 4. Undo the screws securing the venturi to the fan (noting its position) and fit the new venturi, replacing the seal if necessary. 5. Examine the gasket and replace if necessary. 6. After changing the venturi check the combustion - see Section 14.1. Fig. 49 Spark Ignition Electrode Flame Sensing Electrode Electrode Leads Cover Fan Fig. 50 Gasket Gas Feed Pipe Clip Venturi Gasket Fan Fig. 51 Air/Gas Collector Air/Gas Venturi Control Box removed for clarity
Сторінка 34 PDF
Сторінка 35
35 13.0 Changing Components © Baxi Heating UK Ltd 2017 13.4 Burner (Fig. 52) 1. Remove the clip securing the gas feed pipe to the air/gas venturi and disconnect the fan electrical plugs. 2. Undo the screws securing the air/gas collector to the extension piece. Note its orientation and remove the extension piece (where fitted) from the cover. 3. Undo the screws securing the burner. Withdraw the burner from the cover and replace with the new one. 4. Examine the gasket(s), replacing if necessary. Note: Where the extension piece is fitted the two gaskets are not the same ! 5. After changing the burner check the combustion. - see Section 14.1. 13.5 Insulation (Fig. 53) 1. Remove the clip securing the gas feed pipe to the air/gas venturi and disconnect the fan electrical plugs. 2. Remove the electrodes as described in section 13.1. 3. Undo the nuts holding the cover to the heat exchanger. Draw the air/gas collector, fan and cover assembly away. 4. Remove the cover insulation piece. 5. Fit the new insulation carefully over the burner and align it with the slots for the electrodes. 6. If the rear insulation requires replacement, remove it and all debris from the heat exchanger. Also it may be necessary to separately remove the spring clip from the pin in the centre of the heat exchanger and the ‘L’ shaped clips embedded in the insulation. 7. Do not remove the shrink-wrapped coating from the replacement rear insulation. Keep the insulation vertical and press firmly into position. 8. Examine the cover seal and replace if necessary. Reassemble in reverse order. Fig. 52 Heat Exchanger Rear Insulation Cover Insulation Seal Air/Gas Collector Electrode Leads Fig. 53 Control Box removed for clarity Cover Burner Gasket Extension Piece Air/Gas Collector Gasket Spark Ignition Electrode Flame Sensing Electrode
Сторінка 35 PDF
Сторінка 36
36 13.0 Changing Components © Baxi Heating UK Ltd 2017 13.6 Flue Sensor (Fig. 54) 1. For ease of access remove the Expansion Vessel as described in Section 13.22. 2. Ease the retaining tab on the sensor away and disconnect the electrical plug. 3. Turn the sensor 90° anticlockwise to remove - it is a bayonet connection. 4. Reassemble in reverse order. 13.7 Heating Flow & Return Sensors (Fig. 55) 1. There is one sensor on the flow (red wires) and one sensor on the return (blue wires). Note: For access to the return sensor first remove the fan and air/gas collector (see 13.2). 2. After noting the position prise the sensor clip off the pipe and disconnect the plug. 3. Connect the plug to the new sensor and ease the clip onto the pipe as close to the heat exchanger as possible. 13.8 Safety Thermostat (Fig. 55) 1. Pull the plug off the safety thermostat. 2. Remove the screws securing the thermostat to the mounting plate on the flow pipe. 3. Reassemble in reverse order, ensuring that the plug is pushed fully on. 13.9 DHW NTC Sensor (Fig. 56) 1. Turn off the mains cold water supply tap and draw off the residual domestic hot water. 2. Ease the retaining tab on the sensor away and disconnect the electrical plug. 3. Remove the retaining clip and withdraw the sensor from the hydraulic outlet assembly. Examine the ‘O’ ring, replacing if necessary. 4. Reassemble in reverse order. The plug will only fit one way. Flue Sensor Electrical Plug Fig. 54 Heating Flow Sensor Fig. 55 DHW NTC Sensor Fig. 56 Retaining Clip Control Box removed for clarity Safety Thermostat
Сторінка 36 PDF
Сторінка 37
37 13.0 Changing Components © Baxi Heating UK Ltd 2017 Automatic Air Vent Fig. 58 Pump Flow Pipe 13.10 Pump - Complete (Fig. 58) 1. Disconnect the electrical supply plugs from the pump. 2. Close the flow and return isolation taps and drain the boiler primary circuit. For ease of access remove the heating pressure gauge (13.14) & diverter valve motor (13.19). 3. Undo the three screws securing the body to the inlet assembly and pump flow pipe. Draw the complete pump forwards. 4. Remove the automatic air vent and transfer to the new pump body. 5. Examine the ‘O’ ring seals, replacing if necessary and reassemble in reverse order. 13.11 Automatic Air Vent (Fig. 58) 1. See Section 13.21 to remove the expansion vessel. Close the flow and return isolation taps and drain the primary circuit. 2. The automatic air vent is a bayonet fitting. Remove by twisting anticlockwise. 3. Fit the new automatic air vent, ensuring the ‘O’ ring is fitted and the cap is open . Reassemble in reverse order. Control Box removed for clarity
Сторінка 37 PDF
Сторінка 38
38 13.0 Changing Components © Baxi Heating UK Ltd 2017 13.12 Safety Pressure Relief Valve (Fig. 59) 1. Close the flow and return isolation taps and drain the primary circuit. 2. For access remove the screws securing the condensate trap, and pull off the pipe from the heat exchanger. Ease the trap to one side. 3. Disconnect the discharge pipe from the pressure relief valve and remove the sealing grommet. 4. Pull off the clip retaining the valve and withdraw it from the outlet assembly. 5. Fit the new valve and ‘O’ ring seal and reconnect the discharge pipe. Ensure the grommet is in place to maintain the integrity of the case seal. Refit the condensate trap. 13.13 Heating Pressure Gauge (Figs. 60 & 61) 1. Close the flow and return isolation taps and drain the primary circuit. 2. Remove the gauge from the boiler lower panel. 3. Remove the clip securing the pressure gauge capillary. 4. Fit the new gauge, ensuring that the capillary is routed to prevent any sharp bends. Reassemble in reverse order and ensure the gauge is firmly in position to maintain the integrity of the case seal. Fig. 61 Heating Pressure Gauge Capillary Clip Clip ‘O’ Ring Seal Pressure Relief Valve Discharge Pipe Control Box removed for clarity Fig. 59 Fig. 60 Heating Pressure Gauge
Сторінка 38 PDF
Сторінка 39
39 13.0 Changing Components © Baxi Heating UK Ltd 2017 Plate Heat Exchanger Rubber Seal Hydraulic Pressure Sensor Securing Clip (captive) Plate Heat Exchanger Securing Screws Pump, Gas Valve Assemblies and Pipework removed for clarity 13.14 Plate Heat Exchanger (Fig. 62) 1. Close the flow & return isolation taps and the cold mains inlet. Drain the primary circuit and draw off any residual DHW. 2. Refer to Annual Servicing Section 12.2 paragraphs 5 to 8 and remove the fan etc. 3. Undo the screws securing the plate heat exchanger to the hydraulic assembly. 4. Withdraw the plate heat exchanger upwards and to the left to remove. Seals 5. There are four rubber seals between the hydraulic assembly and heat exchanger which may need replacement. 6. Ease the seals out of the hydraulic assembly. Replace carefully, ensuring that the seal is inserted parallel and pushed fully in. 7. When fitting the new heat exchanger note that the right hand location stud is offset towards the centre (Fig. 62). 8. Reassemble in reverse order. 13.15 Hydraulic Pressure Sensor (Fig. 63) 1. Close the flow and return isolation taps and drain the primary circuit. Remove the fan and collector assembly. 2. Remove the plug from the sensor and pull the retaining clip forwards. The clip is captive and does not need to be fully removed. 3. Reassemble in reverse order. Control Box removed for clarity Plug Fig. 62 Fig. 63 R.H. Stud - Note offset
Сторінка 39 PDF
Сторінка 40
40 13.0 Changing Components © Baxi Heating UK Ltd 2017 13.16 DHW Flow Regulator & Filter (Fig. 64) 1. Remove the Fan & Collector (13.2). Close the cold mains inlet and draw off any residual DHW. 2. Pull out the securing clip and prise the regulator and filter assembly out of the hydraulic inlet assembly. 3. Twist the body to unlock the bayonet connection and remove the regulator. 4. Examine and clean the filter, and reassemble in reverse order. 13.17 DHW Flow Sensor (‘Hall Effect’ Sensor) (Fig. 65) 1. Pull the sensor off the DHW inlet manifold. 2. Disconnect the plug from the sensor and connect it to the new component. 3. Fit the new sensor, ensuring it is correctly oriented and fully engaged over the manifold. 13.18 Diverter Valve Motor (Fig. 66) 1. Undo the screw securing the electrical plug to the motor unit. Disconnect the plug. 2. For ease of access remove the pressure gauge and sealing grommet from the boiler bottom panel. 3. Hold the motor in place against the spring pressure of the valve and remove the securing clip. 4. Remove the motor. 5. When fitting the new motor it will be necessary to hold the unit firmly while depressing the valve return spring. 14.25 Pump, Gas Valve Assemblies and Pipework removed for clarity DHW Flow Sensor (‘Hall Effect’ Sensor) DHW Flow Regulator & Filter Diverter Valve Motor Control Box removed for clarity Securing Clip Electrical Plug Fig. 64 Fig. 65 Fig. 66
Сторінка 40 PDF
Сторінка 41
41 13.0 Changing Components © Baxi Heating UK Ltd 2017 13.19 P.C.B. & R.D.S. (Removable Data Stick) (Fig. 64) NOTE: Both P.C.B. and R.D.S. are available as spare parts. The P.C.B. is suitable for any boiler model. An R.D.S. specific to the boiler model output & gas type will be required if the R.D.S. from the original P.C.B. is not being transferred. It is recommended that P.C.B. and R.D.S. are replaced together. 1. Ensure that the power to the boiler is isolated and wait 10 seconds. 2. Remove the screws securing the control box cover and release the cover retaining barbs from their slots. 3. Note the position of all plugs and wires on the P.C.B. and disconnect them. 4. Undo the securing screws and remove the P.C.B. IMPORTANT: If only the P.C.B. is being replaced transfer the R.D.S. from the original board to the new one. Where both P.C.B. and R.D.S. are being replaced ensure the new R.D.S. is on new the board. 5. Reassemble in reverse order. Ensure that the ignition lead is connected correctly. 6. P.C.B. ONLY changed - Check the Combustion - see Section 14.1. 7. P.C.B. & R.D.S. changed - enable the Calibration Function as described in Section 14.2, then Check the Combustion - see Section 14.1. Fig. 67 R.D.S. X23 X37 X36 X22 X20 X24 X10 X11 X12 X13 X1 X2 X3 Note the correct orientation of the R.D.S. Position with the chamfer as shown. Slot for Ignition Lead
Сторінка 41 PDF
Сторінка 42
42 13.0 Changing Components © Baxi Heating UK Ltd 2017 13.20 Gas Valve (Fig. 68) IMPORTANT: After replacing the valve the CO2 must be calibrated as detailed in Section 14.0 Combustion & Calibration. Only change the valve if a suitable calibrated combustion analyser is available, operated by a competent person - see section 12.1. 1. Turn the gas cock off and undo the nut under the boiler. Retain the washer. 2. Remove the electrical plug from the valve. 3. Undo the nut on the gas feed pipe and ease the pipe aside. It is recommended that the injector washer is changed as well. 4. Remove the screws securing the gas valve to the boiler bottom panel. 5. Reassemble in reverse order, ensuring the injector washer is in place, and perform the Calibration Function & Combustion Check - see Sections 14.1 & 14.2. NOTE: Check for gas tightness after replacing gas valve. 13.21 Expansion Vessel (Fig. 69) 1. Before replacing the vessel it is recommended that the pressure is checked if there are no apparent leaks or defects. Expansion Vessel Charge - 1.0 bar 2. To check the charge accurately ensure the system is cold. It is also necessary to relieve the pressure by draining the boiler. Using a suitable gauge check the pressure at the valve on the underside of the vessel. Adjust the pressure as required and repressurise the system. Note: A right angled valve extension will aid checking and repressurising. 3. If the above procedure is unsuccessful replace the vessel as described below. 4. Close the flow and return isolation taps and drain the primary circuit. 5. Prise off the securing clip and disconnect the braided hose from the vessel, taking care as water may still be in the vessel. 6. Ensure that the hose is free of restriction as a boiler with a blocked hose will exhibit symptoms similar to one with a failed vessel. 7 . Whilst supporting the vessel undo the locknut and manoeuvre the vessel out of the boiler. 8. Reassemble in reverse order. Gas Valve Gas Cock Fig. 68 Electrical Plug Expansion Vessel Lock Nut Fig. 69 Washer Injector Washer Gas Feed Pipe NOTE: The Injector Washer MUST be fitted as shown between the Valve & Pipe. DO NOT fit the Injector Washer between the Gas Cock & Valve
Сторінка 42 PDF
Сторінка 43
43 © Baxi Heating UK Ltd 2017 Fig. 70 Plug Analyser Probe 14.0 Combustion & Calibration 14.1 Checking the Combustion 1. Combustion should be:- Natural Gas 9.0% CO2 ± 0.7 Propane 10.5% CO2 ± 1.0 at all 3 fan speeds:- ‘100’ (Maximum), the Ignition Phase speed and ‘00’(Minimum). 2. Press & together and hold for at least 6 seconds. ‘On’ will be displayed briefly, followed by ‘304’ then the boiler CH output expressed as percentage i.e. ‘100’. It may be necessary to open one or more hot taps in order to maintain the boiler at full rate. 3. Insert the analyser probe and once stabilised note the CO2 reading. 4. Press to select the Ignition Phase Speed. A value will be displayed, e.g. ‘33’. Note the CO2 reading. 5. Press again to select the Minimum Output. ‘00’ will be displayed. Note the CO2 reading. 6. If the CO2 is not within the tolerances referred to above at any of the speeds, follow the procedure in Section 14.3 opposite to calibrate the boiler. 7. To exit the function press & together for 6 seconds. 14.2 Calibration Function IMPORTANT: Do not commence the Calibration Function whilst the burner is lit ! The case front panel MUST be fitted. NOTE: To obtain an accurate measurement on smaller capacity systems it may be necessary to open one or more hot taps in order to maintain the boiler at full rate. 1. The function is activated by pressing buttons and together for 6 seconds then quickly pressing button while ‘On’ is displayed. The Ignition Phase fan speed code will then be displayed. Calibration will take approximately 5 minutes. 2. If ‘303’ is displayed, then the Calibration Function has not been activated correctly. Isolate and reinstate all power sources to the boiler and repeat the above. 3. The boiler will automatically calibrate at ‘100’, the Ignition Phase speed then ‘00’. These represent the percentage of MAXIMUM fan speed (i.e. ‘00’ is MINIMUM fan speed). Once the boiler has stabilised and self-calibrated at each fan speed the and symbols will be displayed before the next speed is automatically set. 4. When self-calibration is complete the boiler will run at MINIMUM fan speed (‘00’displayed). The following symbols will also be displayed flashing together at regular intervals. 5. To exit the function press . ‘ESC’ will be displayed and the calibration function completed. R R IMPORTANT: DO NOT insert the Analyser Probe into the Test Point immediately. This will prevent saturation of the analyser. During the Calibration Function the combustion ratio may increase for a short time while the boiler performance is optimised. The person carrying out a combustion measurement should have been assessed as competent in the use of a flue gas analyser and the interpretation of the results. The flue gas analyser used should be one meeting the requirements of BS7927 or BS-EN50379-3 and be calibrated in accordance with the analyser manufacturers’ requirements. 14.3 Adjusting the CO2 1. Press & together and hold for at least 6 seconds. ‘On’ will be displayed briefly, followed by ‘304’ then the boiler CH output expressed as percentage i.e. ‘100’. 2. Press to select the adjustment function. ‘0’ will alternate with ‘304’. Using the & buttons adjust ‘0’ between ‘-3’ & ‘3’. 3. Decreasing the value lowers the CO2, and selecting a higher value will increase CO2. 4. Once the correct CO2 reading is achieved press to return to the fan speed selection. 5. Using or to select the next fan speed. ‘00’ indicates MINIMUM speed, the other speed (Ignition Phase) will be indicated by, for example ‘33’ (this varies depending on boiler model). 6. Repeat step 2. above to adjust the CO2.at Ignition Phase and Minimum fan speeds. Press & together and hold for at least 6 seconds to exit the function. Flue Sampling Point Air Sampling Point
Сторінка 43 PDF
Сторінка 44
44 15.0 Electrical © Baxi Heating UK Ltd 2017 15.1 Illustrated Wiring Diagram X23 X37 X36 X22 X20 X24 X10 X11 X12 X13 X1 X2 Flue Sensor Heating Return Sensor Heating Flow Sensor Spark Ignition Electrode Flame Sensing Electrode Gas Valve Fan Safety Thermostat Diverter Valve Motor Hydraulic Pressure Switch DHW NTC Sensor Pump Hall Effect Sensor X3 b r w b b r r r bk g b g br w b g br bk b b g g b b br b b bk g/y b bk br g/y g/y g/y M1 Mains Voltage Terminal Strip b br b M2 Low Voltage External Control Connection br b br X31 bk bk br br b br 1 2 3 4 5 12 34 5 67 89 10 Key To Wiring Colours b - Blue bk - Black br - Brown w - White gr - Grey r - Red g - Green g/y - Green/Yellow y - Yellow
Сторінка 44 PDF
Сторінка 45
45 16.0 Short Parts List © Baxi Heating UK Ltd 2017 Short Parts List Key Description Manufacturers No. No. Part No. A Fan 720768101 B Burner 7225221 C Spark Ignition Electrode 720767301 D Flame Sensing Electrode 720767101 E Gas Valve 720752301 F Safety Thermostat 720765301 G Hall Effect Sensor 720061801 I Plate Heat Exchanger 720852401 J Diverter Valve Motor 720776801 K Pump 7220533 M Heating Flow/Return Sensor 720747101 N DHW NTC Sensor 720777001 O Pump Automatic Air Vent 720777601 P Hydraulic Pressure Switch 720778001 Q Heating Pressure Gauge 720776601 R Flue Sensor 5114747 S PCB only 7678800 T R.D.S. - 24 7681033 R.D.S. - 28 7678783 R.D.S. - 24 LPG 7681034 R.D.S. - 28 LPG 7678794 U Injector Washer - 24 (Ø 4.4) 720751701 Injector Washer - 28 (Ø 4.6) 720775801 V Air/Gas Venturi 720768301 A B C D I F G K J O N P M Q R E V S T U
Сторінка 45 PDF
Сторінка 46
46 17.0 Fault Finding & ‘Service Due’ © Baxi Heating UK Ltd 2017 17.1 Initial Fault Finding Checks 1. Check that gas, water and electrical supplies are available at the boiler. 2. Electrical supply = 230V ~ 50 Hz. 3. The preferred minimum gas pressure is 20 mb (NG) 37mb (LPG) 4. Carry out electrical system checks, i.e. Earth Continuity, Resistance to Earth, Short Circuit and Polarity with a suitable meter. NOTE: These checks must be repeated after any servicing or fault finding. 5. Ensure all external controls are calling for heat and check all external and internal fuses. Before any servicing or replacement of parts, ensure the gas and electrical supplies are isolated. 17.2 Error Codes 1. If a fault occurs on the boiler an error code may be shown by the facia display. 2. The codes are a flashing number, either two or three digit, preceded by the symbol :- followed by 20, 28, 40, 160 or 321 indicates possible faulty components. followed by 55 (after replacing R.D.S.) indicates calibration required (Section 14.2). 110 indicates overheat of the primary system water. 117 is displayed when the primary water pressure is greater than 2.7 bar. 118 is displayed when the primary water pressure is less than 0.5 bar. 133, 134 and 135 indicate that the gas supply has been interrupted, ignition has failed or the flame has not been detected. 128 is displayed if there has been a flame failure during normal operation. 125 is displayed in either of two situations:- i) If between 15 and 30 seconds of the burner lighting the boiler temperature has not changed by 1°C. ii) If within 10 minutes of the burner lighting the boiler actual temperature twice exceeds the selected temperature by 30°. In these instances poor primary circulation is indicated. 3. By pressing the 'Reset' button for 1 to 3 seconds when 110, 125, 133, 134, 135, 09, 15, 128 & 384 are displayed it is possible to relight the boiler. 4. If this does not have any effect, or the codes are displayed regularly further investigation is required. Gas Valve Connection Cable Gas Valve Fault Central Heating NTC Fault Flue NTC Fault Central Heating Return NTC Fault Calibration Required Pre-circulation Fault Safety Thermostat Operated Primary System Water Pressure Too High Primary System Water Pressure Too Low Circulation Fault (Primary) Flame Failure Flue NTC Operated Interruption Of Gas Supply or Flame Failure Elapsed Time - Gas Valve Open Without Gas Interruption Of Gas Supply (Internal Error) Flow/Return Sensor Temperature Test Fan or Fan Wiring Fault Circulation Fault (Dry Fire) Hot Water NTC Fault False Flame 09 15 20 28 40 55 109 110 117 118 125 128 130 133 134 135 154 160 270 321 384 Table Of Error Codes The button can be pressed so that the display shows the following information:- 1 press - ‘00’ alternates with Sub-Code (only when fault on boiler) or ‘000’ 2 presses - ‘01’ alternates with CH Temperature 3 presses - ‘02’ alternates with Outside Temperature (where Sensor fitted) 4 presses - ‘03’ alternates with DHW Temperature 5 presses - ‘04’ alternates with DHW Temperature 6 presses - ‘05’ alternates with System Water Pressure 7 presses - ‘06’ alternates with Return Temperature 8 presses - ‘04’ alternates with Flue Temperature 9 presses - ‘05’ alternates with Heat Exchanger Temperature
Сторінка 46 PDF
Сторінка 47
47 17.0 Fault Finding © Baxi Heating UK Ltd 2017 Refer to “Illustrated Wiring Diagram” for position of terminals and components Central Heating - Follow operational sequence Turn on mains power The display illuminates 20, 28, 40 or 321 flashing 117 or 118 flashing 09, 15, 110, 125, 133, 134, 135 or 384 flashing Set Central Heating temperature to Maximum. symbol flashing, pump runs Go to section ‘A’ Go to section ‘D’ Ensure all controls and programmers are calling for heat Go to section ‘B’ If 110 is still flashing go to section ‘H’ YES YES NO NO NO YES YES YES NO YES YES YES NO NO NO Go to section ‘I’ Ensure controls are set to demand and verify the contacts are closed NO Press the reset button for 1 to 3 seconds YES Fan runs after up to 3 minutes 160 flashing Go to section ‘C’ NO If 09, 15, 110 or 384 is flashing or re-occurs regularly, check all PCB connections. If this has no effect replace the PCB. Fan runs at correct speed 160 flashing Go to section ‘C’ Spark at ignition electrodes up to 5 seconds & for 3 attempts Go to section ‘F’. Press the reset button for 1 to 3 seconds YES Burner lights Go to section ‘E’ Burner goes out after 5 seconds 133 flashing Go to section ‘G’ YES YES NO 109 flashing 125 flashing after 1 min Go to section ‘J’ YES YES 110 flashing NO Go to section ‘H’ YES NO Diverter Valve open to Central Heating circuit NO Go to section ‘K’ YES Burner modulates to maintain set temperature Check Heating Flow sensor. Go to section ‘D’ NO 130 flashing NO Go to section ‘M’ YES Burner goes out NO Fan stops after 10 seconds YES Boiler operation correct YES 133 flashing
Сторінка 47 PDF
Сторінка 48
48 17.0 Fault Finding © Baxi Heating UK Ltd 2017 Domestic Hot Water - Follow operational sequence Turn on mains power The display illuminates 20, 28, 40 or 321 flashing 117 or 118 flashing 09, 15, 110, 125, 133, 134, 135 or 384 flashing Set Hot Water temperature to Maximum & fully open hot tap. symbol flashing, pump runs Go to section ‘A’ Go to section ‘D’ DHW flow rate greater than 2litres/min Burner lights 133 flashing If 110 is still flashing go to section ‘H’ YES YES NO NO NO YES YES YES NO YES YES YES NO NO NO Go to section ‘I’ NO Press the reset button for 1 to 3 seconds NO Fan runs after up to 3 minutes 160 flashing Go to section ‘C’ NO If 09, 15, 110 or 384 is flashing or re-occurs regularly, check all PCB connections. If this has no effect replace the PCB. Fan runs at correct speed 160 flashing Go to section ‘C’ Spark at ignition electrodes up to 5 seconds & for 3 attempts Go to section ‘F’. Press the reset button for 1 to 3 seconds YES Burner lights Go to section ‘E’ Burner goes out after 5 seconds 133 flashing Go to section ‘G’ YES YES NO 109 flashing 125 flashing after 1 min Go to section ‘J’ YES YES 110 flashing NO Go to section ‘H’ YES NO 3 Way Valve open to Domestic Hot Water circuit NO Go to section ‘K’ YES Burner modulates to maintain set temperature Check CH NTC sensor. Go to section ‘D’ NO 130 flashing NO Go to section ‘M’ YES Burner goes out NO Fan stops after 10 seconds YES Boiler operation correct YES Go to section ‘L’ NO Go to section ‘L’ Go to section ‘B’ YES
Сторінка 48 PDF
Сторінка 49
49 17.0 Fault Finding © Baxi Heating UK Ltd 2017 Fault Finding Solutions Sections Is there 230V at: Main terminals L and N Check electrical supply 1. NO Main terminal fuse Replace fuse Display illuminated 2. NO PCB - X10 connector Main terminals L and N Check wiring 3. NO NO A B C NO Fan connections correct at fan & PCB X11 and X23 connectors - see Wiring Diagram. Make connections Fan jammed or faulty wiring Connection OK at X10 Display or Main PCB fault Switch to DHW mode maximum flow and press reset. During next 3 minutes check:- 230V at PCB - X13 connector (between blue & brown - see Wiring Diagram) NO Replace PCB YES 230V between PCB - X13 connector (blue) and PCB - X11 connector (black) - see Wiring Diagram NO Replace PCB YES 230V at pump YES Replace pump NO Check wiring 230V at PCB - X11 connector (between blue & brown - see Wiring Diagram) YES NO Replace PCB Replace fan or wire YES YES Temperature sensor faulty. Check correct location and wiring. NO D Replace sensor Cold resistance approximately 10kΩ @ 25° C (DHW and CH sensors) (resistance reduces with increase in temp.) YES Gas at burner Ensure gas is on and purged Replace PCB Replace gas valve & Check combustion Check wiring and PCB - X36 connector see Wiring Diagram YES NO NO E
Сторінка 49 PDF
Сторінка 50
50 17.0 Fault Finding © Baxi Heating UK Ltd 2017 Replace PCB Check and correct if necessary 1. Ignition electrode and lead 2. Electrode connection 3. Spark gap and position Check wiring - see Diagram YES NO F 5 ±1 4 ±0.5 10 ±1 Spark Ignition Electrode Flame Sensing Electrode Electrode Position Viewing Window Burner Check and correct if necessary 1. The set of the gas valve (CO2 values - see instruction) 2. Flame sensing electrode and lead connections 3. Flame sensing electrode position 1. 2. G Replace sensing electrode or PCB Replace PCB YES Replace safety thermostat YES NO Safety Thermostat operated or faulty Check for and correct any system faults H Allow to cool. Continuity across thermostat terminals more than 1.5 ohm NO Check Flow & Return Sensors - see section ‘D’ NO Is 110 still flashing ? YES Check supply pressure at the gas valve:- Natural Gas - Minimum 17 mbar Propane - Minimum 37 mbar
Сторінка 50 PDF
Сторінка 51
51 © Baxi Heating UK Ltd 2017 17.0 Fault Finding I M Temperature sensors faulty. Cold resistance approximately 10kΩ @ 25° C (CH sensor) 20kΩ @ 25° C (Flue sensor) (resistance reduces with increase in temp.) NO Replace sensor YES If pump is running the heat exchanger could be obstructed Replace heat exchanger 1. 2. Replace hydraulic pressure sensor YES Restore system pressure YES NO CH system pressure less than 0.5 bar or greater than 2.7 bar Check wiring and PCB - X22 connector for approx. 5V DC between green & black - see Wiring Diagram Replace PCB NO J Replace sensor NO System fault - correct NO YES Ensure that the boiler and system are fully vented Check flow temperature sensor connections and position. Cold resistance approximately 10kΩ @ 25° C (CH sensors) (resistance reduces with increase in temp.) YES Go to section ‘B’ K Is there 230V at: Diverter valve motor Replace diverter valve motor 1. YES PCB - X13 connector terminals between:- Blue & Black (central heating mode) Blue & Brown (domestic hot water mode) see Wiring Diagram Replace PCB 2. NO Check diverter valve motor cable YES L YES NO Replace PCB Replace Hall Effect Sensor Is mains water filter & assembly clean, and rotor moving freely ? Clean or replace NO Check wiring and PCB - X22 connector for approx. 5V DC between red & blue from Hall effect sensor - see Wiring Diagram YES
Сторінка 51 PDF
Сторінка 52
52 © Baxi Heating UK Ltd 2017 18.0 External Low Voltage Controls 18.1 Optional Outdoor Sensor & External Controls 1. When one of the optional Baxi 7 day wired, 7 day wireless or 24hr wireless sensors is connected to 1 & 2 of boiler wiring terminal M2 the outdoor sensor curve must be set from the wired or wireless sensor. 2. The method of setting the curve is described in the instructions supplied with the wired or wireless sensor. 3. However, if a proprietary OpenTherm® device is to be connected to 1 & 2 of boiler wiring terminal M2 it is necessary to set the outdoor sensor curve using the boiler central heating temperature buttons BEFORE connecting the OpenTherm® device. 4. If future adjustment of the curve is required then the device must be disconnected beforehand. 18.2 External Controls connected to M2 1. When one of the optional wired or wireless sensors or a proprietary OpenTherm® device is connected to 1 & 2 of boiler wiring terminal M2 the operation of the boiler central heating and domestic hot water temperature buttons is altered. 2. They can no longer be used to set the heating or hot water temperature, which must be done using the optional sensor or proprietary OpenTherm® device which overrides the boiler control buttons. 3. The buttons must still be used when activating the De-Aeration or ‘Chimney Sweep’ functions for example.
Сторінка 52 PDF
Сторінка 53
53 © Baxi Heating UK Ltd 2017 Low Voltage Terminal Block ODS Connection N S W E X X Outdoor Temperature Boiler Flow Temperature North West 1/2 H 2.5m Min H 18.0 External Low Voltage Controls 18.3 Positioning the Optional Outdoor Sensor 1. The Sensor must be fixed to an external wall surface of the property it is serving. The wall must face a north or west. Note: DO NOT position it on a south facing wall in direct sunlight ! 2. The Sensor should be approximately half the height of the living space of the property, and a minimum of 2.5m above ground level. 3. It must be positioned away from any sources of heat or cooling (e.g. flue terminal) to ensure accurate operation. Siting the Sensor above doors and windows, adjacent to vents and close to eaves should be avoided. 18.4 Connecting the Optional Outdoor Sensor 1. Ensure the electrical supply to the boiler is isolated. Undo the securing screws and lift the case front panel off. 2. Disengage the securing tab and hinge the control box downwards. Undo the terminal block cover securing screw and remove the cover. 3. Remove one of the grommets, pierce the diaphragm and insert the wires from the Outdoor Sensor. 4. Leave sufficient slack in the wires to allow the Control Box to be hinged fully open. Refit the grommet. 5. Connect the wires from the Outdoor Sensor to positions 4 & 5 on M2 as shown. Refit the cover. 18.5 Setting the Sensor Curve 1. Ensure that there is power to the boiler. 2. The Central Heating temperature buttons & are used to select the desired curve as shown on the graph. 3. Normally the display will show the current temperature of the water in the boiler (e.g. 41°C). As the buttons are pressed the curve identification code the will be shown, from ‘00’ to ‘90’. 4. To select the most appropriate curve consideration must be given to the expected outdoor temperature range. This must then be compared to a boiler flow temperature that will satisfy the needs of the user, e.g. If outdoor temperatures in the range 0°C to -5°C are anticipated and a boiler flow of no more than 60°C required, select Curve ‘20’ . 5. As a further example, if Curve ‘40’ is selected, at an outside temperature of 5°C the boiler flow temperature will be just below 70°C. In the event of the outside temperature falling to 0°C, the boiler flow will increase to 80°C. 6. Continue with the installation and commissioning of the boiler as described in the Installation & Servicing Instructions. 7. Explain to the user how to select a different temperature curve. Baxi Optional Outdoor Sensor
Сторінка 53 PDF
Сторінка 54
54 © Baxi Heating UK Ltd 2017 18.0 External Low Voltage Controls 18.6 Connecting the Optional 7 Day Wired Sensor NOTE: The yellow link wire between terminals 1 & 2 on terminal block M1 MUST be removed when fitting the 7 Day Wired Sensor. 1. Ensure that the power to the boiler is isolated. 2. Remove the backplate from the unit by pressing down on the rear tab and easing apart. 3. Locate the sensor and use wiring as described in the literature supplied with it. 4. Pass the wiring through the slots in the backplate and connect as shown opposite to 2 & 3 on the sensor backplate and 1 & 2 open therm connections (not polarised) of boiler terminal M2. 5. Complete fitting as described in the sensor literature, turn the power back on and set the controls to the requirements of the user. Baxi Optional 7 Day Wired Sensor 1. Press Securing Tab 2. Ease away from Backplate 1 2 3 Programmer & Room Sensor Backplate Boiler Wiring Terminal M2 Low Voltage Terminal Block Boiler Mains Voltage Terminal Block M1 1 2 3 4 5 6 7 8 9 10 IMPORTANT ! IMPORTANT ! When fitting Low Voltage Controls remove the Yellow Link Wire from the Boiler Terminal Block M1 1 2 3 4 5 N L } RT/OT - Room Thermostat/Open Therm Connection } ODS - Outdoor Sensor Connection
Сторінка 54 PDF
Сторінка 55
55 © Baxi Heating UK Ltd 2017 Baxi Optional 7 Day Wireless Sensor & 24hr Wireless Sensor 18.0 External Low Voltage Controls 18.7 Connecting the Optional 7 Day Wireless Sensor & 24hr Wireless Sensor (kit includes a Sensor & Receiver - the Receiver is wired into the boiler). NOTE: The yellow link wire between terminals 1 & 2 on terminal block M1 MUST be removed when fitting the 7 Day Wireless Sensor & 24hr Wireless Sensor. 1. Ensure that the power to the boiler is isolated. 2. Remove the backplate from the receiver unit by pressing down on the rear tab and easing apart. 3. Locate the receiver and use wiring as described in the literature supplied with it. 4. Pass the wiring through the slots in the backplate and connect as shown opposite to the OT connection on the receiver backplate and 1 & 2 open therm connections (not polarised) of boiler terminal M2. 5. Complete fitting as described in the sensor/receiver literature, turn the power back on and set the controls to the requirements of the user. 1. Press Securing Tab. 2. Ease Backplate away. Boiler Wiring Terminal M2 Low Voltage Terminal Block Boiler Mains Voltage Terminal Block M1 1 2 3 4 5 6 7 8 9 10 IMPORTANT ! IMPORTANT ! When fitting Low Voltage Controls remove the Yellow Link Wire from the Boiler Terminal Block M1 1 2 3 4 5 N L } RT/OT - Room Thermostat/Open Therm Connection OT OT
Сторінка 55 PDF
Сторінка 56
56 © Baxi Heating UK Ltd 2017 19.0 ‘Service Due’ Message ‘Service Due’ Message Resetting/De-activation/Activation The message is NOT ACTIVATED as a factory setting but can be activated at any time. 1. When activated the ‘Service Due’ message will be shown on the boiler display after 11 months operation . (If the installation has been subject to prolonged electrical isolation or power cuts this period may be longer than 11 months) 2. Once the service has been completed satisfactorily the ‘Service Due’ message can be reset or de-activated. To Reset If the function requires resetting proceed as follows:- 4. Press & for 6 seconds. Using scroll through until ‘22’ is displayed. Press . 5. Press to scroll to ‘15’. Confirm with then press to return the display to normal. To De-activate When the function is no longer required proceed as follows:- 6. Press & for 6 seconds. Using scroll through until ‘22’ is displayed. Press . 7. Press until ‘22’ is displayed again. Press . Using scroll through to ‘50’. Press . 8. Press until ‘25’ is displayed. Confirm with then press to return the display to normal. To Activate If the function requires activating proceed as follows:- 9. Press & for 6 seconds. Using scroll through until ‘22’ is displayed. Press . 10. Press until ‘22’ is displayed again. Press . Using scroll through to ‘50’. Press . 11. Press until ‘11’ is displayed. Confirm with then press to return the display to normal. R R R
Сторінка 56 PDF
Сторінка 57
57 © Baxi Heating UK Ltd 2017 Notes
Сторінка 57 PDF
Сторінка 58
*All installations in England and Wales must be to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance will then be issued to the customer. www.centralheating.co.uk © Heating and Hotwater Industry Council (HHIC) This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the warranty. This does not affect the customer’s statutory rights. GAS BOILER SYSTEM COMMISSIONING CHECKLIST Customer name: Telephone number: Address: Boiler make and model: Boiler serial number: Commissioned by (PRINT NAME): Gas Safe register number: Company name: Telephone number: Company address: Commissioning date: CONTROLS (tick the appropriate boxes) Time and temperature control to heating Room thermostat and programmer/timer Programmable room thermostat Load/weather compensation Optimum start control Time and temperature control to hot water Cylinder thermostat and programmer/timer Combination Boiler Heating zone valves Fitted Not required Hot water zone valves Fitted Not required Thermostatic radiator valves Fitted Not required Automatic bypass to system Fitted Not required Boiler interlock Provided ALL SYSTEMS ’s instructions Yes What system cleaner was used? What inhibitor was used? Quantity litres Yes No CENTRAL HEATING MODE measure and record: Gas rate m³/hr OR ft³/hr Burner operating pressure (if applicable) mbar OR Gas inlet pressure mbar °C Central heating return temperature °C COMBINATION BOILERS ONLY Is the installation in a hard water area (above 200ppm)? Yes No Yes No DOMESTIC HOT WATER MODE Measure and Record: Gas rate m³/hr OR ft³/hr Burner operating pressure (at maximum rate) mbar OR Gas inlet pressure at maximum rate mbar Cold water inlet temperature °C Hot water has been checked at all outlets Yes Temperature °C I/min CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798 Yes ALL INSTALLATIONS Record the following: At max. rate: CO ppm AND CO/CO² Ratio At min. rate: (where possible) CO ppm AND CO/CO² Ratio The heating and hot water system complies with the appropriate Building Regulations Yes The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions Yes The operation of the boiler and system controls have been demonstrated to and understood by the customer Yes The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes Commissioning Engineer’s Signature Customer’s Signature www.centralheating.co.uk 58
Сторінка 58 PDF
Сторінка 59
www.centralheating.co.uk It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. SERVICE RECORD SERVICE 01 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 02 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 03 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 04 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 05 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 06 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 07 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 08 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 09 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature SERVICE 10 Date: Engineer name: Company name: Telephone No: Gas safe register No: Record: At max. rate: CO ppm AND CO² % At min. rate: (Where Possible) CO ppm AND CO² % Comments: Signature *All installations in England and Wales must be to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance will then be issued to the customer. © Heating and Hotwater Industry Council (HHIC) 59
Сторінка 59 PDF
Сторінка 60
7659607-02 (04/17) 0086 Baxi Customer Support 0344 871 1545 Opening hours Monday - Friday, 8.00am-6.00pm Weekends and Bank Holidays, 8.30am-2.00pm Please note calls may be recorded for training and monitoring purposes baxi.co.uk Register now to activate your warranty: www.baxi.co.uk/registration For the warranty to be maintained, please make sure... Benchmark checklist is completed Warranty is registered within 30 days The boiler has an annual service 1 2 3 For full terms and conditions, visit www.baxi.co.uk/terms. Failure to adhere to terms and conditions will void your manufacturer’s warranty. Baxi Brooks House, Coventry Road, Warwick, CV34 4LL Please ensure the boiler is installed in accordance with these installation instructions and that you adhere to the Building Regulations. e&oe All descriptions and illustrations provided in this document have been carefully prepared but we reserve the right to make changes and improvements in our products which may affect the accuracy of the information contained in this leaflet. All goods are sold subject to our standard Conditions of Sale which are available on request.
Сторінка 60 PDF